| Location: | Wisconsin |
|---|---|
| Posted: | Mar 17, 2025 |
| Due: | Mar 28, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912ES25QA011 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
SUBJECT: Scope of Work/Technical Specifications
Dredge Goetz Discharge Hose (Quantity 2)
1. General Information.
2. Shipping Address.
Plant and Facilities Manager
431 North Shore Drive
PO BOX 397
Fountain City, WI 54629
3. Salient Characteristics.
Hose Specifications
Quantity, Two Each (2)
20” ID x 24’ long
200 psi operating pressure
Built-in steel reinforced flanges on both ends
W/extra heavy build ups & extra internal end blocks
Wire reinforced
1” thick black natural rubber tube
Protective packing for hose protection
Flanges
20 Hole
25” BDC
27.5” O.D
1 1/4" thick
1 1/8” Hole size
SUBJECT: Scope of Work/Technical Specifications
Limber Line Discharge Hose (Quantity 10)
1. General Information.
2. Shipping Address.
Plant and Facilities Manager
431 North Shore Drive
PO BOX 397
Fountain City, WI 54629
3. Salient Characteristics.
Hose Specifications
Quantity: 10 each
20” I.D. x 63” long
200 PSI Operating Pressure
Molded in Volcanized Steel Reinforced Flanges on both ends
Wire Reinforced
1” Black Gum Rubber Tube
Flanges
Number of Holes: 24
Bolt Circle Diameter: 27”
O.D. Flange Diameter: 30”
Flange Thickness: 1-1/4”
Diameter of the Bolts: 1-1/8”
| Mar 10, 2025 | [Combined Synopsis/Solicitation (Original)] Dredge Goetz Discharge and Limber Line Hoses |

With GovernmentContracts, you can:
...CONTRACT NUMBER: 9790 CONTRACT: Glenway Backyard Pipe Burst Percentage of Contract Completed: Not... ...
City of Madison
Bid Due: 7/09/2026
...Solicitation Reference #: 2026-MILFAC-01346-RFB Title: Pipe Insulation Services Available Date: 5...
State Government of Wisconsin
Bid Due: 6/10/2026
...includes milling asphalt and concrete pavement, replacing old storm inlets, manholes and lateral ...
City of Kenosha
Bid Due: 6/17/2026
...of approximately 10,000 linear feet of reinforced concrete pipe (RCP) storm sewer in ...
City of Kenosha
Bid Due: 6/17/2026