| Location: | Washington |
|---|---|
| Posted: | Jun 13, 2026 |
| Due: | Jun 15, 2026 |
| Agency: | City of Spokane |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Date | 6/15/26 1:00pm |
Spokane, WA
This project consists of the construction of approximately 1300 square yards of pavement repair excavation including haul, 70 linear feet of storm sewer, 5 drainage structures, 1100 square yards of concrete sidewalk, 1 driver feedback sign system, 2 traffic signal systems, 3 rectangular rapid flashing beacon systems, sundry utility adjustments, and other related miscellaneous items.

With GovernmentContracts, you can:
...options. Commodity Codes 913-81-Maintenance and Repair, Sewer and Storm Drain (Including Removal...) 913-45-Construction, ...
State Government of Washington
Bid Due: 10/12/2026
...of 15-inch Cured-In-Place Pipe (CIPP) to rehabilitate existing storm sewer. The CIPP is ...
City of Vancouver
Bid Due: 9/15/2026
...Improvements,Removal and Replacement of pipe,Roadway Pavement Markings,Sawcutting/Sidewalk/Pavement,Sewer... and Water Construction,Sidewalks/Curbs/Gutters,Signage,Sitework/Excavating and Grading,Storm Drain...), ...
City of Wenatchee
Bid Due: 9/16/2026