City of Dardenne Prairie, Weldon Spring Road from Technology Drive to Henning Road, Dardenne Prairie, Missouri, Weldon Spring Road (Phase 1) Improvements

Location: Missouri
Posted: Mar 25, 2026
Due: Apr 15, 2026
Agency: Missouri Department of Transportation(MDOT)
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
New Posting Posting Date Project Number Solicitation LPA Contact LPA Phone LPA Email Due Date
NEW 3/25/26 STBG-5407(623) City of Dardenne Prairie, Weldon Spring Road from Technology Drive to Henning Road, Dardenne Prairie, Missouri, Weldon Spring Road (Phase 1) Improvements Matthew W. Davidson 636-
755-5320
cityengineer@dardenneprairie.org 4/15/26

Attachment Preview

Weldon Spring Road (Phase 1) Improvements
Project
Weldon Spring Road from Technology Drive to Henning Road, Dardenne Prairie, Missouri
Location
Federal STP-S funds with local / county match
Funding
Qualifications-based selection for professional engineering design services
Procurement Type
Preliminary engineering and related professional services through final PS&E; construction engineering / inspection excluded
Services Solicited
Electronic PDF submittal to Bids@dardenneprairie.org
Submission Method
Matthew Davidson, City Engineer | cityengineer@dardenneprairie.org | 636- 755-5320
City Contact
0%
DBE Goal

City of Dardenne Prairie, Missouri - RFQ - Weldon Spring Road (Phase 1)
CITY OF DARDENNE PRAIRIE, MISSOURI
Request for Qualifications
Professional Engineering Services
Weldon Spring Road (Phase 1)
MoDOT LPA Consultant Procurement | Federally Funded STBG-5407(623)
Project Weldon Spring Road (Phase 1) Improvements
Weldon Spring Road from Technology Drive to Henning Road, Dardenne
Location
Prairie, Missouri
Funding Federal STP-S funds with local / county match
Procurement Type Qualifications-based selection for professional engineering design services
Preliminary engineering and related professional services through final PS&E;
Services Solicited
construction engineering / inspection excluded
Submission Method Electronic PDF submittal to Bids@dardenneprairie.org
Matthew Davidson, City Engineer | cityengineer@dardenneprairie.org | 636-
City Contact
755-5320
DBE Goal 0%
Issued by the City of Dardenne Prairie for consultant selection in accordance with MoDOT LPA requirements,
the Brooks Act, 23 CFR 172, and applicable Missouri law.
Page 1

City of Dardenne Prairie, Missouri - RFQ - Weldon Spring Road (Phase 1)
1. Procurement Basis and Invitation
This solicitation is intended to comply with MoDOT Engineering Policy Guide Section 136.4, the Brooks Act
qualifications-based selection requirements, 23 CFR 172, and applicable Missouri law for procurement of
professional engineering services. Cost information shall not be included in the Statement of Qualifications
unless and until the City initiates negotiations with the highest ranked firm.
The City of Dardenne Prairie, Missouri, invites qualified engineering consulting firms to submit Statements of
Qualifications for the Weldon Spring Road (Phase 1) Improvements project. The City intends to select the firm
whose qualifications, experience, technical understanding, capacity, and past performance are most
advantageous for successful delivery of the project in accordance with federal-aid requirements.
This solicitation is publicly advertised in accordance with MoDOT LPA requirements to ensure full and open
competition.
2. Project Background and Need
Weldon Spring Road (Phase 1) extends generally from Technology Drive to Henning Road and serves
residential neighborhoods, school traffic associated with John Weldon Elementary School, nearby churches
and businesses, and connections to the local and regional bicycle and trail network.
The corridor is generally a two-lane roadway with constrained drainage collection, limited curb and gutter,
aging pavement, and pedestrian facilities that do not adequately support current multimodal demand. The
City's grant application identifies safety concerns, school access and circulation issues, drainage
deficiencies, limited illumination, and the need for safer pedestrian and bicycle connectivity along the
corridor.
The selected consultant will be expected to refine the project concept and advance the work in a manner
consistent with applicable City, County, MoDOT, FHWA, ADA / PROWAG, MUTCD, and AASHTO requirements.
3. Anticipated Project Improvements
* Pavement rehabilitation, resurfacing, and associated roadway reconstruction where required.
* Realignment and safety improvement of the Weldon Spring Road / Technology Drive intersection.
* Addition of curb and gutter, storm sewer improvements, inlets, grading adjustments, and related drainage
work.
* Widening and striping improvements, including a center turn lane or other safety-related lane
configuration in the school frontage area as appropriate.
* Construction of a 10-foot shared-use path and related sidewalk transitions, ADA curb ramps, and
pedestrian connections.
* Enhanced crossing treatments, including high-visibility crosswalks, raised crossings where appropriate,
RRFBs, signing, pavement markings, and channelization features if warranted.
* Street lighting, pedestrian/path lighting, and related electrical components, including solar-powered
devices if incorporated into the final design.
* Driveway aprons, restoration, traffic control, and other appurtenant work necessary for a complete and
buildable project.
* Right-of-way and easement support, utility coordination, and utility relocation planning / coordination as
required.
Page 2

