Water Supply System

Location: Missouri
Posted: Oct 16, 2026
Due: Oct 22, 2026
Agency: State Government of Missouri
Type of Government: State & Local
Category:
  • 45 - Plumbing, Heating, and Sanitation Equipment
Solicitation No: X2409-01
Publication URL: To access bid details, please log in.
Project Number Title Bid Date/ IFB/ RFQ/Electronic Plans Bid Addendum(s) Bid Results/ Awarded Contractor

X2409-01

Water Supply System

Bryant Creek State Park

Ava


10/22/2026

Bid Forms PDF Document
Invitation for Bid PDF Document
Plans PDF Document
Specifications PDF Document

Planholders List

Addendum #1 PDF Document
Addendum #2 PDF Document

Attachment Preview

P M
ROJECT ANUAL
Water Supply System
Bryant Creek State Park
Ava, Missouri
Designed By: HDR Engineering, Inc.
187 E. David St.
Forsyth, MO, 65653
Date Issued: March 10, 2026
Project No.: X2409-01
S M
TATE of ISSOURI
_________________________________________
O A
FFICE of DMINISTRATION
Facilities Management, Design and Construction
______________________________________________
SECTION 00100 - INVITATION FOR BID 1
3/05

00 01 07
SEALS AND SIGNATURES
Owner Name: Missouri Office of Administration
Facility or Site Name: Bryant Creek State Park
Project Name: Water Supply System
Project or Contract Designation: 10440837
Engineer: HDR Engineering, Inc. MO Certificate of Authority #000856
Travis Heier, PE
License No. 2008002163
Engineer's seal and signature does not apply to the documents that comprise Division 00, Bidding and
Contracting Requirements.
It is a violation of applicable laws and regulations governing professional licensing and registration for any
person, unless acting under the direction of the licensed and registered design professional(s) indicated
above, to alter in any way the Specifications in this project manual.
END OF SEALS AND SIGNATURES
HDR Project No. 10440837 Missouri Office of Administration March 10, 2026
Water Supply System, Bryant Creek State Park, 1204 Private Dr., Ava, Missouri 65608 Bid Specifications
SEALS AND SIGNATURES
00 01 07 -1

TABLE OF CONTENTS
SECTION TITLE NUMBER OF PAGES
DIVISION 00 - PROCUREMENT AND CONTRACTING INFORMATION
000000 INTRODUCTORY INFORMATION
000101 Project Manual Cover 1
000107 Professional Seals and Certifications 1
000110 Table of Contents 2
000115 List of Drawings 1
001116 INVITATION FOR BID (IFB) 1
002113 INSTRUCTIONS TO BIDDERS 7
NOTICE TO BIDDERS
The following procurement forms can be found on our website at:
https://oa.mo.gov/facilities/bid-opportunities/bid-listing-electronic-plans
and shall be submitted with your bid to FMDCBids@oa.mo.gov
004000 PROCUREMENT FORMS & SUPPLEMENTS
004113 Bid Form *
004322 Unit Prices Form *
004337 MBE/WBE/SDVE/HDVE Compliance Evaluation Form *
004338 MBE/WBE/SDVE/HDVE Eligibility Determination *
Form for Joint Ventures
004339 MBE/WBE/SDVE/HDVE Good Faith Effort (GFE) *
Determination Forms
004340 SDVE Business Form
004340.1 HDVE Business Form *
004541 Affidavit of Work Authorization *
004545 Anti-Discrimination Against Israel Act Certification form *
005000 CONTRACTING FORMS AND SUPPLEMENTS
005213 Construction Contract 3
006000 PROJECT FORMS
006113 Performance and Payment Bond 2
006325 Product Substitution Request 2
006519.16 Final Receipt of Payment and Release Form 1
006519.18 MBE/WBE/SDVE/HDVE Progress Report 2
006519.21 Affidavit of Compliance with Prevailing Wage Law 1
007000 CONDITIONS OF THE CONTRACT
007213 General Conditions 20
007300 Supplementary Conditions 1
007346 Wage Rate 4
DIVISION 01 - GENERAL REQUIREMENTS
011000 Summary of Work 2
012100 Allowances 3
012200 Unit Prices 2
012300 Alternates 2
012600 Contract Modification Procedures 2
013100 Coordination 4
013115 Project Management Communications 4
SECTION 000110 - TABLE OF CONTENTS 1

