| Location: | Washington |
|---|---|
| Posted: | Mar 8, 2026 |
| Due: | Apr 7, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | SW-C2023A |
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes removing a concrete bulkhead, expanding an existing saltwater lagoon, constructing a tidal channel, re-planting salvaged native vegetation around the fringe of the new lagoon. The project also includes removing existing riprap and several trees along the shoreline and streambanks; naturalizing the shoreline by installing large woody debris, bioengineered softshore armoring and a deformable gravel berm; performing work within Twanoh Creek that includes expanding the floodplain, installing clusters of large woody debris within the stream and floodplain, removing and replacing a pedestrian bridge and abutments, and installing bioengineered streambanks.

With GovernmentContracts, you can:
...Bid Number: PW-0157 Bid Title: SAMMAMISH RIVER & WAYNITA CREEK RESTORATION Category: Request...
City of Bothell
Bid Due: 6/29/2026
...RFP | Fish and Wildlife, On-call River Restoration Engineering/Design Services | Closing Date ...
The Confederated Tribes of the Colville Reservation
Bid Due: 6/26/2026
...measures to include riparian and marsh restoration post dam removal, and (3) Sediment ...
Pierce County
Bid Due: 6/24/2026
...installation, channel reconstruction, channel re-alignment, streambed restoration, roadside... restoration, erosion control, water management ...
State Government of Washington
Bid Due: 7/16/2026