Procurement Details
| Smart Number | 2512-20260608083246 Hernando | Advertised Date | 06/26/2026 5:00 PM |
| RFx # | 3170036111 | Submission Date | 07/06/2026 10:00 AM |
| RFx Status | Open | Major Procurement Category | CONSTRUCTION |
| RFx Opening Date | N/A | Sub Procurement Category | CONSTRUCTION - SERVICES |
| RFx Type | MDA - RFx | ||
| Agency | MPTAP | ||
| RFx Description |
Sealed bids for the CONNECTION OF THE BYHALIA ROAD WATER PLANT TO THE
MADISON LAKES ELEVATED WATER TANK 2025 in Hernando will be received by the City of Hernando at the City Hall (until 10:00, A.M..) on Monday July 6, 2026 , at which time the bids wil |
||
| PRODUCT CATEGORY | PRODUCT DESCRIPTION |
| 92536 | Serv ProfessEngNoCla |
| VENDOR NAME | VENDOR NUMBER | AWARD DATE | AWARD AMOUNT | FUNDING SOURCE |
CONNECTION OF THE BYHALIA ROAD WATER PLANT TO THE MADISON LAKES ELEVATED
WATER TANK 2025
SPECIFICATIONS
FOR THE
CONNECTION OF THE BYHALIA
ROAD WATER PLANT TO THE
MADISON LAKES ELEVATED WATER
TANK 2025
CITY OF HERNANDO
DESOTO COUNTY, MISSISSIPPI
PROJECT ENGINEER:
JOSEPH F. LAUDERDALE P.E.
231 WEST CENTER ST
HERNANDO, MS. 38632
1
CONNECTION OF THE BYHALIA ROAD WATER PLANT TO THE MADISON LAKES ELEVATED
WATER TANK 2025
NOTICE TO BIDDERS
Sealed bids for the CONNECTION OF THE BYHALIA ROAD WATER PLANT TO THE
MADISON LAKES ELEVATED WATER TANK 2025 in Hernando will be received by
the City of Hernando at the City Hall (until 10:00, A.M..) on Monday July 6, 2026 , at
which time the bids will be opened and read aloud, (at 475 West Commerce Street,).
Bidding documents may be inspected in the office of the City Engineer, Joseph F.
Lauderdale, P.E. at 231 West Center Street, Hernando, MS. 38632 (901-494-2484)
during normal business hours.
Copies of the plans and contract documents may be obtained at the office of the project
Engineer, upon payment of $50.00 for each set of plans for the project with NO
REFUND. In the event the bids should run over $50,000.00, the bidder shall comply with
the Mississippi State law with respect to having a Certificate of Responsibility issued by
the Mississippi State Board of Public Contractors. All bids submitted must be sealed in
an envelope, clearly labeling the date the bid is to be opened, and the work bid upon.
DBE/WBE contracting firms shall be contacted concerning possible participation in this
project. Letters to the contracting firms must be kept on file by the Contractor if awarded
a contract for the Hernando water main construction project.
In addition. official bid documents can be downloaded from Central Bidding at
www.centralbidding.com. Electronic bids can be submitted at www.centralbidding.com.
For questions related to the electronic process, please call Central Bidding at
225-810-4814.
A bid bond in the amount of five percent (5%) of the bid price made payable to the City
of Hernando is required for the project. In accordance with the proper section of the
Mississippi Code, upon being awarded a contract for the construction of this project, the
successful bidder will be required to furnish the amount of not less than 100% of the
Contract Amount to insure the completion of the project and the payment of all bills for
labor, materials, and services required therefore. If the bid awarded is less than
$25,000.00, the successful bidder may choose to accept a lump sum payment on the
completion of the contract. In such case the Performance Bond will not be required, but
the Payment Bond will be required in any event.
The City of Hernando reserves the right to accept, or reject, any or all bids and waive
any informalities submitted.
