| Location: | Washington |
|---|---|
| Posted: | Mar 8, 2026 |
| Due: | Apr 7, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | SW-C2023A |
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes removing a concrete bulkhead, expanding an existing saltwater lagoon, constructing a tidal channel, re-planting salvaged native vegetation around the fringe of the new lagoon. The project also includes removing existing riprap and several trees along the shoreline and streambanks; naturalizing the shoreline by installing large woody debris, bioengineered softshore armoring and a deformable gravel berm; performing work within Twanoh Creek that includes expanding the floodplain, installing clusters of large woody debris within the stream and floodplain, removing and replacing a pedestrian bridge and abutments, and installing bioengineered streambanks.

With GovernmentContracts, you can:
...measures to include riparian and marsh restoration post dam removal, and (3) Sediment ...
Pierce County
Bid Due: 6/24/2026
...control, landscaping, roadside restoration, and other work. Involves 181 items and 183 working ...
State Government of Washington
Bid Due: 7/08/2026
...paving, concrete paving, roundabout construction, stormwater facilities, structures over Yelm Creek... transportation systems ...
State Government of Washington
Bid Due: 6/24/2026
...of University Place. The 65-foot long, 22-foot-wide bridge consists of four concrete-slab spans... ...
Pierce County
Bid Due: 6/13/2026