| Location: | Missouri |
|---|---|
| Posted: | Aug 27, 2026 |
| Due: | Sep 3, 2026 |
| Agency: | State Government of Missouri |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | T2411-01 |
| Publication URL: | To access bid details, please log in. |
| Project Number | Title | Bid Date/ IFB/ RFQ/Electronic Plans | Bid Addendum(s) | Bid Results/ Awarded Contractor |
|
T2411-01 |
Construct Solar Array
|
9/3/2026 Bid Forms PDF Document Invitation for Bid PDF Document Plans PDF Document Specifications PDF Document |
Addendum #1
PDF Document
Addendum #2 PDF Document |
P M
ROJECT ANUAL
Whiteman AFB Readiness Center
Construct Solar Array
Knob Noster, Missouri
Designed By: Clark & Enersen
2020 Baltimore Ave. Suite 300
Kansas City, Mo.
Date Issued: July 10, 2026
Project No.: T2411-01
S M
TATE of ISSOURI
_________________________________________
O A
FFICE of DMINISTRATION
Facilities Management, Design and Construction
______________________________________________
SECTION 00100 - INVITATION FOR BID 1
3/05
SECTION 000107 - PROFESSIONAL SEALS AND CERTIFICATIONS
PROJECT NUMBER: (T2411-01 "Whiteman AFB Readiness Center - Construct Solar Array")
THE FOLLOWING DESIGN PROFESSIONALS HAVE SIGNED AND SEALED THE ORIGINAL
PLANS AND SPECIFICATIONS FOR THIS PROJECT, WHICH ARE ON FILE WITH THE
DIVISION OF FACILITIES MANAGEMENT, DESIGN AND CONSTRUCTION:
TABLE OF CONTENTS
SECTION TITLE NUMBER OF PAGES
DIVISION 00 - PROCUREMENT AND CONTRACTING INFORMATION
000000 INTRODUCTORY INFORMATION
000101 Project Manual Cover 1
000107 Professional Seals and Certifications 1
000110 Table of Contents 2
000115 List of Drawings 1
001116 INVITATION FOR BID (IFB) 1
002113 INSTRUCTIONS TO BIDDERS 7
NOTICE TO BIDDERS
The following procurement forms can be found on our website at:
https://oa.mo.gov/facilities/bid-opportunities/bid-listing-electronic-plans
and shall be submitted with your bid to FMDCBids@oa.mo.gov
004000 PROCUREMENT FORMS & SUPPLEMENTS
004113 Bid Form *
004337 MBE/WBE/SDVE Compliance Evaluation Form *
004338 MBE/WBE/SDVE Eligibility Determination *
Form for Joint Ventures
004339 MBE/WBE/SDVE Good Faith Effort (GFE) *
Determination Forms
004340 SDVE Business Form *
004541 Affidavit of Work Authorization *
004545 Anti-Discrimination Against Israel Act Certification form *
005000 CONTRACTING FORMS AND SUPPLEMENTS
005213 Construction Contract 3
006000 PROJECT FORMS
006113 Performance and Payment Bond 2
006325 Product Substitution Request 2
006519.16 Final Receipt of Payment and Release Form 1
006519.18 MBE/WBE/SDVE Progress Report 2
006519.21 Affidavit of Compliance with Prevailing Wage Law 1
007000 CONDITIONS OF THE CONTRACT
007213 General Conditions 20
007300 Supplementary Conditions 1
007333 Supplementary General conditions for Federally Funded/Assisted Construction Projects 11
007346 Wage Rate 4
DIVISION 1 - GENERAL REQUIREMENTS
011000 Summary of Work 2
012100 Allowances 3
012300 Alternates 1
012600 Contract Modification Procedures 2
013100 Coordination 4
013115 Project Management Communications 4
013200 Schedule - Bar Chart 4
SECTION 000110 - TABLE OF CONTENTS 1
03/2026
013300 Submittals 5
013513.28 Site Security and Health Requirements (MONG) 6
017400 Cleaning 3
DIVISION 2 - EXISTING CONDITIONS
024119 Selective Demolition 6
DIVISION 26 - ELECTRICAL
260500 Electrical General Provisions 7
260501 Basic Materials and Methods 8
260519 Conductors 5
260526 Grounding System 4
260533 Raceways 6
262416 Panelboards 4
263100 Photovoltaic Collectors 7
DIVISION 31 - EARTHWORK
311000 Site Clearing 4
312000 Earth Moving 12
312219 Site Grading 3
312500 Erosion and Sediment Control Systems 4
DIVISION 32 - EXTERIOR IMPROVEMENTS
321313 Concrete Paving 3
329200 Turf & Grasses 8
329400 Rock Mulch 2
SECTION 000110 - TABLE OF CONTENTS 2
03/2026
SECTION 000115 - LIST OF DRAWINGS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract including General and Supplementary
Conditions, Bid Form, and other Division 1 Specification Sections apply to this Section.