013200 Schedule - Bar Chart 4
013300 Submittals 5
013513.28 Site Security and Health Requirements (DNR) 5
015000 Construction Facilities and Temporary Controls 8
017400 Cleaning 3
017900 Demonstration and Training 6
TECHNICAL SPECIFICATIONS INDEX:
DIVISION 3 - CONCRETE
03 05 05 Concrete Testing and Inspection 7
03 11 13 Formwork 5
03 15 19 Anchorage to Concrete 8
03 21 00 Reinforcement 5
03 31 30 Concrete Materials and Proportioning 12
03 31 31 Concrete Mixing, Placing, Jointing, and Curing 15
03 35 00 Concrete Finishing and Repair of Surface Defects 10
DIVISION 6 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 Rough Carpentry 5
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
07 21 00 Building Insulation 6
07 26 00 Under Slab Vapor Retarder 2
DIVISION 8 - OPENINGS
08 11 00 Hollow Metal Doors and Frames 4
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 92 00 Seeding, Sodding, and Landscaping 5
DIVISION 33 - UTILITIES
33 05 31.16 PVC Pressure Pipe for Water Transmission and Distribution 6
33 11 13 Potable Water Supply Wells 7
33 14 11 Water Utility Transmission and Distribution Piping 18
33 16 23 Hydropneumatic Water Storage Tanks 6
DIVISION 40 - PROCESS INTERCONNECTIONS
40 05 31 Pipe - Plastic 3
40 05 52 Miscellaneous Valves 4
40 05 61 Gate Valves 3
40 05 66 Check Valves 5
DIVISION 46 - WATER AND WASTEWATER EQUIPMENT
46 33 11 Chemical Feed - Liquid Systems 4
APPENDIX
1. DNR Permits 34
SECTION 000110 - TABLE OF CONTENTS 2

SECTION 000115 -LIST OF DRAWINGS
PART I-GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract including General and Supplementary
Conditions, Bid Form, and other Division 1 Specification Sections apply to this Section.
1.2 SUMMARY
A. This Section provides a comprehensive list of the drawings that comprise the Bid
Documents for this project.
PART 2-PRODUCTS (NOT APPLICABLE)
PART 3 -EXECUTION
3.1 LIST OF DRAWINGS
A. The following list of drawings is a part of the Bid Documents:
TITLE SHEET# DATE
1. Cover Sheet Sheet G-001 03/10/26
2. Sheet Index and Overall Site Plan Sheet C-100 03/10/26
3. Site 01 Water Supply Plan View Base Bid Sheet C-101 03/10/26
4. Site 02 Water Supply Plan View BidA lternates Sheet C-102 03/10/26
5. Details Sheet C-501 03/10/26
6. Details Sheet C-502 03/10/26
7. Well Details Sheet C-503 03/10/26
Well House Plan View SheetA-101 03/10/26
8.
END OF SECTION 000115
LIST OF DRAWINGS 000115 -1

SECTION 001116 - INVITATION FOR BID
1.0 OWNER:
A. The State of Missouri
Office of Administration,
Division of Facilities Management, Design and Construction
Jefferson City, Missouri
2.0 PROJECT TITLE AND NUMBER:
A. Water Supply System
Bryant Creek State Park
Ava, Missouri
Project No.: X2409-01
3.0 BIDS WILL BE RECEIVED:
A. Until: 1:30 PM, October 22, 2026
B. Only electronic bids sent to FMDCBids@oa.mo.gov shall be accepted: (See Instructions to Bidders for further detail)
4.0 DESCRIPTION:
A. Scope: The project includes new water systems for the North and South Day Use Areas including potable wells, well houses, pressure
tanks, chlorination systems, piping, yard hydrants, and appurtenances.
B. MBE/WBE/SDVE Goals: MBE 0%, WBE 0%, SDVE 3%, or HDVE 3%. NOTE: Only MBE/WBE firms certified by the State of
Missouri Office of Equal Opportunity as of the date of bid opening, or SDVE(s)/HDVE(s)meeting the requirements of Section
34.069, RSMo, Section 34.074, RSMo and 1 CSR 30-5.010, can be used to satisfy the MBE/WBE/SDVE/HDVE participation goals
for this project.
5.0 PRE-BID MEETING:
A. Place/Time: 10 AM, October, 8, 2026, at at 4297 Co Rd 142, Rockbridge, MO 65741. The meeting location is approximately 4 miles from
the Park.
B. Access to State of Missouri property requires presentation of a photo ID by all persons.
6.0 HOW TO GET PLANS & SPECIFICATIONS:
A. View Only Electronic bid sets are available at no cost or paper bid sets for a deposit of $100.00 from American Document Solutions
(ADS). MAKE CHECKS PAYABLE TO: American Document Solutions. Mail to: American Document Solutions, 1400 Forum Blvd.,
Suite 7A, Columbia, Missouri 65203. Phone 573-446-7768, Fax 573-355-5433, https://www.adsplanroom.net. NOTE: Prime contractors
will be allowed a maximum of two bid sets at the deposit rate shown above. Other requesters will be allowed only one bid set at this rate.
Additional bid sets or parts thereof may be obtained by any bidder at the cost of printing and shipping by request to American Document
Solutions at the address shown above. Bidder must secure at least one bid set to become a planholder.
B. Refunds: Return plans and specifications in unmarked condition within 15 working days of bid opening to American Document
Solutions, 1400 Forum Blvd., Suite 7A, Columbia, Missouri 65203. Phone 573-446-7768, Fax 573-355-5433. Deposits for plans not
returned within 15 working days shall be forfeited.
C. Information for upcoming bids, including downloadable plans, specifications, Invitation for Bid, bid tabulation, award, addenda, and
access to the ADS planholders list, is available on the Division of Facilities Management, Design and Construction's web site:
https://oa.mo.gov/facilities/bid-opportunities/bid-listing-electronic-plans.
7.0 POINT OF CONTACT:
A. Project Manager: Nathan Graessle, email: nathaniel.graessle@oa.mo.gov
8.0 GENERAL INFORMATION:
A. The State reserves the right to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn for a period of 20
working days subsequent to the specified bid opening time. The contractor shall pay not less than the prevailing hourly rate of wages for
work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial
Relations and as set out in the detailed plans and specifications.
B. Bid results will be available at https://oa.mo.gov/facilities/bid-opportunities/bid-listing-electronic-plans after it is verified that at least one
bid is awardable and affordable.
SECTION 001116 - INVITATION FOR BID 1

SECTION 002113 - INSTRUCTIONS TO BIDDERS
1.0 - SPECIAL NOTICE TO BIDDERS
A. If awarded a contract, the Bidder's employees, and the employees of all subcontractors, who perform
the work on the project must adhere to requirements in Section 013513 - Site Security and Health
Requirements as applicable per Agency.
B. The Bidder's prices shall include all city, state, and federal sales, excise, and similar taxes that may
lawfully be assessed in connection with the performance of work, and the purchased of materials to be
incorporated in the work. THIS PROJECT IS NOT TAX EXEMPT.
2.0 - BID DOCUMENTS
A. The number of sets obtainable by one (1) party may be limited in accordance with available supply.
B. For the convenience of contractors, subcontractors and suppliers, bidding documents are available on
the Owner's website at https://oa.mo.gov/facilities/bid-opportunities/bid-listing-electronic-plans.
3.0 - BIDDERS' OBLIGATIONS
A. Bidders must carefully examine the entire site of the work and shall make all reasonable and necessary
investigations to inform themselves thoroughly as to the facilities available as well as to all the
difficulties involved in the completion of all work in accordance with the specifications and the plans.
Bidders are required to examine all maps, plans and data mentioned in the specifications. No plea of
ignorance concerning observable existing conditions or difficulties that may be encountered in the
execution of the work under this contract will be accepted as an excuse for any failure or omission on
the part of the successful Bidder (contractor) to fulfill every detail of the requirements of the contract,
nor accepted as a basis for any claims for extra compensation or time extension.
B. Under no circumstances will Bidders give their plans and specifications to other Bidders. It is highly
encouraged, but not required, that all Bidders be on the official planholders list to receive project updates
including but not limited to any addenda that are issued during the bidding process.
4.0 - INTERPRETATIONS
A. No Bidder shall be entitled to rely on oral or written representations from any person as to the meaning
of the plans and specifications or the acceptability of alternate products, materials, form or type of
construction.
B. Bidders shall make all requests for interpretations in writing and submit all requests to the Project
Manager identified in Section 007300 - Supplementary Conditions with all necessary supporting
documentation no less than five (5) working days before opening of bids. Responses to requests for
interpretation will be issued via a written addendum and will be sent as promptly as is practicable to all
official planholders and posted on the Owner's website. All such addenda shall become part of the bid
and contract documents.
C. Bidders shall make all requests for an "Acceptable Substitution" on the Section 006325 Substitution
Request Form. The request shall be emailed to the Project Manager identified in Section 007300 -
Supplementary Conditions no less than five (5) working days before opening of bids. Responses to
requests for substitutions will be issued via a written addendum and will be sent as promptly as is
practicable to all official planholders and posted on the Owner's website. All such addenda shall become
part of the bid and contract documents.
D. An "Acceptable Substitution" requested after the award of bid will only be approved if proven to the
satisfaction of the Owner and the Designer that the product is acceptable in design, strength, durability,
usefulness, and convenience for the purpose intended. Approval of the substitution after award is at the
sole discretion of the Owner and all requests of this nature must be submitted in accordance with Article
3.1 of the General Conditions.
SECTION 002113 - INSTRUCTIONS TO BIDDERS Page 1 of 7
9/3/2026

5.0 - BIDS AND BIDDING PROCEDURE
A. Bidders shall submit all submission forms and accompanying documents listed in Section 004113 - Bid
Form, Article 5.0, Attachments to Bid by the stated time on the bid documents or the bid will be rejected
for being non-responsive.
B. Depending on the specific project requirements, the following is a GENERIC list of all possible bid
forms that may be due with bid submittals. Bidders must verify each specific project's requirements in
Section 004113 to ensure they have provided all the required documentation with their submission.
Bid Submittal - due before stated date and time of bid opening (see IFB):
004113 Bid Form (all pages are always required)
004322 Unit Prices Form
004336 Proposed Subcontractors Form
004337 MBE/WBE/SDVE/HDVE Compliance Evaluation Form
004338 MBE/WBE/SDVE/HDVE Eligibility Determination for Joint
Ventures
004339 MBE/WBE/SDVE/HDVE GFE Determination
004340 SDVE Business Form
004340.1 HDVE Business Form
004541 Affidavit of Work Authorization
004545 Anti-Discrimination Against Israel Act Certification form
C. The Bidder shall submit its bid on the forms provided by the Owner in the same file format (PDF) with
each space fully and properly completed, typewritten or legibly printed, including all amounts required
for alternate bids, unit prices, cost accounting data, etc. The Owner will reject bids that are not on the
Owner's forms and that do not contain all requested information. All forms can be found on the Owner's
website at https://oa.mo.gov/facilities/bid-opportunities/bid-listing-electronic-plans and shall be
submitted to FMDCBids@oa.mo.gov.
D. All bids shall be submitted without additional terms and conditions, modifications, or reservations. The
completed forms shall not include interlineations, alterations, or erasures. Bids not in compliance with
the requirements of this paragraph will be rejected as non-responsive.
E. All bids shall be accompanied by a bid bond executed by the bidder and a duly authorized surety
company, certified check, cashier's check or bank draft made payable to the Division of Facilities
Management, Design and Construction, State of Missouri, in the amount indicated in the bid documents
in Section 004113. Failure of the Bidder to submit the duly authorized bid bond or the full amount
required shall be sufficient cause to reject his bid. The Bidder agrees that the proceeds of the check,
draft, or bond shall become the property of the State of Missouri, if for any reason the Bidder withdraws
his bid after bid closing or if the Bidder, within ten (10) working days after notification of award, refuses
or is unable to 1) execute the tendered contract, 2) provide an acceptable performance and payment
bond, or 3) provide evidence of required insurance coverage.
F. The bid bond check or draft submitted by the successful Bidder will be returned after the receipt of an
acceptable performance and payment bond and execution of the formal contract. Checks or drafts of
all other Bidders will be returned within a reasonable time after it is determined that the bid represented
by same will receive no further consideration by the State of Missouri.
6.0 - SIGNING OF BIDS
A. A bid shall contain the full and correct legal name of the Bidder. If the Bidder is an entity registered
with the Missouri Secretary of State, the Bidder's name on the bid form shall appear as shown in the
Secretary of State's records. If the Bidder is an entity organized in a state other than Missouri, the
Bidder must provide a Certificate of Authority to do business in the State of Missouri.
B. If the successful Bidder is doing business in the State of Missouri under a fictitious name, the Bidder
shall furnish to Owner, attached to the Bid Form, a properly certified copy of the certificate of
Registration of Fictitious Name from the State of Missouri, and such certificate shall remain on file
with the Owner.
C. A bid from an individual shall be signed as noted on the Bid Form.
SECTION 002113 - INSTRUCTIONS TO BIDDERS Page 2 of 7
9/3/2026

