NOBH - Snow Removal

Location: Ohio
Posted: Apr 9, 2025
Due: Apr 23, 2025
Agency: State Government of Ohio
Type of Government: State & Local
Category:
  • S - Utilities and Training Services
Solicitation No: SRC0000028917
Publication URL: To access bid details, please log in.
Solicitation ID: SRC0000028917
Solicitation Name: NOBH - Snow Removal
Original Begin Date: 3/19/2025 12:00:00 AM
Begin Date: 4/8/2025 4:00:53 PM
End Date: 4/23/2025 2:00:00 PM
Inquiry End Date: 4/21/2025 12:00:00 AM
Commodity: Snow removal services
MBE Set Aside: MBE Set Aside
Agency: DMH-OH Dept of MH & Addiction Svcs
Solicitation Status: Open for Bidding
Solicitation Type: Request For Proposal (RFP) (Double Envelope)

Solicitation General Information
In an MBE set-aside solicitation, only those bidders/suppliers with an active MBE certification at the time the solicitation closes can submit a response
Solicitation ID
SRC0000028917
Solicitation Name
NOBH - Snow Removal
RFx Type
Request For Proposal (RFP) (Double Envelope)
Lot #
1
Solicitation Status
Open for Bidding
Round #
2
MBE Set Aside
Begin Date
4/8/2025 4:00:53 PM (ET)
Amendment?
End Date
4/23/2025 2:00:00 PM (ET)
Inquiry End Date
4/21/2025 12:00:00 AM
Summary

Scope of Work
The contract stipulates that snow removal services will encompass the following areas:

•  Sidewalks, including courtyards and walkways along Arlington and Detroit Avenue
•  Parking lot, roadways, dock area, ramps, steps, and intake area
•  Application of ice protection measures across all designated areas

These bundled services will operate under an Event Fee-based Zero Tolerance Removal Plan, which requires a prompt response to any snowfall that results in an accumulation exceeding one inch as
reported by the Toledo Express Airport. In the event of an ice occurrence, the contractor shall implement both preventative and reactive measures to maintain a safe environment for staff and visitors, as outlined below:

•  A "Snow/Ice Event" is defined as a period of snowfall that leads to a significant accumulation
of snow or ice, provided there is a minimum 12-hour interval without additional snowfall or ice
before a new classification is assigned. Snow/Ice Events will be handled as part of a zero-
tolerance approach, with particular attention during shift changes, specifically at 7:00 AM, 3:00
PM, and 11:00 PM. Site conditions should be addressed at least half an hour prior to these shifts,
depending on the snowfall amount.
•  A cost estimate for "Salting Only" services during "Ice Only" events will be provided when
applicable. Ice events will also be managed under a zero-tolerance policy and may necessitate
pre-treatment.

Only Calcium Chloride or an equivalent product will be utilized for preventing icing on sidewalks and walkways. The contractor must ensure that the application of chemicals does not lead to
accumulation, including the removal of excess products from doorways to maintain safe conditions.

Any damage resulting from snow removal equipment will be remedied in the spring or as weather permits, but no later than April 30th. This includes, but is not limited to, sidewalks, curbs, lawns, and fences.

The contractor will provide a list of equipment designated for this service, and all equipment must be available and in operational condition at all times. The contractor will be responsible for repairing any site damage caused by snow removal services at the end of the season or immediately
following the incident, as directed by NOBH.

Regarding snow accumulation:
•  The contractor will ensure that all fire hydrants on NOBH property are accessible and clear from snow, allowing access from both parking lots and sidewalks.
•  Snow must not obstruct parking spaces, equipment, or building entrances.
•  Special attention will be required at the dock, Patient Intake area, and front entrances.
•  Unique conditions related to ongoing construction projects must be acknowledged throughout the term of this contract.
•  Snow blowers will be the sole equipment utilized on sidewalks that are less than five feet wide around the building to prevent damage, with the exception of the walks along South Detroit Avenue and Arlington Avenue.

Snow Clearing Requirements: Snow removal services must be conducted continuously, 24 hours per day, seven days a week, as necessary. The contractor is expected to regularly monitor the property
during snow events and/or ice storms. The contractor must sign in at the dispatch area whenever on-site for snow/ice control services. Services should commence within one hour of any request from
NOBH. Subcontracting of these services is not permitted without prior approval from the NOBH CEO, COO, and the Building Superintendent.

A site walk-through and review are required before the onset of the first snow each season and may be scheduled anytime after October 1st. Marking of curbs and roadways is highly recommended.

Process
Evaluation Process
OhioMHAS’s evaluation process of responses submitted to this request may consist of up to four distinct phases:
  1. 1. OhioMHAS’s initial review of all proposals for timely submission;
  2. 2. An evaluation committee review of the proposals for defects and scoring;
  3. 3. OhioMHAS’s request for more information (clarifications, interviews, presentations, and/or demonstrations);
  4. 4. Negotiations or best offer requests.
At its sole discretion, OhioMHAS will determine whether phases three and/or four are necessary under this RFP, reserving for itself the ability to eliminate or add phases three or four at any time during the evaluation process. OhioMHAS may add or remove sub- phases to phases 2 through 4 at any time if MHAS believes doing so will improve the evaluation process.

Proposal Evaluation Criteria
In the proposal evaluation phase, OhioMHAS staff or reviewers selected by OhioMHAS (the committee) will rate the proposals submitted in response to this RFP based on the following criteria and weight assigned to each criterion.
Evaluation Criteria Weight Rating Extended Score
References & Current Experience with job duties and working with described in RFP. 25
Cost Proposal 25
Meets Exhibit One (1) Requirements (i.e., Equipment, Certifications, Licensure, Staffing Skill Set, etc.) 50
Total: /500

Ship To
Contracting Entity
DMH-OH Dept of MH & Addiction Svcs
1 Record(s)
0 Record(s)
Solicitation Documents
Keywords
Search Reset
Title Type Att. Validity End Date Validity End Date
NOBH - Snow Removal Public Solicitation Documents (Approved)
1 Record(s)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS NAICS ...

DEPT OF DEFENSE

Bid Due: 6/08/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.