| Location: | Texas |
|---|---|
| Posted: | Sep 17, 2026 |
| Due: | Oct 1, 2026 |
| Agency: | Rio Grande City |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
RFP #: 2026-14
Request for Proposals
Broadband Construction Services
Proposal Submission Deadline:
October 1, 2026 at 11:00 AM
Request for Proposals (RFP)
Broadband Construction Services
September 16, 2026
Re: 2026 Library Infrastructure Facility Improvement Grant Program with the Texas State
Library and Archives Commission
Dear Service Providers:
Attached is a copy of the City of Rio Grande City Request for Proposals ("RFP") for Broadband
Construction Services for improvements serving the Rio Grande City Public Library.
The City of Rio Grande City ("City") was awarded a grant through the 2026 Library Infrastructure
Facility Improvement ("LIFI") Grant Program funded by the Texas State Library and Archives
Commission ("TSLAC") to support improvements to the Rio Grande City Public Library's
broadband, internet, and network infrastructure.
The proposed Project is intended to replace outdated internet and network infrastructure, extend
high-speed fiber-optic connectivity to the Library, expand modern digital learning capacity, and
provide dedicated infrastructure supporting community telehealth access.
As part of the Project, the City anticipates installation of a new underground high-speed
fiber-optic connection and related broadband and network infrastructure.
The City has separately retained a professional engineering firm to provide engineering, design,
and limited construction-phase oversight services for the Project, including preparation of
construction oversight reports, review of contractor production reporting, review and response to
requests for information and clarification, review of proposed change orders and
recommendations to the City, construction observations as provided under the City's separate
agreement with the engineer, and review and processing of contractor redlines and closeout
reports for development of as-built drawings. For purposes of this RFP, that firm shall be
referred to as the "City's Designated Engineer."
The City's Designated Engineer is responsible for preparing, developing, reviewing, and/or
approving, as applicable, the engineering plans, drawings, technical specifications, route,
quantities, construction requirements, and other technical documents for the Project.
2
Design Status
As of the date of this RFP, the City's Designated Engineer has completed a preliminary,
high-level design ("HLD") sufficient to produce a Rough Order of Magnitude ("ROM") cost
estimate and a set of key design assumptions for the Project. Final engineering plans,
specifications, and quantities have not yet been completed. The ROM estimate and design
assumptions are provided in Section 16 (Proposed Cost) for Respondents' reference, and final
plans will be issued by the City as one or more addenda in accordance with Section 26
(Engineering Plans and Technical Documents).
The contractor selected through this RFP ("Contractor") shall be responsible for OTDR testing in
accordance with the Contract Documents issued by the City.
The Contractor may perform the Work using its own personnel and, where appropriate, qualified
subcontractors retained by the Contractor. The Contractor shall remain fully responsible to the
City for all Work performed under the Contract.
The Project is subject to an expedited grant schedule. Grant funds must be encumbered no
later than November 1, 2026, and construction must be completed no later than December 21,
2026.
Respondents must therefore demonstrate sufficient personnel, equipment, materials,
subcontractor resources, technical capabilities, and availability to mobilize promptly and
complete the Project within the required timeframe.
The submission requirements for proposals are included in this RFP. Please submit proposals
to:
City of Rio Grande City - City Secretary's Office
Attn: Lynette Montemayor
5332 E. US Highway 83
Rio Grande City, Texas 78582
The deadline for submission of proposals is:
Thursday, October 1, 2026 at 11:00 AM
Mark: "RFP #: 2026-14 - Broadband Construction Services for the 2026 LIFI Grant" on the
outside of the mailing envelope/package.
It is the responsibility of the submitting entity to ensure that its proposal is received in a timely
manner. Proposals received after the deadline will not be considered for award, regardless of
whether the delay was outside the control of the submitting Respondent.
The City reserves the right to negotiate with any and all qualified Respondents submitting timely
proposals and to reject any or all proposals when determined to be in the City's best interest.