D. A bid from a partnership or joint venture shall require only one signature of a partner, an officer of the
joint venture authorized to bind the venture, or an attorney-in-fact. If the bid is signed by an officer of
a joint venture or an attorney-in-fact, a document evidencing the individual's authority to execute
contracts should be included with the bid form.
E. A bid from a limited liability company (LLC) shall be signed by a manager or a managing member of
the LLC.
F. A bid from a corporation shall have the correct corporate name thereon and the signature of an
authorized officer of the corporation. Title of office held by the person signing for the corporation shall
appear, along with typed name of said individual and the corporate license number shall be provided.
In addition, for corporate proposals, the President or Vice-President listed per the current filing with
the Missouri Secretary of State should sign as the Bidder. If the signatory is other than the corporate
president or vice president, the bidder must provide satisfactory evidence that the signatory has the legal
authority to bind the corporation.
7.0 - RECEIVING BID SUBMITTALS
A. It is the Bidder's sole responsibility to ensure receipt of the bid submittals by Owner on or before the
date and time specified in the Invitation for Bid or as modified via written addenda. Bids received after
the date and time specified will not be considered by the Owner.
B. All bids shall be received via email at FMDCBids@oa.mo.gov. A bid submitted through any other
means, including hard copies, will not be considered and will be discarded by the Owner unopened.
8.0 - MODIFICATION AND WITHDRAWAL OF BIDS
A. Bidder may withdraw a bid at any time prior to the scheduled closing time for receipt of bids, but no
bidder may withdraw his bid for a period of twenty (20) working days after the scheduled closing time
for receipt of bids.
B. Bidder may modify a bid until the scheduled closing time by sending a revised bid to
FMDCBids@oa.mo.gov with a note in the subject line and body of the email that it is a revised bid. A
revised bid sent via any other method will not be considered.
9.0 - AWARD OF CONTRACT
A. The Owner reserves the right to reject any and/or all bids and further to waive all informalities in
bidding when deemed in the best interest of the State of Missouri.
B. The Owner reserves the right to let other contracts in connection with the work including, but not
limited to, contracts for the furnishing and installation of furniture, equipment, machinery, appliances
and other apparatuses.
C. The Owner will award a contract to the lowest, responsive, and responsible Bidder in accordance with
Section 8.250, RSMo. No contract will be awarded to any Bidder who has had a contract with the
Owner terminated within the preceding twelve months for material breach of contract or who has been
suspended or debarred by the Owner.
D. Award of alternates, if any, will be made in numerical order unless all bids received are such that the
order of acceptance of alternates does not affect the determination of the lowest, responsive, responsible
bidder.
E. No award shall be considered binding upon the Owner until the written contract has been properly
executed and the following documentation has been provided: 1) performance and payment bond
consistent with Article 6.1 of the General Conditions; 2) proof of the required insurance coverage; 3)
an executed Section 004541 - Affidavit of Work Authorization form; and 4) documentation evidence
enrollment and participation in a federal work authorization program.
F. Failure to execute and return the contract and associated documents within the prescribed period shall
be treated, at the option of the Owner, as a breach of Bidder's obligation and the Owner shall be under
no further obligation to Bidder.
G. Transient employers subject to Sections 285.230 and 285.234, RSMo, (out-of-state employers who
temporarily transact any business in the State of Missouri) may be required to file a bond with the
SECTION 002113 - INSTRUCTIONS TO BIDDERS Page 3 of 7
9/3/2026

