| Location: | California |
|---|---|
| Posted: | May 15, 2026 |
| Due: | Jun 9, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | NAVMWR-26-R-0038 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The project includes all design and construction necessary to renovate and modernize the eight (8) lane Bowling Center (Bldg. 485) to include replacement of the existing pinsetter unit with new pinsetter unit to include string bowling, electronic gaming area and food operation including all demolition, installation, renovation, temporary construction and restoration necessary to produce a complete and useable facility.
The Work includes, but not limited to:
1. Site Investigation: The Contractor shall provide all surveys and perform all necessary site investigation utility locates (including, but not limited to, sub-surface utility “pot holing”) as required to complete the design and/or construction of the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Contracting Officer’s Representative (COR).
2. Site Development and Design: The Contractor shall provide complete architectural, civil, structural, mechanical, electrical, landscape and fire protection designs, required to construct the facility in accordance with all codes, laws and requirements. The Contractor shall refer to Section H for additional information regarding design submittal requirements.
3. Materials: The Contractor shall provide all materials, furnishings, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging,
delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work.
Additional information provided in attached RFP.
| May 7, 2026 | [Solicitation (Original)] BOWLING CENTER AND F&B UPGRADES |
| Jun 1, 2026 | [Solicitation (Updated)] BOWLING CENTER AND F&B UPGRADES |

With GovernmentContracts, you can:
...Project ID: P24273 Title: Electrical Supplies Addenda: 0 Release Date: 5/18/2026 Due Date: ...
Santa Clara Valley Transportation Authority
Bid Due: 6/16/2026
...Electrical Improvement Project PublicPurchase.com 06/29/2026 2:00 PM 06/16/2026 10:00 AM...
City of Porterville
Bid Due: 6/29/2026
...145930 - 145930 SWITCHBOARD, ELECTRICAL Status Stage Open Posted 6/8/2026 Bid Due 6/15/2026, ...
City of Los Angeles
Bid Due: 6/15/2026
...Bid Details PW-013 As-Needed Electrical Distribution/Transmission, Installation, and Construction... electrical transmission/distribution installation and ...
San Francisco Public Utilities Commission
Bid Due: 7/16/2026