| Location: | Connecticut |
|---|---|
| Posted: | Oct 1, 2025 |
| Due: | Oct 29, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25/26-14 |
| Publication URL: | To access bid details, please log in. |
Work under this contract includes the construction of approximately 1360' of bituminous concrete sidewalk and approximately 780' of gravel access road in Center Springs Park in Manchester. It includes excavation, grading, segmental block retaining wall construction, embankment construction, turf establishment and landscaping. The Project Schedule for this project is projected to be completed within ONE HUNDRED (100) WORKING DAYS (contract days).
Cora Narracci 494 Main St Manchester CT, 06040 United States Tel: 8606473033 Fax: cnarracci@manchesterct.gov

With GovernmentContracts, you can:
...Gravel Crushing Operations - Bulky Waste Facility Landfill The Town of Glastonbury is ...
State Government of Connecticut
Bid Due: 9/24/2026
...of the filter fabric, sand below and the geomembrane and assure the gravel ...
State Government of Connecticut
Bid Due: 10/07/2026
...of the filter fabric, sand below and the geomembrane and assure the gravel ...
City of Meriden
Bid Due: 10/07/2026