INVITATION FOR BID (IFB)
IFB No. 263-26
TRAFFIC SIGNAL PARTS
Purchasing Analyst of Record: Nykeba Klein
Nykeba.Klein@thorntonco.gov
City Hall – 2nd Floor
Contracts and Purchasing Division
9500 Civic Center Drive
Thornton, CO 80229-4326
Main Phone: (303) 538-7325
IFB No. 263-25
Traffic Signal Parts
TABLE OF CONTENTS
SCHEDULE, PURCHASING ANALYST OF RECORD, AND GENERAL
SUMMARY OF NEEDS............................................................................................................. 4
A.1 SCHEDULE OF EVENTS:............................................................................................... 4
A.2 PURCHASING ANALYST OF RECORD: ....................................................................... 4
A.3 GENERAL SUMMARY OF PROCUREMENT NEEDS: .................................................. 4
CURRENT STATE, SCOPE OF WORK, AND SPECIAL CONSIDERATIONS .. 5
B.1 CURRENT STATE: ......................................................................................................... 5
B.2 SCOPE OF WORK – GENERAL CONSIDERATIONS: .................................................. 5
B.3 ESTIMATED QUANTITIES: ............................................................................................ 8
B.4 F.O.B. POINT: ................................................................................................................. 8
B.5 DELIVERY CONSIDERATIONS: .................................................................................... 8
B.6 SAMPLES: ...................................................................................................................... 8
B.7 INVOICING REQUIREMENTS: ....................................................................................... 8
B.8 FELONY DISQUALIFICATION: ...................................................................................... 9
B.9 PROCUREMENT CARDS PAYMENT CONDITIONS: .................................................... 9
B.10 EMERGENCY PURCHASES: ....................................................................................... 9
B.11 PALLET CHARGE: ....................................................................................................... 9
B.12 VENDOR PERFORMANCE MANAGEMENT: .............................................................. 9
B.13 COOPERATIVE PURCHASING: .................................................................................. 9
PRICING AND PROPOSAL ITEMS .................................................................. 11
C.1 PRICING INFORMATION: ............................................................................................ 11
C.2 VENDOR PRICING SUBMITTAL:................................................................................. 11
C.3 VENDOR COOPERATIVE AGREEMENTS: ................................................................. 11
C.4 TARIFFS: ...................................................................................................................... 12
C.5 PRICING:....................................................................................................................... 12
C.6 ANNUAL PRICE UPDATES: ........................................................................................ 12
C.7 DISCOUNTS (FROM PUBLISHED PRICE LISTS): ...................................................... 13
C.8 PROPOSAL ITEMS: ..................................................................................................... 13
C.9 CATALOG DISCOUNT FOR NON-LISTED TRAFFIC SIGNAL PARTS ...................... 13
PROPOSAL INSTRUCTIONS, EVALUATION, AND AWARD ......................... 15
D.1 PROPOSAL POSTED LOCATIONS:............................................................................ 15
D.2 PROPOSAL QUESTIONS: ........................................................................................... 15
Page 2 of 24
S:\SS\C-P\2026\263-26 Traffic Signal Parts\2-Bid Documents\BidNet\1-Original Upload
IFB No. 263-25
Traffic Signal Parts
D.3 ADDENDA:.................................................................................................................... 15
D.4 SUBMISSION OF PROPOSALS: ................................................................................. 15
D.5 DOCUMENTS FOR FINAL VENDOR SUBMISSION: .................................................. 16
D.6 PAGE LENGTHS FOR FINAL VENDOR SUBMISSION: ............................................. 16
D.7 LATE PROPOSAL SUBMISSIONS: ............................................................................. 17
D.8 AWARDS: ..................................................................................................................... 17
D.9 ACCEPTANCE PERIOD: .............................................................................................. 17
D.10 AWARD TERM LENGTH: ........................................................................................... 17
D.11 POST AWARD PURCHASE ORDER: ........................................................................ 17
D.12 STANDARD PROPOSAL CONSIDERATIONS: ......................................................... 18
REQUIRED VENDOR SIGNATURE FORMS .................................................... 19
E.1 ACCEPTANCE AND ADDENDA ACKNOWLEDGEMENT FORM: .............................. 19
E.2 REFERENCES AND AUTHORIZATION AND RELEASE FORM: ................................ 20
E.3 DISCLOSURE OF GENERATIVE ARTIFICIAL INTELLIGENCE (A.I.) USAGE FORM:
............................................................................................................................................. 22
AUTHORIZATION FOR SOLICITATION POSTING .......................................... 24
F.1 PURCHASING MANAGER FORM: ............................................................................... 24
Page 3 of 24
S:\SS\C-P\2026\263-26 Traffic Signal Parts\2-Bid Documents\BidNet\1-Original Upload
IFB No. 263-25
Traffic Signal Parts
SCHEDULE, PURCHASING ANALYST OF RECORD, AND GENERAL
SUMMARY OF NEEDS
A.1 SCHEDULE OF EVENTS:
The following is a list of important items, dates, and times that pertain to this solicitation. All
times listed below are in reference to the local Thornton, Colorado time.
