Wastewater Treatment Plant System Improvements

Location: Washington
Posted: May 13, 2026
Due: Jun 9, 2026
Agency: City of Pasco
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Bid Title: Wastewater Treatment Plant System Improvements
Category: Public Works - Current Bids
Status: Open
Description:

CITY OF PASCO – REQUEST FOR QUALIFICATIONS (RFQ)

Wastewater Treatment Plant System Improvements

The City of Pasco is soliciting Statements of Qualifications (SOQs) from qualified consulting engineering firms to provide professional services for the evaluation, design, and preparation of construction documents for improvements to the City’s Wastewater Treatment Plant (WWTP). Project elements include, but are not limited to, upgrades to the non-potable water pumping system and the anaerobic digester gas storage and gas handling systems.

The selected consultant will assist the City in developing a comprehensive project to address aging infrastructure and equipment that has exceeded its useful service life. Anticipated improvements include evaluation and replacement of non-potable water system pumps, anaerobic digester cleaning, valve replacement, and upgrades to the digester gas handling system. Work will also include evaluation and replacement of the existing digester gas storage membrane (Dystor membrane or approved equal), along with associated system components to improve reliability, safety, and operational performance.

The complete RFQ and full scope of work may be obtained via the City website – http://www.pasco- wa.gov/Bids.aspx. It is the sole responsibility of the Consultant to obtain any RFQ updates or addenda from the City’s website.

Responses shall be submitted electronically. One electronic copy, including attachments, shall be transmitted to Dustin Wittman at For security reasons, you must enable JavaScript to view this E-mail address.. Email Subject shall be: Wastewater Treatment Plant System Improvements – SOQ with a maximum size of 20MB. The due date is Tuesday, June 9th, 2026, no later than 11:00AM PDT.

Technical questions regarding the scope of this project should be put in writing and directed to both City Representatives listed in Section 1.9 of the RFQ, no less than three (3) working days prior to the time that submittals are due. There is no pre-proposal site meeting for this project. This project is funded by the 2025-2026 local budget.

The City of Pasco, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252,42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

Projects funded wholly or in part by Federal appropriations must comply with Code of Federal Regulations; 24 CFR 570.502, 24 CFR 85.36, 2 CFR 200. All federally-funded projects will be held to federal Equal Employment Opportunity (EEO) requirements.  The City of Pasco is an equal opportunity and affirmative action employer. Small, minority, and women-owned businesses are encouraged to submit bids.  The City of Pasco in accordance with Section 504 of the Rehabilitation Act and the Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in all of its programs and activities.  This material can be made available in an alternate format by e-mailing Dustin Wittman at For security reasons, you must enable JavaScript to view this E-mail address. or calling (509) 545-3447.

Those submitting Firms determined to be best qualified to undertake the services required under this Request for Qualifications (RFQ) may be invited to make a presentation to the City’s interview team.

The City reserves the right to reject any and all responses and to waive technicalities or irregularities, and after careful consideration of all submissions and factors involved make the award best serve the interests of the City of Pasco.

Para más información o para solicitar un intérprete, favor de comunicarse con Litzy Olivera al 509-544-4135 o For security reasons, you must enable JavaScript to view this E-mail address..

Publication Date/Time:
5/13/2026 8:00 AM
Publication Information:
Tri-City Herald
Closing Date/Time:
6/9/2026 11:00 AM
Submittal Information:
Electronic Submittal - submit to: [email protected]
Bid Opening Information:
Statement of Qualification
Pre-bid Meeting:
N/A
Contact Person:
Steve Brewer - Public Works Service Manager - [email protected]

Kent McCue - Operations Manager - [email protected]

Dustin C Wittman, CPSM - Project Support Specialist - [email protected]

General Inquiries: [email protected]

Download Available:
City of Pasco Website
Fee:
No fee to download or submit
Plan & Spec Available:
N/A
Business Hours:
Mon-Fri: 8:00a-5:00p
Fax Number:
N/A
Plan Holders List:
N/A
Related Documents:

