The purpose of this solicitation is to select a vendor to provide construction services as described in this Solicitation (the "Work") and who is the lowest responsive and responsible bidder to meet or exceed the minimum qualifications set forth in this Solicitation.
JEA System Protection and Control Projects is requesting a quote for construction services at Normandy Substation. Services needed include cable pulls from the substation yard to a new control house. Temporary cables must also be pulled between the new and old control houses.
The scope of work includes, but is not limited to:
Pull and terminate yard cables.
Pull and terminate panel-to-panel cables.
Pull new AC and DC cables to each panel.
Demo existing yard cables and panel-to-panel cables.
Demo existing AC and DC control house cables.
Demo old panels.
Pull communication cables.
Place and install new panels.
Extend cable tray and install communication tray.
Install GPS clock and antenna.
Bring cable from storeroom to substation.
Label all cables.
Pull and remove all temporary cables as directed.
Remove old and install new breaker, transformer, PT and motor switch conduit as needed.
USE THIS LINK TO ACCESS THE SOLICITATION ON ZYCUS:
https://zsn.zycus.com/guest/genericRegister/JEA074/iSource/905910/
Mandatory Pre-Response Meeting: January 22, 2025, at 09:00AM
Mandatory Pre-Response Site Visit: January 24, 2025, at 09:00AM
Second Pre-Response Meeting: January 30, 2025, at 09:00 AM
Response Due Date: February 4, 2025
Response Due Date: February 11, 2025