1.2 SUMMARY
A. This Section provides a comprehensive list of the drawings that comprise the Bid
Documents for this project.
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION
3.1 LIST OF DRAWINGS
A. The following list of drawings is a part of the Bid Documents:
TITLE SHEET # DATE CAD #
1. Title Sheet Sheet G-000 07/10/26 G-COV-000
2. General Notes, Symbols & Sheet G-001 07/10/26 G-IND-001
Abbreviations and Drawings
Index
3. Existing Conditions/ Site Sheet L-101 07/10/26 L-SIT-101
Demolition Plan
4. Site Layout Plan, Site Grading/ Sheet L-201 07/10/26 L-SIT-201
Planting Plan and Site Details
5. Electrical Abbreviations, Sheet E-000 07/10/26 E-GEN-000
Symbols Legend & General
Notes
Sheet E-001 07/10/26 E-SIT-001
6. Electrical Site Plan
7. Electrical Details & Schedules Sheet E-201 07/10/26 E-DTL-201
8. Electrical One Line Diagram Sheet E-301 07/10/26 E-CEL-301
9. Electrical One Line Diagram - Sheet E-302 07/10/26 E-CEL-302
Photovoltaic Base
10. Electrical One Line Diagram- Sheet E-303 07/10/26 E-CEL-303
Photovoltaic Alternate
11. Electrical Details Sheet E-401 07/10/26 E-CEL-401
END OF SECTION 000115
LIST OF DRAWINGS 000115 - 1
SECTION 001116 - INVITATION FOR BID
1.0 OWNER:
A. The State of Missouri
Office of Administration,
Division of Facilities Management, Design and Construction
Jefferson City, Missouri
2.0 PROJECT TITLE AND NUMBER:
A. Whiteman AFB Readiness Center
Construct Solar Array
Knob Noster, Missouri
Project No.: T2411-01
3.0 BIDS WILL BE RECEIVED:
A. Until: 1:30 PM, September 3, 2026
B. Only electronic bids sent to FMDCBids@oa.mo.gov shall be accepted: (See Instructions to Bidders for further detail)
4.0 DESCRIPTION:
A. Scope: The project includes construction of a 60kw solar array and two EV charging stations.
B. MBE/WBE/SDVE Goals: MBE 0%, WBE 0%, and SDVE 3%. NOTE: Only MBE/WBE firms certified by the State of Missouri
Office of Equal Opportunity as of the date of bid opening, or SDVE(s) meeting the requirements of Section 34.074, RSMo and 1
CSR 30-5.010, can be used to satisfy the MBE/WBE/SDVE participation goals for this project.
5.0 PRE-BID MEETING:
A. Place/Time: 10:30 AM, August 20, 2026, at One Attack Ave. Knob Knoster, Mo. 68336
B. Access to State of Missouri property requires presentation of a photo ID by all persons.
6.0 HOW TO GET PLANS & SPECIFICATIONS:
A. View Only Electronic bid sets are available at no cost or paper bid sets for a deposit of $30.00 from American Document Solutions (ADS).
MAKE CHECKS PAYABLE TO: American Document Solutions. Mail to: American Document Solutions, 1400 Forum Blvd., Suite 7A,
Columbia, Missouri 65203. Phone 573-446-7768, Fax 573-355-5433, https://www.adsplanroom.net. NOTE: Prime contractors will be
allowed a maximum of two bid sets at the deposit rate shown above. Other requesters will be allowed only one bid set at this rate.
