| Project Title: | Mine Creek Sanitary Sewer Improvements |
| Description: | RFQ Pre-Qualification: Mine Creek Sanitary Sewer Improvements: Installation of approximately 15,500 LF of replacement 24-inch, 30-inch, 36-inch, and 42-inch gravity sewer and associated replacement concrete and polymer concrete manholes. Installation of approximately 13,000 LF of CIPP structural liner in existing of 24-inch, 30-inch, 36-inch gravity sewer and epoxy lining of associated existing manholes. Abandonment of the existing 24-inch gravity sewer through Shelley Lake Dam Installation of two pre-cast junction structures to maintain adequate flow splits in the Mine Creek sanitary sewer system. Installation of approximately 1,720 LF of stream stabilization measures. Removal and replacement of an existing greenway bridge and miscellaneous greenway improvements. |
| Opening Date: | 1/29/2026 2:00 PM |
| Posted Date: | 12/16/2025 |
| Status: | Open |
| Department: | CITY OF RALEIGH |
|
Solicitation Number
*
274-WS-2018-30R1
|
Department
CITY OF RALEIGH
|
Status Reason
Open
|
|
|
Opening Date
2026-01-29T14:00:00.0000000
|
Posted Date
*
2025-12-15T19:13:38.0000000Z
|
Commodity Code
Design Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
Bid Agent: RSprowl@Brwncald.com
|
Solicitation Type
*
Select RFP IFB RFI
|
|
|
Owner
Shaketha Edwards
|
|||
|
Description
RFQ Pre-Qualification: Mine Creek Sanitary Sewer Improvements: Installation of approximately 15,500 LF of replacement 24-inch, 30-inch, 36-inch, and 42-inch gravity sewer and associated replacement concrete and polymer concrete manholes. Installation of approximately 13,000 LF of CIPP structural liner in existing of 24-inch, 30-inch, 36-inch gravity sewer and epoxy lining of associated existing manholes. Abandonment of the existing 24-inch gravity sewer through Shelley Lake Dam Installation of two pre-cast junction structures to maintain adequate flow splits in the Mine Creek sanitary sewer system. Installation of approximately 1,720 LF of stream stabilization measures. Removal and replacement of an existing greenway bridge and miscellaneous greenway improvements.
|
|||
|