| Location: | Washington |
|---|---|
| Posted: | Sep 8, 2025 |
| Due: | Sep 22, 2025 |
| Agency: | City of Vancouver |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Skanska - Notice |
| Publication URL: | To access bid details, please log in. |
Project Description: Skanska USA Building, Inc.
Notice of Public Hearing
City of Vancouver – Public Works Operations Campus
Intent to Conduct Alternative Selection Process
Electrical Contractor Construction Manager (EC/CM)
Mechanical Contractor Construction Manager (MC/CM)
Hearing Date/Time: September 22, 2025 at 2:00p.m.
Location: City Hall
Birch Conference room
415 W 6th St,
Vancouver, WA 98660
Pursuant to RCW 39.10.385, a public hearing will be held by Skanska USA Building, Inc. (Skanska), and the City of Vancouver (Owner) regarding the intent to utilize the alternative subcontractor selection process for the Public Works Operations Campus Project. The Owner and Skanska are in the process of determining if this project meets the criteria established in RCW 39.10.385 for use of the EC/CM and MC/CM process. Among the most important factors in this determination is the critical importance of having the Electrical and Mechanical subcontractors involved during the design phase. It is important during design that the EC/CM and MC/CM provide detailed construction scheduling, input into procedures and specifications, input into design constructability issues, coordination of contract documents, determination of construction logistics and construction phasing, detailed cost estimates and early procurement of long-lead equipment.

With GovernmentContracts, you can:
...construction projects, PSNS&IMF needs short-haul flatbed trucking services to relocate between.... 7.3. Scheduling: ...
DEPT OF DEFENSE
Bid Due: 6/16/2026