| Location: | California |
|---|---|
| Posted: | May 8, 2025 |
| Due: | Jun 20, 2025 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The District is seeking engineering and design services of a qualified firm to perform feasibility studies to determine the best location, configuration and type of certified full trash capture device(s) for installation to treat each of the seventeen stormwater sub-watersheds, or Trash Management Areas (TMAs) included in the maps in Attachment 1. There is a general preference for large full trash capture devices or multi-benefit treatment designs, but certain compliant treatments for a given TMA may include small full trash capture devices for environmental, technical or logistical reasons.
See RFP # 2885 - 2025 Trash Capture Feasibility Project for full details.

With GovernmentContracts, you can:
...Follow Remedial Investigation (RI) and Optional Feasibility Study (FS) for Per... Initiative: None ...
DEPT OF DEFENSE
Bid Due: 11/30/2026
...FEASIBILITY STUDY OF ANIMAL CONTROL AND SHELTERING SERVICES RELEASED: October 22, 2026 SUBMITTALS..., ...
City of Bellflower
Bid Due: 12/10/2026
...Description Opening Date/Time Closing Date/Time RFP No. PS-2026-03 - Feasibility Study of Animal...:00 ...
City of Bellflower
Bid Due: 12/10/2026
...- Feasibility studies or screening of project ideas 81101526 Professional engineering services - ...
State Government of California
Bid Due: 11/19/2026