| Location: | Washington |
|---|---|
| Posted: | Apr 21, 2026 |
| Agency: | County of Clark |
| Type of Contract: | Awards |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project consists of the removal of the existing 34’L x 33”H wooden retaining wall. Removal and replacement of 42’ of concrete sidewalk,
pruning the roots of the adjoining sequoia tree back
to allow space for the new retaining wall, and construction of the new concrete retaining wall.
Addendum 1 - Issued Monday, April 6, 2026
A non-mandatory meeting is scheduled for 1:00 pm on Wednesday, April 1, 2026. Attendees shall meet onsite in the parking lot of Heritage Farm located at 1919 NE 78th Street, Vancouver WA 98665.

With GovernmentContracts, you can:
...Bid Title: RFB Earthen wall construction and hillside slide remediation Category: Tribal... for ...
Quinault Indian Nation
Bid Due: 10/08/2026
..., 2027 Initiative: None Classification Original Set Aside: Product Service Code: Y1LZ - ...
DEPT OF DEFENSE
Bid Due: 10/15/2026
...Concrete Coring 150-07-Boxes, Shoring (For Construction Worker Protection) 959-26-Breakwater Construction... Construction 909-11-Airport Facility ...
State Government of Washington
Bid Due: 11/20/2026
...Solicitation Information Title Portable Construction Equipment and Accessories Attachments- SW... Portable Construction Equipment ...
State Government of Washington
Bid Due: 10/08/2026