| Location: | Washington |
|---|---|
| Posted: | Mar 8, 2026 |
| Due: | Apr 7, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | SW-C2023A |
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes removing a concrete bulkhead, expanding an existing saltwater lagoon, constructing a tidal channel, re-planting salvaged native vegetation around the fringe of the new lagoon. The project also includes removing existing riprap and several trees along the shoreline and streambanks; naturalizing the shoreline by installing large woody debris, bioengineered softshore armoring and a deformable gravel berm; performing work within Twanoh Creek that includes expanding the floodplain, installing clusters of large woody debris within the stream and floodplain, removing and replacing a pedestrian bridge and abutments, and installing bioengineered streambanks.

With GovernmentContracts, you can:
...Solicitation Close Date: 07/13/26 Title: Samish River Unit Tree and Shrub Planting Project ...
State Government of Washington
Bid Due: 7/13/2026
...of landowners committing to voluntary new or expanded streamside plantings in the Snoqualmie ...
King Conservation District
Bid Due: 7/02/2026
...trees for the planting season in the Fall and Winter of 2026-2027. The ...
Snohomish Conservation District
Bid Due: 6/17/2026
...sod, install plantings, and install grass seed. * Engineers' estimates range for this ...
City of Sedro Woolley
Bid Due: 6/16/2026