| Location: | Washington |
|---|---|
| Posted: | Mar 8, 2026 |
| Due: | Apr 7, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | SW-C2023A |
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes removing a concrete bulkhead, expanding an existing saltwater lagoon, constructing a tidal channel, re-planting salvaged native vegetation around the fringe of the new lagoon. The project also includes removing existing riprap and several trees along the shoreline and streambanks; naturalizing the shoreline by installing large woody debris, bioengineered softshore armoring and a deformable gravel berm; performing work within Twanoh Creek that includes expanding the floodplain, installing clusters of large woody debris within the stream and floodplain, removing and replacing a pedestrian bridge and abutments, and installing bioengineered streambanks.

With GovernmentContracts, you can:
...roadway (grinding and mixing existing pavement, underlying gravel and subgrade with cement and ...
County of Cowlitz
Bid Due: 6/15/2026
..., remove gravel, grade existing gravel, install owner-provided gate, install masonry columns, install...
City of Sedro Woolley
Bid Due: 6/16/2026
..., the Chambers Creek Dam was built to assist in water withdrawal for ...
Pierce County
Bid Due: 6/24/2026
...lineal feet of curb and gutter, roadway excavation, grading, landscape restoration, gravel...
Whatcom County
Bid Due: 6/16/2026