Addenda #1 - LUMBERTON LOOP: SCOTTISH PACKING STRUCTURAL ASSESSMENT AND ARCHITECTURAL SERVICES

Location: North Carolina
Posted: Feb 4, 2026
Due: Feb 6, 2026
Agency: Lumberton city
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
Solicitation No: RFQ#: COL-2026-SP-001
Publication URL: To access bid details, please log in.
Bid Number: RFQ#: COL-2026-SP-001
Bid Title: Addenda #1 - LUMBERTON LOOP: SCOTTISH PACKING STRUCTURAL ASSESSMENT AND ARCHITECTURAL SERVICES
Category: Public Works
Status: Open
Publication Date/Time:
2/2/2026 12:00 AM
Closing Date/Time:
Open Until Contracted
Related Documents:

Attachment Preview

City of Lumberton
RFQ#: COL-2026-SP-001
Addenda #1
Date of RFQ Issue: January 23, 2026
Date of Addenda #1 Issue: February 2, 2026
LUMBERTON LOOP: SCOTTISH PACKING STRUCTURAL
ASSESSMENT AND ARCHITECTURAL SERVICES
ADDENDA #1
The following questions were received prior to the close of the Questions period on January 30,
2026 at 1:00pm EST.
Question #1: Will an Opinion of Probable Cost be appropriate and can you clarify what
is meant by the term "itemized"?
Answer: Yes, an Opinion of Probable Cost (OPC) is appropriate. Itemization of the OPC
is desired to show, at minimum, estimated construction cost ranges for individual
components / facilities (e.g., bathrooms vs. shade structure vs. boardwalk, etc.) of the
proposed design. A single line item / lump sum OPC without specificity does not fully
capture the goals of the project relating to future grant-writing and fundraising efforts.
Question #2: Is there an existing survey based on previous work done on the site?
What information is represented on the survey?
Answer: Yes, surveys and engineering plans from previous work will be made available
to the selected consultant. In general, survey data represented in these maps include
the following:
Parcel Boundaries
Easements / Encroachments
Existing Topography (1contours)
Overhead Utilities
Existing Tree Canopy
Regulatory Flood Zones (floodway, 100-year floodplain, etc.)
Impervious Surfaces (roads, concrete pads, etc.)
Building Footprints
Fencing
Notes: (i) survey data for Impervious Surfaces, Building Footprints, and Fencing
was captured prior to the selective demolition of the buildings and structures on
the site, however, post-demolition aerial photography, field measurements, and
CAD drawings have been gathered and generated by the City and CDDL (as
illustrated in the RFQ Appendix) and will be made available to the selected
consultant; and (ii) the selected consultant may be responsible for generating
Page 1
City of Lumberton
RFQ#: COL-2026-SP-001
additional as-isinformation (e.g., wall elevations) necessary to complete the
requested Services in the RFQ.
Question #3: Is the design work from previous projects on the site, as noted in the RFQ,
available for review / use as base files?
Answer: Yes, this information will be made available to the selected consultant.
Question #4: Is the rendering presented in the Lumberton Community Flood Print:
Phase 2 document indicative of the level that is expected for the scope item "illustrative
graphic"?
Answer: Not necessarily. Illustrative graphic material to be produced under the
requested Services can be negotiated between the City and selected consultant during
the contracting phase.
Question #5: Some of the background information presented in the Lumberton
Community Flood Print: Phase 2 appears to align with the programming mentioned in
the RFQ. Can we assume that these are the aspirational goals of the project?
Answer: Programmatic desires for the site have remained largely consistent with the
goals and objectives outlined in the Lumberton Community Floodprint: Phase Two
document, however, the City understands that damages sustained to the remaining relic
of the original structure may compromise the feasibility and/or practicality of all original
aspirations.
Question #6: Has any environmental testing been done on the site (and ESA Phase 1)?
Will any documents be made available to the selected design team?
Answer: Yes, a Phase 1 ESA was previously completed and can be made available to
the selected consultant.
Page 2
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Date: Jun 11th 2026, 2:00 PM EDT Project Description: Charlotte Water is currently ...

City of Charlotte

Bid Due: 6/11/2026

...Date: Jun 11th 2026, 2:00 PM EDT Project Description: Charlotte Water is currently ...

City of Charlotte

Bid Due: 6/11/2026

...Testing/ Geotechnical Engineering - Building Envelope - Structural Engineering - Surveying App State.../Engineering ...

North Carolina State University

Bid Due: 7/30/2026

...Description: Pender County seeks qualifications from highly qualified engineering firms licensed... to practice ...

County of Pender

Bid Due: 6/25/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.