APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
A brief summary of the scope is provided below. For complete details please download the Statement of Work attached to this notice.
The LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low-pressure suction side of the main LAr Circulation Pump (not part of this scope). It is also responsible for transferring liquid argon downstream of the main LAr Circulation Pump (not part of this scope) through the system resistance (friction and internal losses in valves, piping, etc.) to the LAr Purification system. The selected vendor will engineer and manufacture the vacuum jacketed pump valve box (part of the scope) that will house the pump, the MLI insulated upstream and downstream piping, isolation valves, and instrumentation required for this operation laid out above. The cryogenic equipment in the Detector Caverns will need to be properly protected and accessible with the use of platforms, ladders, support beams and railings (all part of this scope).
Scope Overview of the Supply Structure
The LAr Circulation System VD and HD acquisition is broken down into the equipment, valves and instrumentation that are detailed in the SOW
• Vacuum Jacketed Pump Valve Box
• MLI insulated upstream and downstream piping of the main LAr Circulation Pumps (Pumps are not part of Supply)
• Instrumentation
• Isolation Valves
• Pressure Safety Valves
• Cryogenic Equipment Protection (Platforms, Ladders and Supports
| Nov 5, 2025 | [Solicitation (Original)] LBNF Liquid Argon LAr Circulation Equipment |
| Nov 26, 2025 | [Solicitation (Updated)] LBNF Liquid Argon LAr Circulation Equipment |
| Dec 31, 2025 | [Solicitation (Updated)] LBNF Liquid Argon LAr Circulation Equipment |

With GovernmentContracts, you can: