| Location: | Texas |
|---|---|
| Posted: | Dec 17, 2025 |
| Due: | Dec 29, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | PANMCC0000 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
All regulations and restrictions as they apply on base will also apply for this contract. Must be able to comply with DoD Information Assurance (IA) and Army Cybersecurity policies.
Place of Performance: Belton, TX 76513
Period of Performance: Subject to Change
Base Year: 15 January 2026 to 14 January 2027
Option Year 1: 15 January 2027 to 14 January 2028
Option Year 2: 15 January 2028 to 14 January 2029
Option Year 3: 15 January 2029 to 14 January 2030
Option Year 4: 15 January 2030 to 14 January 2031
Your points of contact regarding this requirement are as follows:
Contract Specialist: Chasity.n.griffin.civ@army.mil
Contracting Officer: Marcellus.j.newson.civ@army.mil
THIS IS A REQUEST FOR INFORMATION
Description:
This is a non-personal service contract to establish and provide high- speed and secure wireless internet for government, contractors, inventory systems, and security devices throughout a warehouse facility.
Complete site survey and network design report. Install and configure internet and LAN/WLAN infrastructure.
Test and verify report with performance benchmarks.
Install structured cabling (Category 6A or higher) for data drops, access points, and backbone connections.
Install and configure managed network switches, routers, and firewalls meeting DoD-compliant security standards. Deploy Wi-Fi 6 (802.11ax) access points ensuring full coverage across the warehouse, administrative offices, and loading zones.
Install network racks, patch panels, cable management, and surge protection systems.
Perform cable labeling, routing, and certification testing.
Conduct a comprehensive site survey to assess building layout, construction type, and existing network infrastructure.
Identify suitable cable pathways, equipment rack locations, and access point mounting points.
All questions must be submitted no later than 3:00 PM Central Time (UTC-5) on December 26, 2025, to both the Contract Specialist and the Contracting Officer at the above email addresses. E-mail is the preferred method for questions.
Please see attachment.

With GovernmentContracts, you can: