22nd Street and Hart Road Waterline and Sewer Rehab Projects

Location: Oregon
Posted: Jan 12, 2026
Due: Jan 20, 2026
Agency: City of Beaverton
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.


Project ID:

Title: 22nd Street and Hart Road Waterline and Sewer Rehab Projects

Addenda: 3

Release Date: 12/12/2025

Due Date: 1/20/2026

Follow
22nd Street and Hart Road Waterline and Sewer Rehab Projects
Last updated by Addendum #3 on Jan 13, 2026 7:49 AM See what changed
Invitation to Bid
Public Works - Engineering
59500 , 79000 , 81500 , 82000 , 88500 ... show all
Project ID: 26-020
Release Date: Friday, December 12, 2025
· Due Date: Tuesday, January 20, 2026 2:00pm
Posted Friday, December 12, 2025 9:00am
All dates & times in Pacific Time
Draft Response Events RSVP No Bid7 days, 19 hours, 56 minutes


Post Information

Posted At:Fri, Dec 12, 2025 9:00 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

Project Overview
This project includes two distinct Capital Improvement Projects (CIPs) combined into a single large-scale bid package, each with its own construction schedule and dedicated plan sets. Although construction for each schedule will occur separately (non-simultaneously), both will utilize a shared Special Provisions Specifications Book.

Schedule A – CIP 4136: SW 22nd Street (Whistling Ct to Hall Blvd) & Glenn Drive Public Water and Sewer Improvements
This project involves the installation of approximately 4,000 linear feet of zinc-coated ductile iron potable water pipe (wrapped in polyethylene), in sizes of 8”, 6”, and 4”. Thirteen waterline connection details are included in the scope, with potholing required as part of the bid for select areas of the alignment. Additionally, the project includes the replacement of two existing sewer cleanouts with new manhole structures.

Located along a residential, high-traffic corridor, this project will require a comprehensive traffic control plan. Construction activities in certain areas will necessitate the use of flagging operations.

Schedule B – CIP 4211: SW Hart Road Traffic Circle Public Waterline Improvements
This portion of the project includes the installation of approximately 1,800 linear feet of zinc-coated ductile iron potable water pipe (poly wrapped), with pipe diameters of 12”, 8”, 6”, and 4”. The scope includes four waterline connection details. Pothole investigations have already been completed for the entire alignment.

Similar to Scheule A, this project is located on a heavily traveled residential street and will require a robust traffic control plan, including flagging operations, to ensure public and worker safety during construction.



Timeline

ITB Released on:
December 12, 2025
Pre-Bid Conference (Non-Mandatory):
Last Day to Submit Questions:
January 8, 2026, 5:00pm
Bid Due By:
January 20, 2026, 2:00pm
Council Award Date:
February 17, 2026
Estimated Notice to Proceed Date:
March 16, 2026
Estimated Substantial Completion Date:
September 4, 2026
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.