Witness my signature, this the 2 nd day of June ,2026
Nicole Hilario, City Clerk
Published: June 4, 2026
June 11, 2026
2
CONNECTION OF THE BYHALIA ROAD WATER PLANT TO THE MADISON LAKES ELEVATED
WATER TANK 2025
INFORMATION FOR BIDDERS
BIDS will be received by the City of Hernando (herein called the "Owner"), at the
City Hall until 10:00 A.M. on Monday, July 6, 2026 and then the said officials
will publicly, open and read aloud. Each BID must be submitted in a sealed
envelope, addressed to the City of Hernando, Hernando, Mississippi.
Each sealed envelope containing a BID must be plainly marked on the outside as
BID for the CONNECTION OF THE BYHALIA ROAD WATER PLANT TO THE
MADISON LAKES ELEVATED WATER TANK 2025 in Hernando, will be
received by the City . The envelope should bear on the outside the name of the
BIDDER, his address, his license number if applicable and the name of the
project for which the BID is submitted. If forwarded by mail, the sealed envelope
containing the BID must be enclosed in another envelope addressed to the
Owner at Hernando City Hall in Hernando.
All BIDS must be made on the required BID form. All blank spaces for
BID prices must be filled in, in ink or typewritten, and the BID form must be fully
completed and executed when submitted. Only one copy of the BID form is
required.
The Owner may waive any informalities or minor defects or reject any or
all BIDS. Any BID may be withdrawn prior to the above scheduled time for the
opening of BIDS or authorized postponement thereof. Any BID received after the
time and date specified shall not be considered. No BIDDER may withdraw a
BID within 60 days after the actual date of the opening thereof. Should there be
reasons why the contract cannot be awarded within the specified period, the time
may be extended by mutual agreement between the Owner and the BIDDER.
BIDDERS must satisfy themselves of the accuracy of the estimated
quantities in the BID Schedule by examination of the site and a review of the
drawings and the specifications including ADDENDA. After BIDS have been
submitted, the BIDDER shall not assert that there was a misunderstanding
concerning the quantities of WORK or of the nature of the WORK to be done.
The CONTRACT DOCUMENTS contain the provisions required for the
construction of the PROJECT. Information obtained form an officer, agent, or
employee of the Owner or any other person shall not affect the risks or
obligations assumed by the CONTRACTOR or relieve him from fulfilling any of
the conditions of the contract.
3
CONNECTION OF THE BYHALIA ROAD WATER PLANT TO THE MADISON LAKES ELEVATED
WATER TANK 2025
INFORMATION FOR BIDDERS
Each BID must be accompanied by a BID bond payable to the OWNER
for five percent of the total amount of the BID. As soon as the BID prices have
been compared, the OWNER will return the bonds of all except the three lowest
responsible BIDDERS. When the Agreement is executed the bonds of the two
remaining unsuccessful BIDDERS will be returned. The BID bond of the
successful BIDDER will be retained until the performance bond has been
executed and approved, after which it will be returned. A certified check may be
used in lieu of a BID bond.
A performance bond in the amount of 100% of the CONTRACT PRICE,
with a corporate surety approved by the OWNER, will be required for the faithful
performance of the contract.
Attorneys-in-fact who sign BID bond and performance bond must file with
each bond a certified and effective dated copy of their power of attorney.
The party to whom the contract is awarded will be required to execute the
Agreement and obtain the performance bond within ten calendar days from the
date when NOTICE OF AWARD is delivered to the BIDDER. The NOTICE OF
AWARD shall be accompanied by the necessary Agreement bond forms. In
case of Failure of the BIDDER to execute the Agreement, the OWNER may at
his option consider the BIDDER in default, in which case the BID bond
accompanying the proposal shall become the property of the OWNER.
The OWNER within 10 days of receipt of acceptable performance bond,
payment bond and Agreement signed by the party to whom the Agreement was
awarded shall sign the Agreement and return it such party an executed duplicate
of the Agreement. Should the OWNER not execute the Agreement within such
period, the BIDDER may by written notice withdraw his signed Agreement. Such
notice of withdrawal shall be effective upon receipt of the notice by the OWNER.
