| Location: | Washington |
|---|---|
| Posted: | Apr 21, 2026 |
| Agency: | County of Clark |
| Type of Contract: | Awards |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project consists of the removal of the existing 34’L x 33”H wooden retaining wall. Removal and replacement of 42’ of concrete sidewalk,
pruning the roots of the adjoining sequoia tree back
to allow space for the new retaining wall, and construction of the new concrete retaining wall.
Addendum 1 - Issued Monday, April 6, 2026
A non-mandatory meeting is scheduled for 1:00 pm on Wednesday, April 1, 2026. Attendees shall meet onsite in the parking lot of Heritage Farm located at 1919 NE 78th Street, Vancouver WA 98665.

With GovernmentContracts, you can:
...RFP | Inchelium Sidewalk Replacement | Closing Date Aug 5, 2026 PDF Confederated ...
The Confederated Tribes of the Colville Reservation
Bid Due: 8/05/2026
...Bid Number: 26013 Bid Title: Davies Beach Decking Replacement Category: Construction Projects... Status: ...
City of Lake Stevens
Bid Due: 7/30/2026
...Contract Columbia River Bridge Replacement Contract summary The Columbia River Bridge Replacement... Scotty ...
State Government of Washington
Bid Due: 9/30/2026
...Contract Columbia River Bridge Replacement Contract summary The Columbia River Bridge Replacement...
State Government of Washington
Bid Due: 8/19/2026