| Project Title: | Technology Infrastructure Replacement Project SCO#28434 |
| Description: | The Project consists of two integrated work elements: Campus Conduit Infrastructure: Design of a diverse underground conduit pathway system providing a minimum of 2 separate and independent connectivity paths to each building on the Carrington-Scott Campus at 1247 Jimmie Kerr Road, Graham, NC, linking all campus buildings to a central distribution point(s). Work includes, but is not limited to, directional boring, trenching, conduit installation, pull boxes, handholes, and restoration of all disturbed surfaces. Fiber Optic Network: Design of a redundant 24-strand single-mode fiber optic (SMF) network operating over the newly installed conduit system, with all strands terminated, tested and connected to both of the College’s on-campus data centers (Located in T Bldg and Main Bldg). The network architecture shall provide fully redundant pathways to eliminate single points of failure. |
| Opening Date: | 6/2/2026 3:00 PM |
| Posted Date: | 5/14/2026 |
| Status: | Open |
| Department: | ALAMANCE COMMUNITY COLLEGE |
|
Solicitation Number
*
75-06022026
|
Department
ALAMANCE COMMUNITY COLLEGE
|
Status Reason
Open
|
|
|
Opening Date
2026-06-02T15:00:00.0000000
|
Posted Date
*
2026-05-14T14:16:18.0000000Z
|
Primary Commodity Code
Design Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
Solicitation Type
*
Select RFP IFB RFI
|
|
|
Owner
Thomas Hartman
|
|||
|
Description
The Project consists of two integrated work elements: Campus Conduit Infrastructure: Design of a diverse underground conduit pathway system providing a minimum of 2 separate and independent connectivity paths to each building on the Carrington-Scott Campus at 1247 Jimmie Kerr Road, Graham, NC, linking all campus buildings to a central distribution point(s). Work includes, but is not limited to, directional boring, trenching, conduit installation, pull boxes, handholes, and restoration of all disturbed surfaces. Fiber Optic Network: Design of a redundant 24-strand single-mode fiber optic (SMF) network operating over the newly installed conduit system, with all strands terminated, tested and connected to both of the College’s on-campus data centers (Located in T Bldg and Main Bldg). The network architecture shall provide fully redundant pathways to eliminate single points of failure.
|
|||

With GovernmentContracts, you can:
...:00 pm Thursday May 28, 2026 at UNC Pembroke, Facilities Planning, Design & ...
North Carolina State University
Bid Due: 6/04/2026
...IP cameras, NVR's, network switches and cabling, etc. for a complete on-premise surveillance... ...
State Government of North Carolina
Bid Due: 6/08/2026
...project is $255,000, encompassing all aspects of the project from design through installation. ...
City of Durham
Bid Due: 6/18/2026
...County, along with several smaller wastewater conveyance networks in the central and northern ...