| Location: | District of Columbia |
|---|---|
| Posted: | Oct 31, 2024 |
| Due: | Dec 4, 2024 |
| Agency: | Metropolitan Washington Airports Authority |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
RFP-24-26450 Concourse C Substation A1B Replacement, IAD
NEW
Description: The Contractor shall replace the existing electrical substation A1B located on the apron level at Concourse C, Washington Dulles International Airport (IAD). Work is multi-phase and includes demolition, provision of temporary power to all active circuits during switch over, testing (as required in various phases) and provision/installation of feeders, switchgear, transformers, wiring, concrete pads, substation enclosures and all required mechanical electrical and other equipment to support the substation replacement.
Solicitation Issue Date: October 31, 2024
Due Date for Submissions: December 4, 2024
Amendments Issued: None
SLBE Requirement: 25%
Additional Information - See in MWAA Contract Lifecycle Management System

With GovernmentContracts, you can: