| Location: | Washington |
|---|---|
| Posted: | Mar 8, 2026 |
| Due: | Apr 23, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 93-2023-0048 |
| Publication URL: | To access bid details, please log in. |
Project Description: The construction of all components of the Salmon Creek Treatment Plant UV System Replacement.
Work includes disassembly and modification or demolition of an existing canopy at the UV facility, construction of a concrete channel (Channel 2) parallel to the existing UV disinfection channel (Channel 1), installation of a UV lamp system in Channel 2 while maintaining the existing UV system in service in Channel 1. Once UV Disinfection Channel 2 is fully commissioned, existing UV equipment in Channel 1 will be demolished, and a new UV lamp system will be installed while maintaining operation of Channel 2. Diving is required to accomplish the work. Installation of the modified canopy or provision of a new canopy over the facility as shown on the Drawings will follow. The two channels will be hydraulically connected through pipes upstream and downstream of the UV equipment.
The engineer's estimate for this project is $5.3M.

With GovernmentContracts, you can:
...Solicitation Close Date: 09/28/26 Title: Water and Wastewater Treatment Ref #:WSP-RFQQ-WWT3...
State Government of Washington
Bid Due: 9/28/2026
...Number RFQu 6578-26 Title Baseline PFAS Fate and Transport Study in COS Wastewater ...
City of Spokane
Bid Due: 8/04/2026
...Department of Natural Resources and Parks, Wastewater Treatment Division ("County"). The exact...
King County
Bid Due: 8/24/2026
...Wastewater District Type: RFQ Status: Open Open Date: Jul 23rd 2026, 10:00 AM ...
Sammamish Plateau Water
Bid Due: 8/13/2026