City of Dardenne Prairie, Missouri - RFQ - Weldon Spring Road (Phase 1)
4. Scope of Professional Services
The selected consultant shall furnish all professional engineering, planning, surveying, environmental, right-
of-way support, and related services necessary to advance the project from notice to proceed through final
plans, specifications, and estimate in a manner acceptable to the City, MoDOT, and applicable federal
requirements. The City reserves the right to refine the final scope during contract negotiations.
4.1 Project Management and Coordination
* Project management, quality management, schedule control, monthly progress reporting, and overall
administration of the consultant team.
* Coordination with the City, MoDOT, St. Charles County, utility companies, school representatives,
adjoining property owners, and other stakeholders.
* Attendance at progress meetings, public meetings, review meetings, and presentations as requested.
* Preparation and maintenance of a project management plan, action item log, and deliverable schedule.
4.2 Surveying and Base Mapping
* Topographic survey, control, supplemental field investigation, visible utility mapping, and development of
base mapping as needed for roadway, path, drainage, and right-of-way design.
* Right-of-way research support, easement exhibit preparation, legal descriptions, and title / survey
coordination to the extent allowed within professional services procurement and funding eligibility.
* Collection and depiction of existing features necessary for design, permitting, and utility coordination.
4.3 Traffic, Safety, and Multimodal Design
* Concept refinement, geometric layout, typical sections, shared-use path and ADA design, school-area
access and crossing treatments, signing and pavement marking concepts, and maintenance of traffic
concepts.
* Evaluation of traffic control, school-related circulation, lighting needs, and intersection geometry to
improve safety without creating unacceptable operational impacts.
* Preparation of preliminary plans, design exceptions / justifications if required, and incremental review
submittals.
4.4 Drainage, Stormwater, and Utility Coordination
* Hydrologic and hydraulic analyses, drainage design, curb and inlet improvements, and identification of
outfall or drainage structure needs.
* Utility conflict identification, utility coordination meetings, relocation tracking, utility conflict matrices,
and utility certification support.
* Preparation of relocation exhibits, utility adjustment recommendations, and incorporation of utility needs
into plan development.
4.5 Environmental Documentation and Permitting
* NEPA classification support and environmental documentation, if required.
* Coordination of cultural resources, threatened and endangered species review, floodplain issues,
stormwater permitting, agency coordination, and permit support as required by the project and funding
source.
* Preparation of environmental commitments documentation and incorporation of commitments into plans
and specifications as applicable.
Page 3