3
The City is an Affirmative Action/Equal Opportunity Employer. Minority Business Enterprises,
Small Business Enterprises, Women Business Enterprises, Veteran-Owned Businesses, Labor
Surplus Area firms, Historically Underutilized Businesses ("HUBs"), and other applicable
disadvantaged businesses are encouraged to submit proposals.
<< THIS SPACE WAS INTENTIONALLY LEFT BLANK>>
4
RFP FOR BROADBAND CONSTRUCTION SERVICES
The City is seeking a qualified broadband, telecommunications, fiber-optic, network
infrastructure, utility construction, or similarly qualified contractor to provide construction and
installation services for improvements to the Rio Grande City Public Library.
The selected Contractor shall furnish all labor, materials, equipment, tools, supervision,
transportation, installation, testing, subcontractor coordination, restoration, documentation,
commissioning, and other services necessary to complete the Project in accordance with the
Contract Documents issued by the City.
The Contractor shall coordinate with the City and the City's Designated Engineer during
construction as required by the Contract Documents and the Project.
1. Project Description
The Rio Grande City Public Library broadband infrastructure Project is intended to modernize
the Library's internet and network infrastructure and enhance access to high-speed broadband
services.
The proposed improvements are intended to support:
Education and digital learning;
Workforce development;
Public access to modern broadband services;
Virtual and remote learning opportunities;
Community telehealth access; and
Other technology-based Library programs and services.
The Project generally includes:
Replacement or improvement of outdated internet and network infrastructure;
Extension of high-speed fiber-optic infrastructure to the Rio Grande City Public Library;
Underground installation of the new fiber-optic connection;
Installation of conduit and associated underground infrastructure;
Installation, splicing, termination, and testing of fiber-optic cable;
Installation or replacement of related broadband and network infrastructure;
Connection and integration of new infrastructure with designated Library systems;
Testing and commissioning of completed improvements; and
Restoration of areas affected by construction.
Design Status. As of the date of this RFP, the Project's engineering design is at a preliminary,
high-level design (HLD) stage. Section 16 (Proposed Cost) sets out the City's Designated
Engineer's Rough Order of Magnitude (ROM) cost estimate and the key design assumptions on
which it is based, provided for Respondents' reference in preparing proposals. The ROM
estimate is not a final design and does not represent a guaranteed, fixed, or not-to-exceed
5
price. Respondents should review Section 16 and Section 26 (Engineering Plans and Technical
Documents) carefully before submitting a proposal.
The final Project alignment, quantities, materials, installation methods, plans, specifications, and
technical requirements shall be established by the Contract Documents issued by the City, and
any addenda or other technical requirements subsequently issued by the City.
The Contractor shall not perform professional engineering design services unless specifically
authorized by the City through a separate written amendment or agreement.
The Contractor shall construct the Project in accordance with the Contract Documents issued by
the City. The Contractor shall not modify the engineered design, alignment, specifications, or
other material technical requirements without prior written authorization.
2. Scope Of Work
General Construction Responsibilities
The selected Contractor shall provide all labor, materials, equipment, supervision, tools,
transportation, construction services, installation services, testing, documentation, restoration,
and other items necessary to complete the Project.
The Contractor shall:
Verify field conditions before beginning construction;
Furnish or procure all required materials and equipment;
Coordinate all Work with the City and City's Designated Engineer;
Coordinate the activities of all subcontractors and suppliers;
Maintain responsibility for the quality and timely completion of all Work;
Provide required Project schedules and updates;
Submit required product data, shop drawings, certifications, and other documentation;
Participate in pre-construction and progress meetings;
Promptly identify conflicts or discrepancies encountered in the field;
Protect existing facilities and utilities;
Comply with applicable safety requirements;
Maintain the Project site in a safe and orderly condition;
Perform all required testing;
Correct deficient or nonconforming Work;
Complete required restoration;
Provide final Project documentation; and
Complete the Project no later than December 21, 2026.