Additional bid sets or parts thereof may be obtained by any bidder at the cost of printing and shipping by request to American Document
Solutions at the address shown above. Bidder must secure at least one bid set to become a planholder.
B. Refunds: Return plans and specifications in unmarked condition within 15 working days of bid opening to American Document
Solutions, 1400 Forum Blvd., Suite 7A, Columbia, Missouri 65203. Phone 573-446-7768, Fax 573-355-5433. Deposits for plans not
returned within 15 working days shall be forfeited.
C. Information for upcoming bids, including downloadable plans, specifications, Invitation for Bid, bid tabulation, award, addenda, and
access to the ADS planholders list, is available on the Division of Facilities Management, Design and Construction's web site:
https://oa.mo.gov/facilities/bid-opportunities/bid-listing-electronic-plans.
7.0 POINT OF CONTACT:
A. Project Manager: Bill Edwards Missouri National Guard, email: billy.j.edwards66.nfg@army.mil
8.0 GENERAL INFORMATION:
A. The State reserves the right to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn for a period of 20
working days subsequent to the specified bid opening time. The contractor shall pay not less than the prevailing hourly rate of wages for
work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial
Relations and as set out in the detailed plans and specifications.
B. Bid results will be available at https://oa.mo.gov/facilities/bid-opportunities/bid-listing-electronic-plans after it is verified that at least one
bid is awardable and affordable.
C. This is a federally funded/assisted construction project that requires compliance by the awarded contractor with applicable federal laws and
regulations. The Bidder should review Section 007333, SUPPLEMENTARY GENERAL CONDITIONS FOR FEDERALLY
FUNDED/ASSISTED CONSTRUCTION PROJECTS, which is mage part of this solicitation and will be made part of the resulting
contract by reference.
SECTION 001116 - INVITATION FOR BID 1
01/2025
SECTION 002113 - INSTRUCTIONS TO BIDDERS
1.0 - SPECIAL NOTICE TO BIDDERS
A. If awarded a contract, the Bidder's employees, and the employees of all subcontractors, who perform
the work on the project must adhere to requirements in Section 013513 - Site Security and Health
Requirements as applicable per Agency.
B. The Bidder's prices shall include all city, state, and federal sales, excise, and similar taxes that may
lawfully be assessed in connection with the performance of work, and the purchased of materials to be
incorporated in the work. THIS PROJECT IS NOT TAX EXEMPT.
2.0 - BID DOCUMENTS
A. The number of sets obtainable by one (1) party may be limited in accordance with available supply.
B. For the convenience of contractors, subcontractors and suppliers, bidding documents are available on
the Owner's website at https://oa.mo.gov/facilities/bid-opportunities/bid-listing-electronic-plans.
3.0 - BIDDERS' OBLIGATIONS
A. Bidders must carefully examine the entire site of the work and shall make all reasonable and necessary
investigations to inform themselves thoroughly as to the facilities available as well as to all the
difficulties involved in the completion of all work in accordance with the specifications and the plans.
Bidders are required to examine all maps, plans and data mentioned in the specifications. No plea of
ignorance concerning observable existing conditions or difficulties that may be encountered in the
execution of the work under this contract will be accepted as an excuse for any failure or omission on
the part of the successful Bidder (contractor) to fulfill every detail of the requirements of the contract,
nor accepted as a basis for any claims for extra compensation or time extension.
B. Under no circumstances will Bidders give their plans and specifications to other Bidders. It is highly
encouraged, but not required, that all Bidders be on the official planholders list to receive project updates
including but not limited to any addenda that are issued during the bidding process.
4.0 - INTERPRETATIONS
A. No Bidder shall be entitled to rely on oral or written representations from any person as to the meaning
of the plans and specifications or the acceptability of alternate products, materials, form or type of
construction.
B. Bidders shall make all requests for interpretations in writing and submit all requests to the Project
Manager identified in Section 007300 - Supplementary Conditions with all necessary supporting
documentation no less than five (5) working days before opening of bids. Responses to requests for
interpretation will be issued via a written addendum and will be sent as promptly as is practicable to all
official planholders and posted on the Owner's website. All such addenda shall become part of the bid
and contract documents.