City of Dardenne Prairie, Missouri - RFQ - Weldon Spring Road (Phase 1)
4.6 Right-of-Way Support
* Identification of right-of-way and easement needs and preparation of right-of-way plans, parcel exhibits,
legal descriptions, and acquisition support documents.
* Coordination with the City and MoDOT regarding Uniform Act compliance, acquisition sequencing, and
authorization constraints.
* This RFQ does not seek brokerage or negotiator services as a qualifications-based professional service
unless specifically authorized and procured in a compliant manner.
4.7 Public Involvement and Agency Coordination
* Support for stakeholder outreach, public meetings or hearings if required, meeting exhibits, response
summaries, and agency coordination materials.
* Coordination with affected property owners, school representatives, nearby institutions, and utility
providers to support constructability and access planning.
4.8 Final Design, PS&E, and Bidding Support
* Preparation of final plans, specifications, estimates, quantity calculations, special provisions, and other
PS&E elements suitable for MoDOT review, authorization, and bidding.
* Assistance during advertisement, responses to bidder questions, preparation of addenda, and support for
award recommendation documentation and clarifications requested by MoDOT or other reviewing
agencies.
4.9 Scope Exclusions / Optional Post-Award Services
* Construction engineering, construction inspection, materials testing, and resident engineering services
are not included in this solicitation.
* Limited post-award design clarifications or shop drawing review may be added only if authorized by the
City and permitted by the funding program.
5. Federal-Aid, DBE, and Nondiscrimination Requirements
This procurement is qualifications-based. No fee proposal, pricing schedule, labor rates, overhead schedule,
or cost proposal shall be submitted with the Statement of Qualifications.
The selected consultant must be qualified and eligible to perform the work and must satisfy applicable
MoDOT and federal requirements for engineering services contracts.
The DBE goal for this project is 0%. Only DBE firms listed in the Missouri Regional Certification Committee
(MRCC) directory will be recognized toward the assigned DBE goal. The awarded consultant shall document
compliance or good faith efforts in the manner required by MoDOT and the engineering services contract.
The City of Dardenne Prairie, in accordance with Title VI of the Civil Rights Act of 1964, the Americans with
Disabilities Act, and other applicable nondiscrimination authorities, ensures that no person shall be excluded
from participation in, denied the benefits of, or otherwise subjected to discrimination under this solicitation or
the resulting contract on the basis of race, color, national origin, sex, age, disability, or other protected status.
The consultant and subconsultants must comply with nondiscrimination, Title VI, ADA, E-Verify, debarment /
suspension, records retention, lobbying restrictions, conflict of interest disclosure, and all other applicable
federal, state, and local contract requirements.
Page 4

Tab Required Content Expected Information
A Cover Letter and Project Understanding Identify the prime consultant, office location responsible for the work, authorized contact, and concise understanding of the project purpose, constraints, and delivery approach.
B Firm Background and Qualifications Describe the firm, Missouri registrations, federal-aid experience, MoDOT / LPA experience, and qualifications relevant to multimodal roadway, drainage, lighting, school access, utility, and right-of-way support work.
C Project Team and Key Personnel Provide organization chart, office location of key staff, resumes, proposed roles, availability, and discipline leads. Clearly identify subconsultants.
D Relevant Project Experience Provide up to five representative projects for the prime consultant and up to three representative projects for each major subconsultant. At least two examples should involve MoDOT LPA projects or comparable federally funded local agency work.
E Project Approach and Delivery Strategy Describe approach to survey, design development, environmental review if required, utility coordination, right-of-way support, schedule control, QA /

City of Dardenne Prairie, Missouri - RFQ - Weldon Spring Road (Phase 1)
6. Statement of Qualifications Requirements
Submit one searchable electronic PDF containing the firm's Statement of Qualifications. The City requests a
concise, project-focused SOQ with a principal narrative not to exceed 10 pages, excluding cover letter, table
of contents, divider sheets, resumes, MoDOT prequalification documentation, and required certifications or
acknowledgements.
To be considered responsive, each submittal should be organized in the sequence below. Clear, concise,
project-focused submittals are preferred.
Tab Required Content Expected Information
Identify the prime consultant,
office location responsible for the
Cover Letter and Project work, authorized contact, and
A
Understanding concise understanding of the
project purpose, constraints, and
delivery approach.
Describe the firm, Missouri
registrations, federal-aid
experience, MoDOT / LPA
Firm Background and experience, and qualifications
B
Qualifications relevant to multimodal roadway,
drainage, lighting, school access,
utility, and right-of-way support
work.
Provide organization chart, office
location of key staff, resumes,
C Project Team and Key Personnel proposed roles, availability, and
discipline leads. Clearly identify
subconsultants.
Provide up to five representative
projects for the prime consultant
and up to three representative
projects for each major
D Relevant Project Experience subconsultant. At least two
examples should involve MoDOT
LPA projects or comparable
federally funded local agency
work.
Describe approach to survey,
design development,
Project Approach and Delivery
E environmental review if required,
Strategy
utility coordination, right-of-way
support, schedule control, QA /
Page 5