6
Underground Fiber Infrastructure
The Project is anticipated to include construction of underground infrastructure required to
extend high-speed fiber-optic connectivity to the Library.
The following Scope of Work is preliminary and is intended to describe the anticipated nature of
the Project. The final scope, quantities, materials, installation methods, and technical
requirements will be established or confirmed by the City and the City's Designated Engineer
prior to the proposal deadline and may be supplemented or modified by written addendum.
Based on the City's Designated Engineer's current preliminary design, the Project considers an
approximate footage of outside plant (OSP) public Rio Grande City right-of-way (ROW) fiber
design of 1,507 linear feet, of which approximately 60 linear feet lies within a Texas Department
of Transportation ("TXDOT") ROW. The preliminary design considers an estimated route length
of approximately 1,507 linear feet between the Network Operations Center ("NOC") and the
Library. These figures are preliminary engineering estimates only and remain subject to change
based on final design, field verification, and permitting.
The Work may include:
Mobilization and site preparation;
Construction layout;
Utility locating and field verification;
Excavation;
Horizontal directional drilling or boring, which is the anticipated method of underground
installation based on the approved permit and current engineering design;
Trenching or other open-cut excavation, if necessary and authorized by the City;
Installation of underground conduit;
Installation of handholes, pull boxes, vaults, or similar telecommunications infrastructure;
Installation of tracer wire, warning tape, markers, or similar identification systems;
Coordination of street, driveway, sidewalk, drainage, and utility crossings;
Protection of existing utilities;
Backfilling and compaction;
Removal of construction debris; and
Restoration of disturbed surfaces and improvements.
The current engineering design and approved permit contemplate horizontal directional boring
as the primary method of underground installation. The anticipated boring depth may exceed
five (5) feet in portions of the Project. The depth of a horizontal bore, by itself, shall not be
construed as trench excavation. Any entry pit, exit pit, receiving pit, trench, or other open
excavation required for the Work shall comply with all applicable excavation and trench-safety
requirements.
The specific methods, depths, materials, conduit sizes, quantities, and locations shall be
governed by the approved plans and specifications. Until final plans are issued, Respondents
7
shall price the Work based on the preliminary design assumptions identified in Section 16
(48-count fiber-optic cable in 1-1.25" HDPE conduit, underground construction, and two (2)
splice points).
Fiber-Optic Installation
The Contractor shall furnish and install the fiber-optic infrastructure specified in the Contract
Documents issued by the City.
The Work may include:
Furnishing fiber-optic cable;
Installing fiber-optic cable in underground conduit or other approved pathways;
Pulling and placing fiber-optic cable;
Fiber splicing;
Fiber termination;
Installation of splice closures and enclosures;
Installation of fiber termination equipment;
Installation of patch panels;
Identification and labeling of installed fibers;
Connection to designated termination points;
Installation of telecommunications cabinets, racks, enclosures, or related infrastructure
where specified; and
Preparation of fiber installation records.
Library and NOC Broadband and Network Infrastructure
Provisioning and testing of active network electronics shall be performed by City IT or the
applicable equipment vendor, unless the Contract Documents expressly assign such
responsibility to the Contractor. The Contractor shall remain responsible for the physical
installation, connection, fiber termination, fiber testing, and other Work expressly assigned to the
Contractor.
To the extent included in the Contract Documents issued by the City, the Contractor may also be
responsible for furnishing and installing broadband and network infrastructure within or
immediately serving the Rio Grande City Public Library and the Network Operations Center
("NOC").
Such work may include:
Telecommunications cabinets or racks;
Fiber termination equipment;
Patch panels;
Structured cabling;
Network cabling pathways;
8
Conduit;
Network connection components;
Switching or related network equipment where specified;
Supporting electrical or communications infrastructure specifically identified by the City;
and
Other broadband-related improvements identified in the approved plans and
specifications.
