Rail Spanners
| Location: |
Federal |
| Posted: |
Aug 7, 2026 |
| Due: |
Aug 14, 2026 |
| Agency: |
DEPT OF DEFENSE |
| Type of Government: |
Federal |
| Category: |
|
| Solicitation No: |
W911S226U3919 |
| Publication URL: |
To access bid details, please log in. |
Rail Spanners
Active
Contract Opportunity
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
AMC
Sub Command
ACC
Sub Command 2
MISSION INSTALLATION CONTRACTING COMMAND
Sub Command 3
419TH CSB
Office
W6QM MICC-FT DRUM
Looking for contract opportunity help?
General Information
-
Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
-
Original Published Date: Aug 07, 2026 04:15 pm CDT
-
Original Date Offers Due: Aug 14, 2026 01:00 pm CDT
-
Inactive Policy: Manual
-
Original Inactive Date:
Aug 07, 2027
-
Initiative:
Classification
-
Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
-
Product Service Code: 2240 - LOCOMOTIVE AND RAIL CAR ACCESSORIES AND COMPONENTS
-
NAICS Code:
-
336510 - Railroad Rolling Stock Manufacturing
-
Place of Performance:
Fort Hood
76544
Description
Minimum 72 inch long x 24 inch wide and no more than 4 inch thick. Minimum weight per single spanner 20,000lbs (40,000lbs per pair/axle) total weight minimum of each spanner is 78lbs EA. Rated capacity shall be no more than 50% of failure strength (at least a 2-to-1 safety factor). Failure strength is determined by the amount of weight that causes permanent deformation of the aluminum. Meaning that an 80,000 axle can be placed on a pair of spanners before any permanent deformation of aluminum appears. Minimum structure tubes 3 inch x3 inch and no more than 4 inch x4 inch. Top surface of spanner will be composed of maximum 2 inch wide high-traction rungs. The rungs shall be spaced no more than 4 inch to allow tiedown chains or straps to be routed between the rungs and over the structural tubes also spacing allows for debris to fall through. Must have reinforced kickplate on one side to rest on flat/ unobstructed surface. Minimum 12 inch heavy duty reinforced stub toe on each end: taper to 2 inch blunt end, knife end not acceptable, Each spanner must be etched with part number and capacity.
Attachments/Links
Contact Information
Contracting Office Address
-
MICC FORT DRUM 4205 PO VALLEY RD
-
FORT DRUM , NY 13602-5220
-
USA
Secondary Point of Contact
History
-
Aug 07, 2026 04:15 pm CDTCombined Synopsis/Solicitation (Original)
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...NAVSUP WEAPON SYSTEMS SUPPORT MECH Looking for contract opportunity help? (opens in new ...
DEPT OF DEFENSE
Bid Due: 9/24/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.