C. Bidders shall make all requests for an "Acceptable Substitution" on the Section 006325 Substitution
Request Form. The request shall be emailed to the Project Manager identified in Section 007300 -
Supplementary Conditions no less than five (5) working days before opening of bids. Responses to
requests for substitutions will be issued via a written addendum and will be sent as promptly as is
practicable to all official planholders and posted on the Owner's website. All such addenda shall become
part of the bid and contract documents.
D. An "Acceptable Substitution" requested after the award of bid will only be approved if proven to the
satisfaction of the Owner and the Designer that the product is acceptable in design, strength, durability,
usefulness, and convenience for the purpose intended. Approval of the substitution after award is at the
sole discretion of the Owner and all requests of this nature must be submitted in accordance with Article
3.1 of the General Conditions.
SECTION 002113 - INSTRUCTIONS TO BIDDERS Page 1 of 7
7/23/2026
5.0 - BIDS AND BIDDING PROCEDURE
A. Bidders shall submit all submission forms and accompanying documents listed in Section 004113 - Bid
Form, Article 5.0, Attachments to Bid by the stated time on the bid documents or the bid will be rejected
for being non-responsive.
B. Depending on the specific project requirements, the following is a GENERIC list of all possible bid
forms that may be due with bid submittals. Bidders must verify each specific project's requirements in
Section 004113 to ensure they have provided all the required documentation with their submission.
Bid Submittal - due before stated date and time of bid opening (see IFB):
004113 Bid Form (all pages are always required)
004322 Unit Prices Form
004336 Proposed Subcontractors Form
004337 MBE/WBE/SDVE Compliance Evaluation Form
004338 MBE/WBE/SDVE Eligibility Determination for Joint Ventures
004339 MBE/WBE/SDVE GFE Determination
004340 SDVE Business Form
004541 Affidavit of Work Authorization
004545 Anti-Discrimination Against Israel Act Certification form
C. The Bidder shall submit its bid on the forms provided by the Owner in the same file format (PDF) with
each space fully and properly completed, typewritten or legibly printed, including all amounts required
for alternate bids, unit prices, cost accounting data, etc. The Owner will reject bids that are not on the
Owner's forms and that do not contain all requested information. All forms can be found on the Owner's
website at https://oa.mo.gov/facilities/bid-opportunities/bid-listing-electronic-plans and shall be
submitted to FMDCBids@oa.mo.gov.
D. All bids shall be submitted without additional terms and conditions, modifications, or reservations. The
completed forms shall not include interlineations, alterations, or erasures. Bids not in compliance with
the requirements of this paragraph will be rejected as non-responsive.
E. All bids shall be accompanied by a bid bond executed by the bidder and a duly authorized surety
company, certified check, cashier's check or bank draft made payable to the Division of Facilities
Management, Design and Construction, State of Missouri, in the amount indicated in the bid documents
in Section 004113. Failure of the Bidder to submit the duly authorized bid bond or the full amount
required shall be sufficient cause to reject his bid. The Bidder agrees that the proceeds of the check,
draft, or bond shall become the property of the State of Missouri, if for any reason the Bidder withdraws
his bid after bid closing or if the Bidder, within ten (10) working days after notification of award, refuses
or is unable to 1) execute the tendered contract, 2) provide an acceptable performance and payment
bond, or 3) provide evidence of required insurance coverage.
F. The bid bond check or draft submitted by the successful Bidder will be returned after the receipt of an
acceptable performance and payment bond and execution of the formal contract. Checks or drafts of
all other Bidders will be returned within a reasonable time after it is determined that the bid represented
by same will receive no further consideration by the State of Missouri.
6.0 - SIGNING OF BIDS
A. A bid shall contain the full and correct legal name of the Bidder. If the Bidder is an entity registered
with the Missouri Secretary of State, the Bidder's name on the bid form shall appear as shown in the
Secretary of State's records. If the Bidder is an entity organized in a state other than Missouri, the
Bidder must provide a Certificate of Authority to do business in the State of Missouri.
B. If the successful Bidder is doing business in the State of Missouri under a fictitious name, the Bidder
shall furnish to Owner, attached to the Bid Form, a properly certified copy of the certificate of
Registration of Fictitious Name from the State of Missouri, and such certificate shall remain on file
with the Owner.