QC, stakeholder coordination, and MoDOT review management.
F Capacity and Workload Demonstrate that the team has sufficient current capacity and management attention to deliver this project on the anticipated schedule.
G Past Performance and References Provide at least three client references for comparable projects, including owner contact information, completion status, and brief description of services provided.
H Required Certifications / Disclosures Include acknowledgement of addenda, actual or potential conflicts of interest, MoDOT prequalification categories, debarment / suspension eligibility, and a statement that no fee proposal is included with the SOQ.
No. Selection Criterion Points
1 Relevant experience with comparable federally funded roadway / multimodal projects 25
2 Project team qualifications, key personnel, and organizational strength 20
3 Project understanding, technical approach, and quality management procedures 20
4 Past performance, references, and record of successful delivery 15

City of Dardenne Prairie, Missouri - RFQ - Weldon Spring Road (Phase 1)
QC, stakeholder coordination,
and MoDOT review management.
Demonstrate that the team has
sufficient current capacity and
F Capacity and Workload management attention to deliver
this project on the anticipated
schedule.
Provide at least three client
references for comparable
projects, including owner contact
G Past Performance and References
information, completion status,
and brief description of services
provided.
Include acknowledgement of
addenda, actual or potential
conflicts of interest, MoDOT
Required Certifications / prequalification categories,
H
Disclosures debarment / suspension
eligibility, and a statement that no
fee proposal is included with the
SOQ.
7. Evaluation Criteria and Selection Process
Submittals will be evaluated by a selection committee using qualifications-based criteria. Interviews are not
anticipated but may be conducted at the City's sole discretion if the City determines that interviews would
materially improve the evaluation process.
No. Selection Criterion Points
Relevant experience with
1 comparable federally funded 25
roadway / multimodal projects
Project team qualifications, key
2 personnel, and organizational 20
strength
Project understanding, technical
3 approach, and quality 20
management procedures
Past performance, references,
4 15
and record of successful delivery
Page 6

5 Capacity to perform the work within the required timeframe 10
6 MoDOT / LPA process familiarity, including utility, ROW, environmental, and PS&E coordination 10
Milestone Date / Time
RFQ issue date March 25, 2026
Deadline for written questions April 3, 2026 by 5:00 PM CT
Responses / addenda issued April 7, 2026
Statements of Qualifications due April 15, 2026 by 2:00 PM CT
Anticipated contract approval / authorization May 6, 2026

