Terminal MEP/HVAC Renovations
| Location: |
Florida |
| Posted: |
Mar 30, 2026 |
| Due: |
May 5, 2026 |
| Agency: |
Melbourne Orlando International Airport |
| Type of Government: |
State & Local |
| Category: |
- Z - Maintenance, Repair or Alteration of Real Property
|
| Solicitation No: |
ITB 2026-0330 |
| Publication URL: |
To access bid details, please log in. |
Main
Agency
Melbourne Orlando International Airport
Status
Active
Title
Terminal MEP/HVAC Renovations
Type
Announcement
Department
Online Submissions
No
Project Estimate
Piggyback Solicitation
No
Insurance Required
No
Bid Bond Required
Yes
Bid Bond Amount
5%
Performance Bond Required
No
Performance Bond Amount
Construction Bond Required
Yes
Construction Bond Amount
100%
Scope of Services
The Melbourne Airport Authority (MAA) is seeking to replace the main terminal building’s mechanical, electrical and plumbing systems. The existing MEP systems range in age to 1988. This will be a multi-year, multi-phase project contingent upon grant funding. This first phase will be for the purchase of the HVAC and electrical equipment for the central energy plant. This is a Lump Sum Contract.
The successful bidder will be responsible for maintenance of traffic, coordination with other contractors that may be doing work within the area, and for providing maximum support to the Melbourne Airport Authority in maintaining their operations and other functions at times specified by the Owner during installation. Construction will occur while the airport is operational, and provisions will need to be made to accommodate existing airfield activities adjacent to the project zone.
The Scope of Services for the Bidder as part of this Request includes all elements related to value engineering, scheduling, permitting, subcontractor bidding and contracting, supervision of the work, document control of all submittals, RFI`s, ASI`s, etc., coordination of inspections, commissioning, training and project close-out. It will be the responsibility of the awarded Bidder to coordinate their activities and schedules with Airport Operations, tenants, and any other contractors that may be working in the vicinity to minimize conflicts and delays. Special coordination and a high level of expectation by the Owner will be held on the selected Bidder to provide maximum coordination, support, and professionalism to this project.
It should be understood by all participating Bidders that the Melbourne Airport Authority reserves the right to supplement, expand, and modify the information and requirements prior to distribution of the final Addendum.
Dates(All times are listed as
EST
)
Broadcast Date
3/30/2026 7:00 PM EST
Question End Date
4/28/2026 5:00 PM EST
Sample Due Date
Due Date
5/5/2026 2:00 PM EST
Bid Opening Date
Question End Date Reminder Notification
5 Day(s)
Sample Due Date Reminder Notification
0 Day(s)
Due Date Reminder Notification
5 Day(s)
Pre-Bid Meetings
Total: 1
(All times are listed as
EST
)
|
Date
|
Time
|
Mandatory
|
Location
|
|
4/9/2026
|
11:00 AM
|
No
|
A non-mandatory Pre-Bid Conference will be held in the Melbourne Airport Authority Board Room,
One Air Terminal Parkway, Suite 220, Melbourne, Florida 32901 on Thursday, April 9, 2026 at
11:00 AM EDT at which time a site visit will follow. Bidders must have visited the site prior to
bidding or will be disqualified from bidding. Prospective bidders unable to attend the Pre-Bid
Conference may arrange to visit the site between April 14, 2026, and April 23, 2026, on
Tuesdays, Wednesdays, or Thursdays only. The site is in a secure area of the Airport requiring
escort. To arrange, please contact Sandra Acevedo at 321-723-6227, ext. 123, or
sacevedo@mlbair.com and provide 24 to 48 hours advance notice.
|
Shortlist Meeting
Total: 0
(All times are listed as
EST
)
Documents
Total: 2
|
Type
|
Name
|
Description
|
File Type
|
|
|
Invitation to Bid
|
260330 Specifications 1.pdf
|
Invitation to Bid, Specifications
|
PDF
|
|
|
Invitation to Bid
|
260330 Bid Set.pdf
|
Invitation to Bid, Set
|
PDF
|
|
Commodity Codes
Total: 7
|
Code
|
Description
|
|
[958-26]
|
Construction Management Services
|
|
[906-10]
|
Buildings - Architectural Design
|
|
[925-33]
|
Engineer Services, Professional
|
|
[925-34]
|
Energy Management Engineering
|
|
[914-68]
|
Plumbing
|
|
[914-38]
|
Electrical
|
|
[925-67]
|
Mechanical Engineering
|
Publications
Total: 1
|
Publication
|
Date
|
|
Florida Today
|
3/30/2026
|
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...Bond Amount Construction Bond Required No Construction Bond Amount Scope of Services The ...
Manatee County School District
Bid Due: 6/30/2026
...Bond Amount Construction Bond Required No Construction Bond Amount Scope of Services The ...
Polk County Public Schools Facilities and Operations
Bid Due: 7/01/2026
...Bond Amount Construction Bond Required No Construction Bond Amount Scope of Services The ...
Polk County Public Schools Facilities and Operations
Bid Due: 6/30/2026
...Required No Performance Bond Amount Construction Bond Required No Construction Bond Amount Scope... ...
Polk County Public Schools Facilities and Operations
Bid Due: 6/29/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.