| Location: | Texas |
|---|---|
| Posted: | Oct 28, 2025 |
| Due: | Nov 21, 2025 |
| Agency: | City of Waco |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB 2025-059 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project generally consists of the expansion of the existing Bull Hide Wastewater Treatment Facility to 4.0 mgd ADF and 16.0 mgd P2HF, including construction of a new Influent Pump Station, Headworks to screen and degrit, Flow Distribution Structure, Process Trains C and D, Mixed Liquor Splitter Box, Secondary Clarifiers C and D, Disk Filter, UV Disinfection Equipment (replace existing outdated equipment), Solids Storage and Thickening Facilities, Odor Control Systems, Alum Feed Facility, Electrical and Blower Buildings/Enclosures, and site civil piping, grading and drainage improvements.

With GovernmentContracts, you can:
...located on-site. The project area contains existing sidewalks, playground equipment, benches, concrete..., landscape, ...
Granbury city
Bid Due: 6/10/2026
...portion of the major equipment has been preselected, with bid information included in ...
City of Fort Worth
Bid Due: 6/25/2026
...this contract consists of furnishing all materials, products, appurtenances, tools, equipment, labor... of ...
City of Irving
Bid Due: 6/26/2026