Title: RTU HVAC Replacements at Edgewood and Lincoln Bassett Schools-NHPS
Addenda: 0
Release Date: 8/14/2025
Due Date: 9/2/2025
The project consists of the turn-key replacement of fifteen (15) HVAC units, nine (9) at Edgewood School and six (6) at Lincoln Bassett School. Most are Roof Top Units (RTUs), some are Remote Condenser Units (RCUs) with section coils in nearby Air Handler Units (AHUs).
The project will be design-build with "like-for-like" replacements. If like-for-like replacements are not available, a compatible solution must be proposed. Drawings and submittals must satisfy permitting and Connecticut Administrative Services requirements.
The scope includes, but not limited to - removal and disposal, furnish and install, permitting, rigging, controls integration, and engineered drawings as applicable. Since work will occur when buildings are occupied, careful coordination will be required - including after school dismissal arrangements.
All work must be completed and invoiced by December 19, 2025.
The District was awarded two HVAC Indoor Air Quality Grants by CT DAS on 5/13/24. Edgewood project 093-001 HVACN and Lincoln Bassett project 093-002 HVACN. The deadline for completion is December 19th, 2025.