| Location: | Nevada |
|---|---|
| Posted: | Apr 21, 2026 |
| Due: | May 5, 2026 |
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 36C26126R0050 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
SOURCES SOUGHT NOTICE: Project: 654-26-020, Building 12 Pump Power Relocation for Reno VA Classification Code: 6150 (Miscellaneous Electric Power and Distribution Equipment) NAICS Code: 238210 (Electrical Contractors and Other Wiring Installation Contractors)
DISCLAIMER: This is a Sources Sought Notice only. This is NOT a Request for Proposal (RFP), Request for Quote (RFQ), or Invitation for Bid (IFB). No solicitation document currently exists. This notice is issued solely for information and planning purposes—it does not constitute a promise to issue a solicitation in the future and does not commit the Government to contract for any supply or service whatsoever. The Department of Veterans Affairs (VA) is not at this time seeking proposals and will not accept unsolicited proposals. Responders are advised that the U.S. Government will not pay for any information or administrative costs incurred in response to this Sources Sought.
BACKGROUND & SCOPE OF WORK: The purpose of this project is to relocate and add additional power legs to the water pumps in the Building 12 basement, as detailed in the attached document titled “SOW Bldg 12 Power Relocation V2.” The current system directly feeds the pumps with normal power and has no emergency power source tied onto the system. In the event of a power outage, the motor control center will not be able to provide power onto the pumps for the entirety of the building. The contractor shall conduct a thorough review of the work area and existing equipment and identify all potential pathways and hazards that are present in the path of work and determine the most feasible course of action for installation. The new emergency/normal power system is to be fully compliant with the VA Technical Information Library, Veterans Health Administration Electrical Design Manual, and up to date safety codes.
See attached document: SOW Bldg 12 Power Relocation V2
SUBMISSION INSTRUCTIONS: Interested and capable firms are requested to submit a brief Capability Statement (maximum 5 pages) containing the following information:
Action: Please submit your Capability Statement via email to Edwin Rivera at edwin.rivera@va.gov and Jose Hernandez at jose.hernandez1@va.gov.