Project Description: This project includes removing a concrete bulkhead, expanding an existing saltwater lagoon, constructing a tidal channel, re-planting salvaged native vegetation around the fringe of the new lagoon. The project also includes removing existing riprap and several trees along the shoreline and streambanks; naturalizing the shoreline by installing large woody debris, bioengineered softshore armoring and a deformable gravel berm; performing work within Twanoh Creek that includes expanding the floodplain, installing clusters of large woody debris within the stream and floodplain, removing and replacing a pedestrian bridge and abutments, and installing bioengineered streambanks.

With GovernmentContracts, you can:
...site and building improvements associated with an interim fire station and restoration of ...
City of Seattle
Bid Due: 9/30/2026
...System, removal of asphalt pavement, concrete sidewalk, and concrete curb and gutter, construction... ...
City of West Richland
Bid Due: 10/13/2026
...stabilization. I. Construction of outlet works piping including grout encasement and concrete encasement... ...
INTERIOR, DEPARTMENT OF THE