The Contractor shall coordinate all network connections and integration with the City and City's
Designated Engineer.
3. Subcontractors
The selected Contractor shall be responsible for performing and completing the entire Scope of
Work.
The Contractor may perform the Work through its own forces and, where appropriate, through
qualified subcontractors retained directly by the Contractor.
Subcontracted activities may include, as applicable: directional drilling, boring; trenching,
excavation, underground conduit installation, fiber placement, fiber splicing, telecommunications
installation, network installation, electrical work, concrete or asphalt restoration, landscaping
restoration; and other specialized construction activities.
Any subcontractor utilized for the Project shall be under contract with and the responsibility of
the Contractor and shall not have a direct contractual relationship with the City.
The Contractor shall remain fully responsible to the City for:
Quality of Work;
Compliance with the Contract Documents issued by the City;
Schedule;
Safety;
Coordination;
Testing;
Restoration;
Warranty obligations; and
Successful completion of the Project.
Respondents shall identify all known proposed subcontractors, if applicable, and describe the
portion of the Work each is expected to perform.
The City reserves the right to review proposed subcontractors for compliance with applicable
Contract and grant requirements.
9
The Contractor shall not assign, transfer, or otherwise convey this Contract or any interest in it,
in whole or in part, without the prior written consent of the City. The Contractor shall not
substitute, add, or replace any subcontractor identified in its proposal without the prior written
approval of the City. Any assignment or substitution made without the required written consent is
void and is grounds for termination of the Contract.
4. Coordination During Construction
The Contractor shall coordinate with the City and the City's Designated Engineer during
construction as required by the Contract Documents and the Project.
The City's Designated Engineer will provide limited construction-phase professional services in
accordance with its separate agreement with the City, which may include construction oversight
reporting, review of contractor production reporting, pre-construction and construction
observations, review and response to requests for information or clarification, review of
proposed change orders and recommendations to the City, and review and processing of
Contractor redlines and closeout reports for development of as-built drawings. The City's
Designated Engineer is not responsible for construction management, continuous construction
inspection, the Contractor's means or methods, or certification of the completed construction.
The City Secretary will administer the construction contract, the City Council must approve all
pay applications exceeding $5,000, and the City's Designated Engineer will perform the
applicable final review and closeout services required under its agreement with the City and by
TSLAC.
The Contractor shall remain solely responsible for its construction means, methods, techniques,
sequences, procedures, safety programs, personnel, subcontractors, and timely performance of
the Work.
The Contractor shall:
Participate in a pre-construction conference;
Review plans and specifications before beginning construction;
Coordinate the Work with the City and the City's Designated Engineer;
Submit required product data and shop drawings;
Submit material certifications;
Submit RFIs where clarification is required;
Promptly report field conditions, utility conflicts, or other conditions that differ materially
from the Contract Documents issued by the City;
Participate in progress meetings;
Provide construction schedule updates and promptly identify anticipated delays;
Coordinate required inspections, testing, and commissioning activities;
Provide documentation supporting proposed changes;
Correct deficient or nonconforming Work;
Coordinate punch-list inspections; and
10

With GovernmentContracts, you can:
...of Construction Road Sweepers IFB Purchasing 11/13/2026 12/10/2026 02:00:00 PM (CT)...
Tarrant County
Bid Due: 12/10/2026
...Project: Construction of Richmond Street Ref. #: B27-019 Department: Engineering Type: ITB Status... ...
Fort Bend County
Bid Due: 11/24/2026
...Project ID: Title: Portable Construction and Maintenance Equipment Addenda: 0 Release Date: 10/7.../2026 ...
Houston-Galveston Area Council
Bid Due: 11/19/2026
...Bid Information Type Request for Qualifications Status Issued Number 2027-1030 (Construction Legal...
Mc Allen Independent School District
Bid Due: 12/04/2026