| Location: | Washington |
|---|---|
| Posted: | Mar 8, 2026 |
| Due: | Apr 7, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | SW-C2023A |
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes removing a concrete bulkhead, expanding an existing saltwater lagoon, constructing a tidal channel, re-planting salvaged native vegetation around the fringe of the new lagoon. The project also includes removing existing riprap and several trees along the shoreline and streambanks; naturalizing the shoreline by installing large woody debris, bioengineered softshore armoring and a deformable gravel berm; performing work within Twanoh Creek that includes expanding the floodplain, installing clusters of large woody debris within the stream and floodplain, removing and replacing a pedestrian bridge and abutments, and installing bioengineered streambanks.

With GovernmentContracts, you can:
...and remove debris as needed. * Contractor to excavate, grade, and install earthen ...
Quinault Indian Nation
Bid Due: 10/08/2026
...collection services for construction debris or similar materials on an as-needed basis. 4.0...
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 7/27/2027
.../ demolition work items for these buildings will require: Hazardous material / debris ...
DEPT OF DEFENSE
Bid Due: 11/13/2026