Attachment Preview

Public Works Department – Engineering
525 N Third Avenue
Pasco, WA 99301
Phone 509.544.4135
REQUEST FOR QUALIFICATIONS
Engineering Services for
Wastewater Treatment Plant (WWTP)
System Improvements
RESPONSE DUE: Tuesday, June 9, 2026, at 11:00AM PDT
May 2026
CITY OF PASCO, WASHINGTON
Wastewater Treatment Plant (WWTP) System Improvements RFQ
TABLE OF CONTENTS
1 INFORMATION AND INSTRUCTIONS ..............................................................................................................3
1.1 INVITATION TO PROPOSE.......................................................................................................................3
1.2 INTENT OF THE CITY ...............................................................................................................................5
1.3 QUESTIONS...............................................................................................................................................5
1.4 SUBMISSION PROCEDURES...................................................................................................................5
1.5 LATE SUBMITTALS AND MODIFICATIONS.............................................................................................5
1.6 WITHDRAWAL OF SUBMITTALS .............................................................................................................5
1.7 CONDITIONS AFFECTING THE WORK ...................................................................................................6
1.8 RFQ CONTENTS .......................................................................................................................................6
1.9 CITY REPRESENTATIVES........................................................................................................................6
1.10 FORMAT OF SUBMITTALS .......................................................................................................................7
1.11 BASIS FOR SELECTION ...........................................................................................................................7
1.12 ADA DIGITAL ACCESSIBILITY COMPLIANCE.........................................................................................8
1.13 PROFESSIONAL SERVICES AGREEMENT.............................................................................................8
2 SCOPE OF WORK .............................................................................................................................................9
2.1 BACKGROUND ..........................................................................................................................................9
2.2 PURPOSE ............................................................................................................................................... 10
2.3 SCOPE OF WORK .................................................................................................................................. 10
2.4 CITY RESPONSIBILITIES....................................................................................................................... 11
3 SELECTION CRITERIA................................................................................................................................... 11
3.1 SUBMITTAL REQUIREMENTS .............................................................................................................. 11
3.2 CONSULTANT QUALIFICATIONS ......................................................................................................... 13
3.3 INTERVIEW PROCESS .......................................................................................................................... 13
APPENDIX A: PROFESSIONAL SERVICES AGREEMENT
Page 2 of 13
CITY OF PASCO, WASHINGTON
Wastewater Treatment Plant (WWTP) System Improvements RFQ
1 INFORMATION AND INSTRUCTIONS
1.1 INVITATION TO PROPOSE
The City of Pasco is soliciting Statements of Qualifications (SOQs) from qualified consulting engineering firms to
provide professional services for the evaluation, design, and preparation of construction documents for
improvements to the City’s Wastewater Treatment Plant (WWTP). Project elements include, but are not limited to,
upgrades to the non-potable water pumping system and the anaerobic digester gas storage and gas handling
systems.
The selected consultant will assist the City in developing a comprehensive project to address aging infrastructure
and equipment that has exceeded its useful service life. Anticipated improvements include evaluation and
replacement of non-potable water system pumps, anaerobic digester cleaning, valve replacement, and upgrades
to the digester gas handling system. Work will also include evaluation and replacement of the existing digester
gas storage membrane (Dystor membrane or approved equal), along with associated system components to
improve reliability, safety, and operational performance.
The complete RFQ and full scope of work may be obtained via the City website – http://www.pasco-
wa.gov/Bids.aspx. It is the sole responsibility of the Consultant to obtain any RFQ updates or addenda from the
City’s website.
Responses shall be submitted electronically. One electronic copy, including attachments, shall be transmitted to
Dustin Wittman at wittmand@pasco-wa.gov. Email Subject shall be: Wastewater Treatment Plant System
Improvements – SOQ with a maximum size of 20MB. The due date is Tuesday, June 9th, 2026, no later than
11:00AM PDT.
Technical questions regarding the scope of this project should be put in writing and directed to both City
Representatives listed in Section 1.9 below, no less than three (3) working days prior to the time that submittals
are due.
Projects funded wholly or in part by Federal appropriations must comply with Code of Federal Regulations; 24
CFR 570.502, 24 CFR 85.36, 2 CFR 200. All federally-funded projects will be held to federal Equal Employment
