| Location: | Washington |
|---|---|
| Posted: | Oct 28, 2025 |
| Due: | Dec 9, 2025 |
| Agency: | City of Lynnwood |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 3902 |
| Publication URL: | To access bid details, please log in. |
Project ID: 3902
Title: ITB - Connecting Lynnwood: Poplar Way Bridge
Addenda: 0
Release Date: 10/28/2025
Due Date: 12/9/2025
Construction of a new multimodal six-lane bridge over I-5 between the intersections of 196 th Street SW (State Route 524) & Poplar Way and 33rd Avenue W & Alderwood Mall Boulevard. The bridge will provide multimodal travel with a sidewalk (west side) and shared use path (east side). The two intersections will be modified to meet the profile and width of the new bridge, and a tunnel (three-sided concrete box structure) will be constructed to allow the Interurban Trail to pass beneath the new bridge. Widening and restriping of portions of Poplar Way, 196th Street SW, Alderwood Mall Boulevard, 33rd Avenue W, and Alderwood Mall Parkway are also included.
Federal Aid Number: STPUL-IMD-REP-RAISE-STBG-HLP-2004(037)
Please see Full Project Manual for all project details.

With GovernmentContracts, you can:
...Time Draft Response No Bid34 days, 19 hours, 41 minutes Post Information Posted ...
City of Seattle
Bid Due: 7/29/2026
..., 37 minutes Post Information Posted At:Wed, Jun 24, 2026 12:00 AM Sealed ...
City of Seattle
Bid Due: 8/12/2026
...Project ID: ITB# TR0-6760 Title: Concrete and Asphalt Cutting and Drilling Addenda: 0 ...
City of Seattle
Bid Due: 8/31/2026
...reinforced concrete connected to the existing concrete using dowels, additional of external post..., ...
City of Seattle
Bid Due: 8/05/2026