| Project Title: | Technology Infrastructure Replacement Project SCO#28434 |
| Description: | The Project consists of two integrated work elements: Campus Conduit Infrastructure: Design of a diverse underground conduit pathway system providing a minimum of 2 separate and independent connectivity paths to each building on the Carrington-Scott Campus at 1247 Jimmie Kerr Road, Graham, NC, linking all campus buildings to a central distribution point(s). Work includes, but is not limited to, directional boring, trenching, conduit installation, pull boxes, handholes, and restoration of all disturbed surfaces. Fiber Optic Network: Design of a redundant 24-strand single-mode fiber optic (SMF) network operating over the newly installed conduit system, with all strands terminated, tested and connected to both of the College’s on-campus data centers (Located in T Bldg and Main Bldg). The network architecture shall provide fully redundant pathways to eliminate single points of failure. |
| Opening Date: | 6/2/2026 3:00 PM |
| Posted Date: | 5/14/2026 |
| Status: | Open |
| Department: | ALAMANCE COMMUNITY COLLEGE |
|
Solicitation Number
*
75-06022026
|
Department
ALAMANCE COMMUNITY COLLEGE
|
Status Reason
Open
|
|
|
Opening Date
2026-06-02T15:00:00.0000000
|
Posted Date
*
2026-05-14T14:16:18.0000000Z
|
Primary Commodity Code
Design Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
Solicitation Type
*
Select RFP IFB RFI
|
|
|
Owner
Thomas Hartman
|
|||
|
Description
The Project consists of two integrated work elements: Campus Conduit Infrastructure: Design of a diverse underground conduit pathway system providing a minimum of 2 separate and independent connectivity paths to each building on the Carrington-Scott Campus at 1247 Jimmie Kerr Road, Graham, NC, linking all campus buildings to a central distribution point(s). Work includes, but is not limited to, directional boring, trenching, conduit installation, pull boxes, handholes, and restoration of all disturbed surfaces. Fiber Optic Network: Design of a redundant 24-strand single-mode fiber optic (SMF) network operating over the newly installed conduit system, with all strands terminated, tested and connected to both of the College’s on-campus data centers (Located in T Bldg and Main Bldg). The network architecture shall provide fully redundant pathways to eliminate single points of failure.
|
|||

With GovernmentContracts, you can:
...aboveground steel piping necessary to remove existing ASTs (including any piping in existing ...
Brunswick County
Bid Due: 6/23/2026
...underground electric utility infrastructure improvements. Bid Package RFB EL 9608 2026-01 Event Date...
City of New Bern
Bid Due: 6/08/2026