The NOTICE TO PROCEED shall be issued within 10 days from the
execution of the Agreement by the OWNER. Should there be reasons why the
NOTICE TO PROCEED cannot be issued within such period, the time may be
extended by mutual agreement between the OWNER and CONTRACTOR. If the
NOTICE TO PROCEED has not been issued within the 10-day period or within
the period mutually agreed upon, the CONTRACTOR may terminate the
Agreement without further liability on the part of either party.
4
CONNECTION OF THE BYHALIA ROAD WATER PLANT TO THE MADISON LAKES ELEVATED
WATER TANK 2025
INFORMATION FOR BIDDERS
The OWNER may make such investigations as he deems necessary to
determine the ability of the BIDDER to perform the work, and the BIDDER shall
furnish to the OWNER all such information and the date for this purpose as the
OWNER may request. The OWNER reserves the right to reject any BID if the
evidence submitted by, or investigation of, such BIDDER fails to satisfy the
OWNER that such BIDDER is properly qualified to carry out the obligations of the
Agreement and to complete the WORK contemplated therein.
A conditional or qualified BID will not be accepted. The award will be made as
a whole to one Bidder.
The site of the proposed construction is at the Jaybird Water Plant on Jaybird
Road in Hernando in DeSoto County, Mississippi.
The Bidder to whom the contract is awarded shall within ten (10) days after
notification of the acceptance of the bid, sign the construction contract. Failure to
do so, unless given a written extension of time by the Mayor and Board of
Aldermen, shall constitute a breach of the bid agreement and be cause for not
accepting contract.
Awards will be made on the basis of the lowest responsible Bidder,
provided it is to the City's interest to accept the bid.
In case of errors in the extension amount, the unit price bid shall govern.
The Engineer will check each item extension in each bid, as a check against the
total bid.
Each Bidder is warned to make a careful investigation of the site of the
work and to inform himself on all matters affection the work, as no information
furnished by the officials, or others, upon such matters shall in any way relieve
the bidder from risk or responsibility in fulfilling all the terms of the contract in the
event he is awarded the contract.
The proposal shows the various items of the work to be done under the
project as far as it is possible to estimate, and the amount of the bid price for the
item. The Contractor is hereby warned that he shall read the contract documents
carefully, and any and all allowances required for the performance of the work
involved in the construction of any part of the contract shall be figured by the
contractor into one of the items bid.
Any Bidder contemplating submitting a bid, and who may be in doubt as to
the meaning of any part of the specifications and contract documents pertaining
to the work should request an explanation in writing from the Engineer.
5
CONNECTION OF THE BYHALIA ROAD WATER PLANT TO THE MADISON LAKES ELEVATED
WATER TANK 2025
INFORMATION FOR BIDDERS
The Contractor shall begin work on the contract within ten (10) days after
the day on which the contract is ordered started in a letter from the City or the
Engineer. There is a space provided in the Proposal to set the date of the
completion of the project. The number of calendar days so listed sets the time
and limit on the project which will be entered in the contract and may determine
the award of the contract.
Before the successful Bidder shall let a part of the work to a subcontractor,
he must submit name and address of proposed subcontractor, and receive the
written approval of the owners. All applicable laws, ordinances, and the rules and
regulations of all authorities having jurisdiction over construction of the project
shall apply to the contract throughout.
Each BIDDER is warned to make a careful investigation of the site of the
work and to inform himself on all matters affection the work, as no information
furnished by the officials, or others, upon such matters shall in any way relieve
the BIDDER from risk or responsibility in fulfilling all the terms of the contract in
the event he is awarded the contract.
The proposal shows the work to be done under the project. The
Contractor is hereby warned that he shall read the Contract documents carefully,
and any and all allowances required for the performance of the work involved in
the construction of any part of the contract shall be figured into price bid.
All unit prices bid shall be firm prices for the duration of the project, or until at
such time as all work has been completed.
Awards will be made on the basis of the lowest responsible BIDDER,
provided it is to the City's interest to accept the bid.
