| Location: | Washington |
|---|---|
| Posted: | Apr 21, 2026 |
| Agency: | County of Clark |
| Type of Contract: | Awards |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project consists of the removal of the existing 34’L x 33”H wooden retaining wall. Removal and replacement of 42’ of concrete sidewalk,
pruning the roots of the adjoining sequoia tree back
to allow space for the new retaining wall, and construction of the new concrete retaining wall.
Addendum 1 - Issued Monday, April 6, 2026
A non-mandatory meeting is scheduled for 1:00 pm on Wednesday, April 1, 2026. Attendees shall meet onsite in the parking lot of Heritage Farm located at 1919 NE 78th Street, Vancouver WA 98665.

With GovernmentContracts, you can:
...South Concourse Evolution (SCE), Bid Package 2.1.01 - Building Concrete - New Status ...
Port of Seattle
Bid Due: 10/15/2026
...class 4 - asphalt concrete paving. Public Works Publication Date September 04, 2026 ...
State Government of Washington
Bid Due: 10/07/2026
...concrete gravity sewer main and eleven 48-inch diameter concrete manholes. the Contractor shall ...
City of Vancouver
Bid Due: 9/22/2026
...miles of roads, and approximately 75 miles of constructed sidewalk. Sidewalks are primarily ...
City of Poulsbo
Bid Due: 10/06/2026