Missouri Department of Revenue. No contract will be awarded by the Owner unless the successful
Bidder certifies that he has complied with all applicable provisions of Section 285.230-234.
H. Sections 285.525 and 285.530, RSMo, require business entities to enroll and participate in a federal
work authorization program in order to be eligible to receive award of any state contract in excess of
$5,000. Bidders should submit with their bid an Affidavit of Work Authorization (Section 004541)
along with appropriate documentation evidencing such enrollment and participation. Bidders must also
submit an E-Verify Memorandum before the Owner may award a contract to the Bidder. Information
regarding E-Verify is located at https://www.e-verify.gov/employers/enrolling-in-e-verify. The
contractor shall be responsible for ensuring that all subcontractors and suppliers associated with this
contract enroll in E-Verify.
I. The successful Bidder must be registered in MissouriBUYS powered by MOVERS at
https://missouribuys.mo.gov/supplier-registration# as an approved vendor prior to being issued a
contract.
10.0 - CONTRACT SECURITY
A. The successful Bidder shall furnish a performance/payment bond as set forth in General Conditions
Article 6.1 prior to the State executing the contract and issuing a notice to proceed.
11.0 - WORKING DAYS
A. Contract duration time is stated in working days and will use the following definition in determining the
actual calendar date for contract completion:
1. Working days are defined as all calendar days except Saturdays, Sundays and the following State of
Missouri observed holidays: New Year's Day, Martin Luther King, Jr. Day, Lincoln Day,
Washington's Birthday, Truman Day, Memorial Day, Juneteenth, Independence Day, Labor Day,
Columbus Day, Veterans Day, Thanksgiving Day and Christmas Day.
12.0 - AMERICAN AND MISSOURI - MADE PRODUCTS AND FIRMS
A. By signing the bid form and submitting a bid on this project, the Bidder certifies that it will use
American and Missouri products as set forth in Article 1.7 of the General Conditions. Bidders are
advised to review those requirements carefully prior to bidding.
B. A preference shall be given to Missouri firms, corporations or individuals, or firms, corporations or
individuals that maintain Missouri offices or places of business, when the quality of performance
promised is equal or better and the price quoted is the same or less.
C. Pursuant to Section 34.076, RSMo, a contractor or Bidder domiciled outside the boundaries of the State
of Missouri shall be required, in order to be successful, to submit a bid the same percent less than the
lowest bid submitted by a responsible contractor or Bidder domiciled in Missouri as would be required
for such a Missouri domiciled contractor or Bidder to succeed over the bidding contractor or Bidder
domiciled outside Missouri on a like contract or bid being let in the Bidder's domiciliary state and,
further, the contractor or Bidder domiciled outside the boundaries of Missouri shall be required to
submit an audited financial statement as would be required of a Missouri domiciled contractor or Bidder
on a like contract or bid being let in the domiciliary state of that contractor or Bidder.
13.0 - ANTI-DISCRIMINATION AGAINST ISRAEL ACT CERTIFICATION:
A. If the Bidder meets the section 34.600, RSMo., definition of a "company" and the Bidder has ten or
more employees, the Bidder must certify in writing that the Bidder is not currently engaged in a boycott
of goods or services from the State of Israel and shall not engage in a boycott of goods or services from
the State of Israel, if awarded a contract, for the duration of the contract. The Bidder is required to
complete and submit the applicable portion of Section 004545 - Anti-Discrimination Against Israel Act
Certification with its Bid Form. The applicable portion of the exhibit must be submitted prior to
execution of a contract by the Owner and issuance of Notice to Proceed.
14.0 - MBE/WBE/SDVE/HDVE INSTRUCTIONS
A. Definitions:
1. "MBE" means a Minority Business Enterprise.
SECTION 002113 - INSTRUCTIONS TO BIDDERS Page 4 of 7
9/3/2026

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow Veterans Affairs St. Louis Health Care System (VASTLHCS) John Cochran (JC) Hospital

DEPT OF DEFENSE

Bid Due: 11/12/2026

Project: Jefferson City Memorial Airport (JEF) ATCT Minimum Equipment List Installation Ref. #:

City of Jefferson

Bid Due: 10/27/2026

Johnson County: Bridge Replacement - Bridge No. 2870004; BRO-R051 (042); County Road NW

Drexel Technologies

Bid Due: 10/26/2026

Status Bid Advertisement Post Date Revision Date Letting Date NEW TAP-3302(449), KC District,

Missouri Department of Transportation(MDOT)

Bid Due: 10/27/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.