| Location: | Texas |
|---|---|
| Posted: | Oct 28, 2025 |
| Due: | Nov 21, 2025 |
| Agency: | City of Waco |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB 2025-059 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project generally consists of the expansion of the existing Bull Hide Wastewater Treatment Facility to 4.0 mgd ADF and 16.0 mgd P2HF, including construction of a new Influent Pump Station, Headworks to screen and degrit, Flow Distribution Structure, Process Trains C and D, Mixed Liquor Splitter Box, Secondary Clarifiers C and D, Disk Filter, UV Disinfection Equipment (replace existing outdated equipment), Solids Storage and Thickening Facilities, Odor Control Systems, Alum Feed Facility, Electrical and Blower Buildings/Enclosures, and site civil piping, grading and drainage improvements.

With GovernmentContracts, you can:
...Station No. 2 Door Replacement (rebid)) Issue Date & Time 7/22/2026 04:21:46 PM ...
County of Brazos
Bid Due: 8/13/2026
...Station and associated piping, electrical, controls, generator relocation, temporary by-pass system... Project: Speegleville ...
City of Waco
Bid Due: 8/12/2026
...Station No. 2 Door Replacement (rebid)) Issue Date & Time 7/22/2026 04:21:46 PM ...
City of College Station
Bid Due: 8/13/2026
...and associated electrical and control components associated with the following chemical feed applications... ...
City of Sugar Land
Bid Due: 8/06/2026