C. A bid from an individual shall be signed as noted on the Bid Form.
D. A bid from a partnership or joint venture shall require only one signature of a partner, an officer of the
joint venture authorized to bind the venture, or an attorney-in-fact. If the bid is signed by an officer of
SECTION 002113 - INSTRUCTIONS TO BIDDERS Page 2 of 7
7/23/2026
a joint venture or an attorney-in-fact, a document evidencing the individual's authority to execute
contracts should be included with the bid form.
E. A bid from a limited liability company (LLC) shall be signed by a manager or a managing member of
the LLC.
F. A bid from a corporation shall have the correct corporate name thereon and the signature of an
authorized officer of the corporation. Title of office held by the person signing for the corporation shall
appear, along with typed name of said individual and the corporate license number shall be provided.
In addition, for corporate proposals, the President or Vice-President listed per the current filing with
the Missouri Secretary of State should sign as the Bidder. If the signatory is other than the corporate
president or vice president, the bidder must provide satisfactory evidence that the signatory has the legal
authority to bind the corporation.
7.0 - RECEIVING BID SUBMITTALS
A. It is the Bidder's sole responsibility to ensure receipt of the bid submittals by Owner on or before the
date and time specified in the Invitation for Bid or as modified via written addenda. Bids received after
the date and time specified will not be considered by the Owner.
B. All bids shall be received via email at FMDCBids@oa.mo.gov. A bid submitted through any other
means, including hard copies, will not be considered and will be discarded by the Owner unopened.
8.0 - MODIFICATION AND WITHDRAWAL OF BIDS
A. Bidder may withdraw a bid at any time prior to the scheduled closing time for receipt of bids, but no
bidder may withdraw his bid for a period of twenty (20) working days after the scheduled closing time
for receipt of bids.
B. Bidder may modify a bid until the scheduled closing time by sending a revised bid to
FMDCBids@oa.mo.gov with a note in the subject line and body of the email that it is a revised bid. A
revised bid sent via any other method will not be considered.
9.0 - AWARD OF CONTRACT
A. The Owner reserves the right to reject any and/or all bids and further to waive all informalities in
bidding when deemed in the best interest of the State of Missouri.
B. The Owner reserves the right to let other contracts in connection with the work including, but not
limited to, contracts for the furnishing and installation of furniture, equipment, machinery, appliances
and other apparatuses.
C. The Owner will award a contract to the lowest, responsive, and responsible Bidder in accordance with
Section 8.250, RSMo. No contract will be awarded to any Bidder who has had a contract with the
Owner terminated within the preceding twelve months for material breach of contract or who has been
suspended or debarred by the Owner.
D. Award of alternates, if any, will be made in numerical order unless all bids received are such that the
order of acceptance of alternates does not affect the determination of the lowest, responsive, responsible
bidder.
E. No award shall be considered binding upon the Owner until the written contract has been properly
executed and the following documentation has been provided: 1) performance and payment bond
consistent with Article 6.1 of the General Conditions; 2) proof of the required insurance coverage; 3)
an executed Section 004541 - Affidavit of Work Authorization form; and 4) documentation evidence
enrollment and participation in a federal work authorization program.
F. Failure to execute and return the contract and associated documents within the prescribed period shall
be treated, at the option of the Owner, as a breach of Bidder's obligation and the Owner shall be under
no further obligation to Bidder.
G. Transient employers subject to Sections 285.230 and 285.234, RSMo, (out-of-state employers who
temporarily transact any business in the State of Missouri) may be required to file a bond with the
Missouri Department of Revenue. No contract will be awarded by the Owner unless the successful
Bidder certifies that he has complied with all applicable provisions of Section 285.230-234.
SECTION 002113 - INSTRUCTIONS TO BIDDERS Page 3 of 7
7/23/2026
H. Sections 285.525 and 285.530, RSMo, require business entities to enroll and participate in a federal
work authorization program in order to be eligible to receive award of any state contract in excess of
$5,000. Bidders should submit with their bid an Affidavit of Work Authorization (Section 004541)
along with appropriate documentation evidencing such enrollment and participation. Bidders must also
submit an E-Verify Memorandum before the Owner may award a contract to the Bidder. Information
regarding E-Verify is located at https://www.e-verify.gov/employers/enrolling-in-e-verify. The
contractor shall be responsible for ensuring that all subcontractors and suppliers associated with this
contract enroll in E-Verify.