Further, the BIDDER agrees to abide by the requirements under Executive
Order No. 11246, as amended, including specifically the provisions of the equal
opportunity clause set forth in the Supplemental General Conditions.
The low BIDDER must supply the names and addresses of major material
suppliers and subcontractors when requested to do so by the OWNER.
Inspection trips for prospective BIDDERS will leave from the Hernando
City Hall at 475 West Commerce Street in Hernando. The ENGINEER is Joseph
F. Lauderdale P.E. His address is 231 West Center St. Hernando, MS. 38632
6
CONNECTION OF THE BYHALIA ROAD WATER PLANT TO THE MADISON LAKES ELEVATED
WATER TANK 2025
MISCELLANEOUS INFORMATION
CONSTRUCTION SPECIFICATIONS
1. Traffic of all kinds shall be maintained continuously and access to
buildings shall be provided for at all times, unless otherwise specified
in the contract documents, or where temporary interference is
authorized by the Engineer, in which case, it shall be interrupted only
for such time as is necessary to provide temporary substitutes for
surface disturbed by the construction and to restore street after
completion of the work. Provisions shall be made for owners and
occupants to reach their premises.
2. The contractor, at his own expense, shall erect and maintain all
necessary fences, barricades, red lanterns, and danger signals. The
lights shall be kept burning from sunset until sunrise, and necessary
watchman shall be provided for the safety of the public. The
contractor shall observe such rules relative to signals and safeguards
as the police regulations, laws, and ordinances require.
3. The quantities of work shown on the documents and as advertised
for bids are estimated quantities and are used for the purpose of
comparing bids. The right is reserved by the owner to increase or
decrease the quantities an amount not to exceed 25% of the total of
any given item.
4. On driveways, care shall be taken to cut drive surfaces only as
directed by the Engineer to install the lines. All damages to the drive
outside of the limit set out above shall be repaired by the Contractor
at his own expense to the satisfaction of the Engineer. All crossings
shall be maintained until completion of the project.
5. Location of pipelines is approximately located on the plans. Final
location shall be made before construction begins by the Engineer as
well as valves, fittings, etc.
7
CONNECTION OF THE BYHALIA ROAD WATER PLANT TO THE MADISON LAKES ELEVATED
WATER TANK 2025
CONSTRUCTION SPECIFICATIONS
6. The Contractor shall use great care in protecting buildings, trees,
fences, and other properties during construction. He shall replace or
repair any damaged item mentioned above without compensation.
He shall replace fences and grass sod in front yards of homes that
have been damaged or removed without compensation.
7. All pipe, valves, and etc. will be examined for defects and if in the
opinion of the Engineer, they are not suitable for the project, other
items will be obtained at the cost of the contractor. All pipe, and etc.
will be made free from dirt and other foreign materials before being
placed in the trench. When the work is stopped at night or for other
reasons, the ends of the pipe shall be plugged to prevent mud, water,
and or other matter from entering. All joints shall be laid according to
acceptable and approved practices in a good and workmanlike
manner and with a watertight connection.
8. All lines will be tested before placing in service and the cost of this
work shall be included in the unit price and will not be paid for
separately. Water for testing and sterilizing will be furnished by the
owner from the City system at no cost to the contractor; however, the
contractor at his own expense shall make all temporary connections
required and remove same after the work is complete.
9. Tracer wire will be required to be installed along and with the water
main. The cost of the wire and labor to install should be included in
the cost the laying the water main.
8
CONNECTION OF THE BYHALIA ROAD WATER PLANT TO THE MADISON LAKES ELEVATED
WATER TANK 2025
CONSTRUCTION SPECIFICATIONS
WATER MAINS
PIPING - All PVC pipe larger than 2" shall be Class 150, John
Manville, or equal, with rubber ring couplings and meeting the
requirements of AWWA Specification C 900-75 and also ASTM
specification D-2241. All pipes must be stamped with "NSF" seal of
approval. All pipe that is 2 inches shall be SCH 40 PVC. When the
fourteen inch (14) pipe is shown for the road crossing, that pipe shall
be High Density Polyethylene pipe. All connections shall be fused
together as per manufactures specifications.
