2026 Electrical and Ground Power Substation Replacement

Location: Minnesota
Posted: Aug 24, 2026
Due: Sep 15, 2026
Agency: Metropolitan Airports Commission (MAC)
Type of Government: State & Local
Category:
  • 61 - Electric Wire, and Power and Distribution Equipment
Solicitation No: Solicitation200
Publication URL: To access bid details, please log in.
Project: 2026 Electrical and Ground Power Substation Replacement
Ref. #: Solicitation200
Department: Airport Development
Type: RFB
Status:
Open
Open Date: Aug 24th 2026, 8:00 AM CDT
Questions Due Date: Never
Contact Information: Chris Roy, Director of Airport Development Project Delivery, chris.roy@mspmac.org
Close Date: Sep 15th 2026, 2:00 PM CDT
Project Number(s):
106-2-1119

Project Description: Provide the electrical equipment for medium voltage substations for both normal and emergency power at the shell space at Concourse C. These rooms will connect to an existing electrical room by Gate C1 by building ductbank on the apron, and will provide emergency power feeders back from the Generator building to the new C concourse emergency substation. The electrical room near Gate C1 will be rebuilt for this effort. Civil work will include apron pavement removal and replacement, excavation, duct bank and manhole installation, and backfilling. Construction will include asbestos abatement, concrete work, masonry, steel framing and grating, waterproofing, curtain wall, metal soffit panel installation, doors, gypsum board work, and painting. Mechanical work will include replacement of an existing exhaust system in an electrical room with a new chilled water cooling unit, and rerouting of existing return air pathways back to air handling unit C02. To accommodate the electrical work, two unit heaters will be replaced and underground storm and sanitary lines will be rerouted. Electrical work will include the removal of the existing medium voltage substation in the electrical room by the C1 gate area, along with existing switchboards. The existing electrical substation room will then be converted into an electrical room with distribution switchboards. The medium voltage substations for both normal and emergency power for Concourse C will be provided from the newly built-out space from the previous project. This project will be responsible for the procurement, installation and commissioning of medium voltage substation switchgear, automatic transfer switches, distribution boards, and associated equipment in the new built-out electrical substation rooms. Lastly, electrical work will also include power feeds from the new normal and emergency substation rooms to the electrical room by C1 via the duct bank per this project. Telecommunication work will include new network connections for the new IP controllers and monitoring of new electrical substation equipment.


Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Event Name: Masonry Restoration and Cleaning Business Unit: Admin/State Procurement Event ID...

State Government of Minnesota

Bid Due: 9/21/2026

...: 2A Demo 3A Concrete 4A Masonry 6A Specialties 9A Framing and Drywall ...

Independent School District 196

Bid Due: 9/24/2026

...demolition, curtainwall replacements, doors, door hardware, masonry, finish improvements, painting, pest...

Metropolitan Airports Commission (MAC)

Bid Due: 9/16/2026

...Concrete 4A Masonry 6A Specialties 9A Framing and Drywall 9B Tile 9E Painting ...

Independent School District 196

Bid Due: 9/22/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.