I. The successful Bidder must be registered in MissouriBUYS powered by MOVERS at
https://missouribuys.mo.gov/supplier-registration# as an approved vendor prior to being issued a
contract.
10.0 - CONTRACT SECURITY
A. The successful Bidder shall furnish a performance/payment bond as set forth in General Conditions
Article 6.1 prior to the State executing the contract and issuing a notice to proceed.
11.0 - WORKING DAYS
A. Contract duration time is stated in working days and will use the following definition in determining the
actual calendar date for contract completion:
1. Working days are defined as all calendar days except Saturdays, Sundays and the following State of
Missouri observed holidays: New Year's Day, Martin Luther King, Jr. Day, Lincoln Day,
Washington's Birthday, Truman Day, Memorial Day, Juneteenth, Independence Day, Labor Day,
Columbus Day, Veterans Day, Thanksgiving Day and Christmas Day.
12.0 - AMERICAN AND MISSOURI - MADE PRODUCTS AND FIRMS
A. By signing the bid form and submitting a bid on this project, the Bidder certifies that it will use
American and Missouri products as set forth in Article 1.7 of the General Conditions. Bidders are
advised to review those requirements carefully prior to bidding.
B. A preference shall be given to Missouri firms, corporations or individuals, or firms, corporations or
individuals that maintain Missouri offices or places of business, when the quality of performance
promised is equal or better and the price quoted is the same or less.
C. Pursuant to Section 34.076, RSMo, a contractor or Bidder domiciled outside the boundaries of the State
of Missouri shall be required, in order to be successful, to submit a bid the same percent less than the
lowest bid submitted by a responsible contractor or Bidder domiciled in Missouri as would be required
for such a Missouri domiciled contractor or Bidder to succeed over the bidding contractor or Bidder
domiciled outside Missouri on a like contract or bid being let in the Bidder's domiciliary state and,
further, the contractor or Bidder domiciled outside the boundaries of Missouri shall be required to
submit an audited financial statement as would be required of a Missouri domiciled contractor or Bidder
on a like contract or bid being let in the domiciliary state of that contractor or Bidder.
13.0 - ANTI-DISCRIMINATION AGAINST ISRAEL ACT CERTIFICATION:
A. If the Bidder meets the section 34.600, RSMo., definition of a "company" and the Bidder has ten or
more employees, the Bidder must certify in writing that the Bidder is not currently engaged in a boycott
of goods or services from the State of Israel and shall not engage in a boycott of goods or services from
the State of Israel, if awarded a contract, for the duration of the contract. The Bidder is required to
complete and submit the applicable portion of Section 004545 - Anti-Discrimination Against Israel Act
Certification with its Bid Form. The applicable portion of the exhibit must be submitted prior to
execution of a contract by the Owner and issuance of Notice to Proceed.
14.0 - MBE/WBE/SDVE INSTRUCTIONS
A. Definitions:
1. "MBE" means a Minority Business Enterprise.
2. "MINORITY" has the same meaning as set forth in 1 C.S.R. 10-17.010.
SECTION 002113 - INSTRUCTIONS TO BIDDERS Page 4 of 7
7/23/2026

With GovernmentContracts, you can:
Follow Notice of Intent for Sole Source Award to Air Cleaning Technologies Inc.
DEPT OF DEFENSE
Bid Due: 9/08/2026
Follow Z--Gateway Arch NP - Sidewalk Leveling Active Contract Opportunity Notice ID 140P6226Q0005
INTERIOR, DEPARTMENT OF THE
Bid Due: 9/09/2026
Follow F/A-18E/F Infrared Search and Track (IRST) FPU-13/A Fuel Tank Assembly (FTA) Technical
DEPT OF DEFENSE
Bid Due: 9/15/2026
Follow Excitation System Replacement, Table Rock Dam, White River Basin, Taney County Missouri
DEPT OF DEFENSE
Bid Due: 9/18/2026