City of Dardenne Prairie, Missouri - RFQ - Weldon Spring Road (Phase 1)
Capacity to perform the work
5 10
within the required timeframe
MoDOT / LPA process familiarity,
including utility, ROW,
6 10
environmental, and PS&E
coordination
Selection Process
* The City will review responsive Statements of Qualifications and score firms using the published criteria
and weighted point values in this RFQ.
* The City intends to rank firms in order of qualifications. In accordance with qualifications-based selection
requirements, the City will then enter into scope and fee negotiations with the highest ranked firm.
* If the City cannot negotiate a fair and reasonable contract with the highest ranked firm, the City may
formally terminate negotiations and proceed to the next most qualified firm.
* Any contract award shall remain subject to applicable City approvals and any MoDOT concurrence or
processing required for the federally funded project.
8. Anticipated Deliverables
* Project management plan and detailed schedule.
* Survey / base mapping and field investigation documentation.
* Preliminary engineering exhibits, concepts, and technical memoranda as needed to support City
decisions.
* Environmental documentation and permit support materials, if required.
* Right-of-way plans, parcel exhibits, legal descriptions, and acquisition support documents, if required.
* Utility coordination documentation, conflict matrices, and certification support.
* Final PS&E package suitable for review, authorization, advertisement, and bidding.
* Engineer's estimates at major milestones.
* Meeting materials, public involvement exhibits, and review comment responses.
Anticipated Procurement Schedule
The schedule below is a planning aid only. The City reserves the right to revise milestones by addendum or
internal action.
Milestone Date / Time
RFQ issue date March 25, 2026
Deadline for written questions April 3, 2026 by 5:00 PM CT
Responses / addenda issued April 7, 2026
Statements of Qualifications due April 15, 2026 by 2:00 PM CT
Anticipated contract approval / authorization May 6, 2026
Page 7

March 25, 2026
RFQ Issue Date
April 15, 2026
SOQ Due Date
Matthew W. Davidson, City Engineer
Authorized City Representative
Signature / Date

City of Dardenne Prairie, Missouri - RFQ - Weldon Spring Road (Phase 1)
9. Questions, Submission Instructions, and General Conditions
Questions regarding this RFQ shall be directed in writing to Matthew Davidson, City Engineer, at
cityengineer@dardenneprairie.org. Responses and any addenda may be issued by the City in writing. Oral
interpretations shall not be binding.
Statements of Qualifications shall be transmitted electronically to Bids@dardenneprairie.org by the deadline
stated in this RFQ or in any addendum. The subject line should clearly identify the solicitation as: "SOQ -
Weldon Spring Road (Phase 1) Engineering Services." Late submittals may be rejected. The City recommends
a single bookmarked PDF file when practical.
* Issuance of this RFQ does not obligate the City to award a contract or to reimburse any respondent for
costs incurred in preparation of a response.
* The City reserves the right to reject any or all submittals, waive minor informalities, request clarification or
supplemental information, cancel or reissue the RFQ, and negotiate with the next most qualified firm if
negotiations with the top-ranked firm are unsuccessful.
* The selected consultant shall comply with all applicable federal, state, and local laws, regulations,
executive orders, and contract requirements.
* The City expects the consultant to disclose any actual or potential conflicts of interest. Firms with
unresolved conflicts may be deemed ineligible for award.
* Consultants and subconsultants must not be suspended or debarred from participation in federally
assisted contracts.
* The final scope, contract form, fee basis, and insurance requirements shall be established during
negotiations and shall remain subject to City and MoDOT requirements.
10. Anticipated Insurance and Contractual Requirements
The consultant selected for negotiations should be prepared to meet customary municipal and federally
assisted professional services contract requirements, including professional liability insurance, commercial
general liability, automobile liability, workers compensation, and other coverages required by the City's final
contract documents. Final insurance limits and contractual terms will be confirmed during negotiations and
may incorporate City standard contract provisions and MoDOT requirements.
11. Issuance
Issued by authority of the City of Dardenne Prairie, Missouri. Insert final issuance date, due date, and
authorized signature information prior to advertisement.
RFQ Issue Date March 25, 2026
SOQ Due Date April 15, 2026
Authorized City Representative Matthew W. Davidson, City Engineer
Signature / Date
Page 8

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow 657-26-602 Create Observation Unit JC Active Contract Opportunity Notice ID 36C25526R0162 Related

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 8/25/2026

Bid Number: 81426 Bid Title: August 2025 Residential Demolition Category: Planning, Community Development

City of Joplin

Bid Due: 8/14/2026

Utility Locate Services FY27 Department: Public Works Category: Software & Information Systems, Construction

City of Clayton

Bid Due: 8/20/2026

Basic Information Negotiation MODOT 0000000243SL,1 Title MoDOT Statewide - Lease Tractors Negotiation Type

State Government of Missouri

Bid Due: 8/17/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.