| Location: | Georgia |
|---|---|
| Posted: | Jul 23, 2025 |
| Due: | Sep 3, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-66062-NONST-2026-000000243 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66062-NONST-2026-000000243 | IFB/CON/DOA/2505-1250185/Central Passenger Terminal Complex (CPTC) Restroom Enhancements- Phase 2 | Atlanta, City Of |
Jul 23, 2025 @ 12:13 PM
|
Sep 03, 2025 @ 02:00 PM
|
Start Date: Jul 23, 2025 @ 12:13 PM ET
End Date:
Sep 03, 2025 @ 02:00 PM ET
The Department of Aviation is seeking a Contractor to complete Phase 2 of the Central Passenger Terminal Complex Restroom implementation and enhancement work. The installation includes improvement for staff service operations, updated finishes, MEP components, and re-composition of all restroom entries with a new interior façade, modernize existing passenger-accessible restrooms and family (all-gender) restrooms throughout the CPTC. The Contractor will demolish existing areas, including partition walls, finishes, ceilings, and MEP components in male and female restrooms, all-gender restrooms, and janitor¿s closets. Temporary construction walls will be Installed around project sites to protect adjacent areas and maintain their operation during construction. The Contractor is responsible for ensuring removal of these walls without causing damage to surrounding finishes or structures. The Contractor will complete the installation of new finishes, including flooring and base, wall and ceiling treatments, toilet partitions, accessories, and MEP components, installation of the new façade incorporating restroom entries, janitor¿s closets, and drinking fountain. The enhancement of the restrooms includes updating interior finishes, replacing fixtures, reconfiguring layouts, and expanding the footprint by extending building walls beyond the existing exterior wall toward the airfield area. The Phase 2 project consists of six restroom pairs, including TN6, TMS3, AN6, CS2, FMS3, and IT2.
| Code | Description |
| 15505 | Barriers and Enclosures, Construction |
| 90638 | General Construction, Architectural Services |
| 90910 | Airport Facility Construction |
| 90925 | Building Construction, Prefabricated, All Types |
| 90924 | Building Construction, Commercial and Institutional |
| 90922 | Building Construction, Non-Residential, Office Bldg., etc. |
| 90930 | Building Construction, (Not Otherwise Classified) |
| 90975 | Site Clean-up, Post-Construction |
| 90977 | Special Construction: Observatory, Security, Special Rooms, etc. |
| 91484 | Trade Services, Construction, (Not Otherwise Classified) |
| 92544 | General Construction: Management, Scheduling, Cost Estimation Engineering |
Shannon Newton
shnewton@atlantaga.gov
404-782-3249

With GovernmentContracts, you can:
...Heating, Air Conditioning, and Ventilation Maintenance, Repair and Installation Services 90945 Finishes..., Flooring, ...
State Government of Georgia
Bid Due: 10/22/2026
..., installation of a breathable brick sealer and painting. An alternate for installation ...
State Government of Georgia
Bid Due: 11/10/2026
...Finishes, Flooring, Wall and Ceiling, etc. 91461 Painting and Wallpapering 45026 Door Closers... ...
State Government of Georgia
Bid Due: 10/06/2026
..., Installation, Restoration, Maintenance and Repair Services, 91240 Demolition Services 91429... Communication Systems, ...
State Government of Georgia
Bid Due: 10/20/2026