Solicitation Item
Proposal Issued
Deadline to Submit Additional Questions
Response to Written Questions
Proposal Due Date
Date
08/11/2026
08/25/2026
08/28/2026
09/15/2026
Time
11:00 P.M.
11:00 P.M.
11:00 P.M.
A.2 PURCHASING ANALYST OF RECORD:
The Purchasing Analyst of Record for this solicitation will be the central point of contact
throughout the solicitation process. All questions and inquiries must be submitted in writing via
a direct email to the Purchasing Analyst. No communication is to be directed to any other
Thornton personnel.
The Purchasing Analyst of Record’s contact information is as follows:
Name: Nykeba Klein
Title: Purchasing Analyst 2
Email: Nykeba.Klein@thorntonco.gov
A.3 GENERAL SUMMARY OF PROCUREMENT NEEDS:
The City of Thornton, CO (“Thornton”) is seeking Proposals from interested firms for the
purchase and delivery of various manufacturers and models traffic signal components required
for the Thornton’s traffic operations, maintenance and upgrades.
Page 4 of 24
S:\SS\C-P\2026\263-26 Traffic Signal Parts\2-Bid Documents\BidNet\1-Original Upload
IFB No. 263-25
Traffic Signal Parts
CURRENT STATE, SCOPE OF WORK, AND SPECIAL CONSIDERATIONS
B.1 CURRENT STATE:
Thornton previously solicited traffic signal materials under IFB 373-22. That Contract was
awarded in 2022 and remains active; however, the City is issuing this new Invitation for Bid to
update the list of materials and obtain current pricing. The previous solicitation did not generate
sufficient historical usage data, and the City is reviewing all parts and quantities to ensure they
reflect current operational needs. This IFB and all of its ensuing awards will replace the 2022 bid
and establish an updated set of awards for traffic signal materials.
As part of this solicitation, vendors may propose alternate, comparable products when a brand
name or part number is listed in the specifications or on the Proposal Item Pricing Sheet.
Vendors submitting an alternate must provide the manufacturer/brand, part number, and a clear
description of all differences compared to the listed brand-name item. Thornton will consider
alternates; however, approval is not guaranteed.
Alternates will not be accepted for the following items:
• Item 24 – Push Button Switch, Pedestrian, Black
• Item 48 – EDI Conflict Monitor
B.2 SCOPE OF WORK – GENERAL CONSIDERATIONS:
1. General Requirements-
Vendor shall provide:
• New, current-production traffic signal components.
• Materials that meet or exceed:
o CO State DOT specifications
o ITE (Institute of Trasportation Engineers) equipment standards
• All manufacturer warranties plus any additional vendor-provided
warranties.
• Replacement of any defective or non-compliant items at no cost to
Thornton.
2. Proposed Items - Vendors shall furnish all materials listed in the Pricing Form that has
been provided under separate cover as a Microsoft Excel spreadsheet and is titled
“263-26 IFB Appendix No. 1 Pricing Form”. Items fall into the following categories:
2.1 LED Signal Modules
Includes all LED inserts in Bid Items 1-10:
• 12” Arrow LED inserts (red, yellow, green)
• 12” Ball LED inserts (red, yellow, green)
• 3M LED inserts (red, yellow, green)
• Pedestrian countdown modules (18”)
Page 5 of 24
S:\SS\C-P\2026\263-26 Traffic Signal Parts\2-Bid Documents\BidNet\1-Original Upload
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.