DUCTILE IRON PIPE AND FITTINGS - Ductile iron pipe shall be
gasket or "slip on type joints" or mechanical joints, Class 150 as per
the requirements of American Standards A21.10 and A21.11 (AWWA
C101) and WW-P-4215 for three feet of cover.
Cast iron fittings for pipe shall be Class 250 mechanical joint cast iron
meeting all requirements of American Standards A21.10 and A21.11.
All valves are to be right hand opening. The mechanical joints shall
be made with plain rubber gaskets. All specifications referred to in
these specifications are the latest issue.
VALVES - Gate valves shall be Mueller, M & H Crane, or approved
equal for 125 Pounds working pressure. Valves 4" and larger shall
have mechanical joints. Valve boxes shall be installed over all main
valves and shall be equal to Mueller Standard cast iron No. H-
103060. The boxes shall be provided with covers with "water" in
raised letters printed on top and shall be of the dimensions suitable
for depth of the main and installed as shown on the plans.
SERVICE PIPE AND FACILITY DRAINAGE PIPE- Service pipe shall
be 1" PE (poly) pipe and all connectors shall meet AWWA
Specifications. The installation of the service assembly shall be
flushed thoroughly and sterilized before putting into service. The
service assembly shall be installed in a good and workmanlike
manner, at the place designated and directed by the Engineer. The
facility 8 inch and 12 inch drainage pipe and fittings will require SDR
26 pipe. All joints, connections, etc. shall be water tight and
acceptable to the Engineer.
9
CONNECTION OF THE BYHALIA ROAD WATER PLANT TO THE MADISON LAKES ELEVATED
WATER TANK 2025
CONSTRUCTION SPECIFICATIONS
WATER MAINS (Continued)
METER AND ASSEMBLY - The curb stop shall be Mueller H-15174
Mark II, oriseal, or equal, meeting AWWA Specifications. Meter Box
shall be a standard weight black PVC conforming to AWWA
Specifications; a plastic box will not be accepted. The meter will be
provided by the City of Hernando and will be cold-water mulating
disc type, or equal to Badger and totalizer shall read in gallons. The
corporation stop shall be Mueller H-15000 or equal.
FIRE HYDRANTS - Fire hydrants shall conform to the requirements
of the AWWA Specifications for fire hydrants, valve openings, and
hub and pipe connections for 6" lines, sufficient length for at least 3
foot bury, two National Fire Underwriters Standard 2 1/2" hose
connections and one 4 1/2 standard steamer connection, diameter of
seat opening to be not less than five and one quarter inches. All fire
hydrants shall have national standard threads or national hose
threads.
All threads shall match those of existing hydrants in the area.
Hydrants shall open clockwise (to the right), shall have a one inch
square operating nut and shall be of the compression type, with the
proper drip valve, and constructed so that they will not flood it when
the barrel is broken. Valves shall be removable without digging. The
fire hydrants shall be similar or equal to those manufactured by M &
H Valve and Fittings Co., or Mueller Company.
Hydrants shall have a stop coat of black asphalt paint below grade
and a red coat above grade. Contractor shall paint hydrants after
setting as directed by the Engineer.
Hydrants shall be located as shown on the plans or as directed by the
Engineer and shall be set in a true plumb position, to the established
grade, with lowest nozzle at least 12" above ground. Hydrants shall
be set upon a slab of concrete four inches thick and not less than
fifteen inches square and shall be backed by concrete to prevent the
hydrant from blowing off the lead.
10

With GovernmentContracts, you can:
...of the following Project: Singing River Street Water Main Improvements Bids for the ...
Neel-Schaffer, Inc
Bid Due: 9/03/2026
...Agency MPTAP RFx Description Separate and sealed or electronic bids for the construction ...
State Government of Mississippi
Bid Due: 9/08/2026
...Procurement Details Smart Number 378-20260728101941 JXN Water Advertised Date 08/04/2026 5:00 PM... ADVERTISEMENT ...
State Government of Mississippi
Bid Due: 9/09/2026