| Location: | North Carolina |
|---|---|
| Posted: | Feb 4, 2026 |
| Due: | Feb 24, 2026 |
| Agency: | North Carolina State University |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Institution | UNC Greensboro | |||||
|
Institution URL for Additional
Information about this Project (Optional) |
https://fac.uncg.edu/wp-content/uploads/20260121_Quad-Duct-Bank_Ad4Designer.pdf | |||||
| Project Name | Quad Duct Bank - Emergency Generator Connection | |||||
| Type of Services | Architectural/Engineering | |||||
| Project Manager | Bill Chatfield | |||||
| Phone Number | (404) 550-2060 | |||||
| Contact Email | wjchatfi@uncg.edu | |||||
| Closing Date | 02/24/2026 | |||||
| Project Budget |
|
|||||
| Project Description |
One-Two Sentences
The project scope is to install the duct bank life safety and optional standby power systems from the Weil/Winfield generator to the seven (7) residence halls in the Quad (Jamison, Coit, Bailey, Cotten, Hinshaw, Gray, Shaw). Scope of work includes disconnects, transfer switches, panels, etc. at the buildings. The generator was installed in 2019 and was sized to accommodate the additional load required. Designer is to provide the least intrusive practical design. Construction completion is to be scheduled no later than July 23, 2027.
|
|||||
|
Submit Letters of Interest
and Current SF-330 to: |
(Contact Person, Name of Institution & Address)
Letters of Interest must be submitted electronically in PDF format no later than 12:00 pm (Noon), February 24, 2026. Submit Letters of Interest to: Bill Chatfield UNC Greensboro Facilities Design & Construction fdc@uncg.edu
|

With GovernmentContracts, you can:
...an updated statement of work, submittal form, BLRI load limits, and updated bid ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/06/2026
...program already owns a Samsung front-load washer and dryer set, which is compatible ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 6/10/2026
...to a multipurpose room and support spaces. The existing structure is of load-bearing ...
State Government of North Carolina
Bid Due: 6/12/2026
...the design or layout for all or portions of the exit feeders' (circuit) ...
Town of Apex
Bid Due: 6/11/2026