RFP Saratoga Springs Pony Express Parkway Completion Project

Location: Utah
Posted: Feb 5, 2026
Due: Feb 25, 2026
Agency: State Government of Utah
Type of Government: State & Local
Category:
  • 99 - Miscellaneous
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 2026-001
Publication URL: To access bid details, please log in.
Project: RFP Saratoga Springs Pony Express Parkway Completion Project
Ref. #: 2026-001
Department: CITIES - City of Saratoga Springs
Type: RFP
Status:
Open
Open Date: Jan 22nd 2026, 12:00 AM MST
Questions Due Date: Feb 19th 2026, 3:00 PM MST
Close Date: Feb 25th 2026, 3:00 PM MST

Project Description: The main elements of the project consist of the following design activities:
• Design the roadway widening of Pony Express Parkway, approximately 6,150’ in length. The project begins on Pony Express Parkway near Tallulah Lane and extends east, including a signalized intersection at Saratoga Road on the East Side of the River, a new bridge supporting a 5 lane road over the Jordan River, and ends at the intersection of Saratoga Road where it connects to an existing widening project currently under design by the City.
• Design a bridge removal and replacement of the existing Saratoga Springs Road over Jordan River (049062D) following the process and procedures of UDOT and the current Structures Design and Detailing Manual (SDDM), Geotechnical Manual of Instruction (GMOI), Drainage Manual of Instruction (DMOI), and any other standards applicable to UDOT structures design standards.
• Design a trail connection for the Lakeshore/Jordan River trail under the new bridge.
• Design a removal and/or relocation the pedestrian bridge on the east side of the roadway.
• Design the improvements to connect seamlessly to the planned UTA project at the intersection of Pony Express Parkway and Seaside Street (800 East), using UTA final design documents and, when available, record drawings to confirm geometry, elevations, signal interconnect, striping, and ADA and shared use trail connection
• Design the improvements to connect seamlessly to the existing Pony Express Widening Project that starts at and includes the Intersection of Saratoga Road (2300 West) using final design documents and, when available, record drawings to confirm geometry, elevations, signal interconnect, striping, and ADA and shared use trail connection
• Coordinate utility conflicts with the appropriate entities, such as the City, Eagle Mountain City, Lehi City, and Timpanogos Special Service District (TSSD).
• Design for stormwater runoff control and disposal.
• Design of lighting consistent with City’s design standards.
• For bridges, conduct required geotechnical investigation, analysis, and recommendations following the process and procedures of UDOT and the current GMOI standards.
• For bridges, conduct required hydraulic investigation, analysis, and recommendations following the process and procedures of UDOT and the current DMOI standards.


Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.