| Location: | Vermont |
|---|---|
| Posted: | Dec 17, 2025 |
| Due: | Jan 9, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Chittenden Keywords: Construction (Non Building), Paving Contractor, Road Construction Bid Description: BEGINNING AT A POINT ON US ROUTE 7 IN THE TOWN OF MILTON AT THE US ROUTE 7 AND CENTRE DRIVE INTERSECTION (MM 3.655) AND EXTENDING APPROXIMATELY 2056.67 FEET IN A NORTHERLY DIRECTION ALONG US ROUTE 7 ENDING AT MM 4.044. WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES RECONFIGURATION OF AN EXISTING INTERSECTION, REMOVAL OF THE CONCRETE BASE UNDER US ROUTE 7, THE CONSTRUCTION OF TWO NEW ROADWAYS, FULL DEPTH RECONSTRUCTION, TRAFFIC SIGNALS, LIGHTING, LANDSCAPING, AND OTHER HIGHWAY RELATED WORK. ENGINEERS CATEGORY F 12/17/25 - See Addendum #1 at link below.
|
||||||||||||||||||||

With GovernmentContracts, you can:
...), removal of the existing CMPs, and installation of an 18' x 6' ...
State Government of Vermont
Bid Due: 6/19/2026
...INCLUDES THE REMOVAL OF A CONCRETE BOX CULVERT, RELOCATION OF CHANNEL, AND INSTALLATION ...
State Government of Vermont
Bid Due: 6/29/2026
...of the Wheelock Town Office is 1192 VT-122, Lyndonville, VT 05851. The project ...
State Government of Vermont
Bid Due: 6/25/2026
...this project includes the removal of a concrete box culvert, relocation of channel, ...
State of Vermont - Agency of Transportation
Bid Due: 6/19/2026