| Location: | Massachusetts |
|---|---|
| Posted: | Aug 13, 2025 |
| Due: | Aug 28, 2025 |
| Agency: | Wright-Pierce |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Project includes the following Work:
The work consists of two primary components.
The first is constructing the Assonet Pump Station, Cole River Pump Station, RK Pump Station, and Swansea Mall Pump Station; including precast concrete wet well, valve vault, meter vault, sewer force mains, gravity sewer, water service, electrical and control equipment, paving, fencing, site lighting, site grading and restoration, equipment start-up and pump station commissioning.
The second is, the installation of gravity sewer mains, manhole structures, force mains, air release valves and structures, force main cleanout structures, sewer laterals, directional drilling of force main, trench paving and site restoration, and all performance testing to construct the sewer collection system in the area generally described as the Route 6 Corridor and as shown on the plans.

With GovernmentContracts, you can:
...Header Information Bid Number: BD-27-1317-1317C-1317L-133047 Description: RC-27-01 Commissioning... Conference: Bulletin Desc: RC-27-01 Commissioning ...
Commonwealth of Massachusetts
Bid Due: 9/23/2026
...Bid Number: RC-27-01 Bid Title: RC-27-01 Commissioning Provider (CxP) Services for the Reading...) ...
Town of Reading
Bid Due: 9/30/2026
...Bid Number: RC-27-01 Bid Title: RC-27-01 Commissioning Provider (CxP) Services for the Reading...) ...
Town of Reading
Bid Due: 9/23/2026
...piping, plumbing, electrical connections, controls, testing, startup, and commissioning; and all labor...
Town of Yarmouth
Bid Due: 9/30/2026