| Location: | South Carolina |
|---|---|
| Posted: | Oct 27, 2025 |
| Due: | Nov 4, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | H59-N302-CB |
| Publication URL: | To access bid details, please log in. |
Construction of a 3,500 sq ft addition to HGTC's Automotive Technology Building located on our Conway campus. Addition would be a block building with 3 or 4 bays. Facade would be block on 3 sides and brick along the front to match existing building. Mechanical, electrical, plumbing will be required.

With GovernmentContracts, you can:
...: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Jamie Caggiano Email... Conference ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/30/2026
...Documents May Be Obtained From: Mechanical Design In- Justin Varco Project Details: n/a ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/20/2026
..., Ruffin, SC 29475 Project Delivery Method: Design-Bid-Build Construction Cost Range: $135,000-$160,000... that ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/14/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: $475,000 to $575,000 Prime Contractor... to fully ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/19/2026