| Location: | Massachusetts |
|---|---|
| Posted: | Jun 25, 2025 |
| Due: | Jul 23, 2025 |
| Agency: | Town of Barnstable Invitation |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY25-IFB-081 |
| Publication URL: | To access bid details, please log in. |
Project Description: The work to be performed under this contract includes, but is not limited to, furnishing all labor, materials, and equipment necessary for the installation of approximately 7,500 feet of 16” ductile iron water main on Mary Dunn Road, between the Hyannis Water Department tank site and Airport Road, including all valves, hydrants, and connections. Work includes utility work at the tank site including installation of a chlorination vault and associated conduits.

With GovernmentContracts, you can:
...of existing underground power/control conduit from Taylor Station to the Taylor Well site, ...
Wright-Pierce
Bid Due: 6/23/2026
...stairs, steel railings and guard rails, installation of underground conduit, boxes, transformer pad...
Lowell Housing Authority
Bid Due: 6/22/2026
...and guard rails, installation of underground conduit, boxes, transformer pad and electrical service...
Commonwealth of Massachusetts
Bid Due: 6/22/2026
...sealant above the waterline in the auxiliary spillway and in the principal spillway ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 6/19/2026