Opportunity (EEO) requirements. The City of Pasco is an equal opportunity and affirmative action employer.
Small, minority, and women-owned businesses are encouraged to submit bids. The City of Pasco in accordance
with Section 504 of the Rehabilitation Act and the Americans with Disabilities Act (ADA), commits to
nondiscrimination on the basis of disability, in all of its programs and activities. This material can be made
available in an alternate format by e-mailing Dustin Wittman at wittmand@pasco-wa.gov or calling (509) 545-
3447.
The City of Pasco, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252,42
U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that will affirmatively ensure that any
contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and
fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of
race, color, or national origin in consideration for an award.
Those submitting Firms determined to be best qualified to undertake the services required under this Request for
Qualifications (RFQ) may be invited to make a presentation to the City’s interview team.
The City reserves the right to reject any and all responses and to waive technicalities or irregularities, and after
careful consideration of all submissions and factors involved make the award to best serve the interests of the
City of Pasco.
Para más información o para solicitar un intérprete, favor de comunicarse con Litzy Olivera al 509-544-
4135 o oliveral@pasco-wa.gov.
Page 3 of 13
City of Pasco, Washington
CITY OF PASCO, WASHINGTON
Wastewater Treatment Plant (WWTP) System Improvements RFQ
_________________________________________
Prepared by Steve Brewer – PW Service Manager &
______________________________________
Kent McCue – Operations Manager
____________________________________________
Reviewed by Dustin Wittman, CPSM – Public Works Project Coordinator II
____________________________________________
Approved by Andrey Avetisyan, PE – Engineering Manager
Page 4 of 13
1.2 INTENT OF THE CITY
CITY OF PASCO, WASHINGTON
Wastewater Treatment Plant (WWTP) System Improvements RFQ
The objective of this RFQ is to provide sufficient information to enable qualified Consultants to submit a single,
written SOQ. The Consultant’s SOQ shall demonstrate their recent and relative engineering experience in the
design of non-potable water pumping system, Dystor Membrane and Verec Gas Flare System improvements. As
part of the project team, the selected Consultant is expected to work closely with City Engineering and Operations
staff, sub-consultants, contractors, and construction management firms to successfully complete the projects.
This RFQ is not a contractual offer, nor is it a commitment to purchase services. Contents of this RFQ and the
Consultant’s submittal will be used as the basis to determine final contractual obligations. It is understood that this
RFQ and the successful Consultant’s submittal may be attached or included by reference, in part or in whole, to
any agreement regarding the services included in this RFQ between the City and said Consultant.
1.3 QUESTIONS
Any explanation desired by a submitting Consultant regarding the meaning or interpretation of the RFQ, or any part
thereof, must be submitted in writing (via e-mail) and directed to both City Representatives listed in Section 1.10,
no less than three (3) working days prior to the time that submittals are due.
Any interpretation made will be in the form of an addendum to the RFQ, issued by the City and will be posted to the
City Website – http://www.pascowa.gov/Bids.aspx. It is the sole responsibility of the Consultant to obtain any RFQ
updates or addenda. Please include “Wastewater Treatment Plant System Improvements – RFQ” in the subject
line for all emails and correspondence related to this project.
1.4 SUBMISSION PROCEDURES
For consideration, Consultants shall submit an electronic copy of their SOQ. Failure to provide the submittal in the
appropriate manner will result in disqualification. Hard-copy or fax submittals are not permitted and will not be
accepted. One electronic copy, including attachments, shall be transmitted to Dustin Wittman at wittmand@pasco-
wa.gov. Receipt time of submittal will be considered the time-stamp of the incoming email created automatically by
the City’s email server. Consultants are encouraged to submit the SOQ’s with adequate time for the email to be
processed by the City’s email server, with a maximum size of 20MB.
Email Subject shall be:
Wastewater Treatment Plant System Improvements – SOQ
Due Date:
Tuesday, June 9, 2026, no later than 11:00AM PDT
1.5 LATE SUBMITTALS AND MODIFICATIONS
Submittals and modifications thereof received after the stated time of closing will not be considered. The City is not
responsible for late deliveries. In accordance with the Due Date from Section 1.4 of this RFQ, the time of closing
will be determined per the Pacific Time Clock at http://www.time.gov/.
1.6 WITHDRAWAL OF SUBMITTALS
Submittals may be withdrawn by written request up to one (1) hour after the stated time of closing, as mentioned
above. Determination of the one-hour grace period shall be calculated based on the same reference as identified
in Section 1.5.
Page 5 of 13
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Follow Sampling, Inspection, & Cleaning of Oily Water Separator System Active Contract..., supervision, ...

HOMELAND SECURITY, DEPARTMENT OF

Bid Due: 6/15/2026

...Number PW ITB 6557-26 Title Water Department Main Office Renovation - Phase 2 ...

City of Spokane

Bid Due: 6/15/2026

...Solicitation Close Date: 06/16/26 Title: BC - Replacement of 5 Water Source Heat ...

State Government of Washington

Bid Due: 6/16/2026

...Follow USCGC Polar Star Reduction Gear Water Pumps Active Contract Opportunity Notice ID... ...

HOMELAND SECURITY, DEPARTMENT OF

Bid Due: 7/08/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.