| Location: | Georgia |
|---|---|
| Posted: | Feb 3, 2026 |
| Due: | Mar 5, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-99658-NONST-2026-000000004 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-99658-NONST-2026-000000004 | Hard Labor Creek Water Transmission Main Phase II | Walton County Water And Sewerage Authority |
Feb 03, 2026 @ 12:21 PM
|
Mar 05, 2026 @ 02:00 PM
|
Start Date: Feb 03, 2026 @ 12:21 PM ET
End Date:
Mar 05, 2026 @ 02:00 PM ET
Sealed bids will be received by the Walton County Water & Sewerage Authority for furnishing all materials, labor, tools, equipment, and any other miscellaneous items necessary for the Hard Labor Creek Water Transmission Main Phase II in Walton County, GA.
Special Conditions: This notice is ONLY for bidders that have already prequalified under the Pre-Qualification for Hard Labor Creek Water Transmission Main submitted on October 9, 2025 and approved by the Walton County Water and Sewerage Authority on November 13, 2025.
Bids will be received at the Walton County Water & Sewerage Authority, 2171 Highway 81, Loganville, GA 30052 until 2:00 p.m. local time on Thursday, March 5, 2026. Any bid received after said time and date of bid opening will not be considered by OWNER. Bids will be publicly opened and read aloud at this time and location. All bids will be evaluated by OWNER and the project will be awarded, if it is awarded, within sixty (60) days of the bid opening.
The Project consists of, but is not limited to the following major elements:
Construction of approximately 20,300 linear feet of 30-inch ductile iron pipe water main, 170 feet of 42-inch steel cased jack and bore, 11 gate valves ranging in size from 6-inch to 30-inch, seven air release valve assemblies, six fire hydrants, and connection to the water main installed under Phase 1 of the Hard Labor Creek Water Transmission Main project complete in place, pressure tested and disinfected, ready to operate, and any additional associated work as specified and indicated in the contract documents.
For general information regarding this project, you may email Natalie Pifer 861np@ppi.us.
| Code | Description |
| 91340 | Construction, Pipeline, Including Aerial Crossings |
| 91360 | Construction, Water System, Plants, Main and Service Line |
| 91378 | Maintenance and Repair, Pipeline, Including Removal and Relocation |
| 91392 | Maintenance and Repair, Water System, Main and Service Line |
Natalie Pifer
861np@ppi.us
7702678800

With GovernmentContracts, you can:
..., Construction 15538 Field Offices and Sheds, Construction Type 67053 Pipeline Equipment and ...
State Government of Georgia
Bid Due: 6/12/2026
...Construction, Industrial Pipeline Insulation, Including Maintenance, Repair and Installation 91340... Construction, Pipeline, Including ...
State Government of Georgia
Bid Due: 7/09/2026
...Pipeline Equipment and Tools, Construction and Laying of the Pipeline 91117 C.I.P., Construction... ...
State Government of Georgia
Bid Due: 6/11/2026
...Construction, Industrial Pipeline Insulation, Including Maintenance, Repair and Installation 91378... Agency Event Status: ...
State Government of Georgia
Bid Due: 6/18/2026