ADDENDUM NO. 4
COUNTY OF PUEBLO, COLORADO
IFB No. 25-37 - GSC SEH Pueblo Office Renovation
Date: November 26, 2025
What the Change is being done to the current IFB:
1. Questions & Answers
The proposer shall permanently affix this Addendum No. 4 to the IFB packet so it will be
submitted with the IFB.
The undersigned proposer acknowledges receipt of this Addendum No. 4.
Received by: _________________________________________
Firm Name: ___________________________________________
Address: _____________________________________________
Date: ________________________________________________
Page 1 of 4
QUESTIONS
1. What is the deck height?
+/- 11 Feet.
2. What is the existing ACT? We want to be able to accurately match this product.
Our intent is so that we can reuse salvaged tiles are much as we can. If more are
needed, they’re to match existing. From previous suite renovation drawings, it
was mentioned that they’re building standard.
3. Does the Demountable Partition for the conference room need a header (if so,
please provide detail as per 5/A011)?
1. If it does require a header, is it above ACT or a soffit? What is the
elevation?
From further coordination with the manufacturer (Teknion TekVue), the door has
been switched to sliding glass door. The demountable partition and door will be
owner furnished and will be installed by Teknion to maintain warranty. They will
provide ceiling track for the demountable partition. GC to provide coordination
with the installed as needed.
4. How are we to stock materials for this project?
Materials can be held on 1st floor in unfinished/unoccupied space.
5. Are we to use the elevator or are we able to remove a window to move materials
in and out?
Elevators can be used
6. Are we to work normal business hours?
Yes, you can work during normal business hours. If you would like to work
outside of normal business hours, Property Manager, Elizabeth Fritch, can get
you access to building
7. Is door 103 part of the demountable partition or are we to provide that?
Please see question 3.
8. If we are to install the demountable partition, please provide information on the
system.
Please see question 3.
9. Please provide a full description of glass type GL-1 in frame type F2?
1. Is ¼” clear tempered glass acceptable?
Yes that is acceptable.
10. Where is Panel L5C located in the building? We may need to run new circuits to
panel.
Page 2 of 4
Panel L5C is located in the 5th floor electrical room. See Map provided for
Question #16.
11. Please confirm the 3D signage for the lobby area is by owner.
Looks like there was a PDF printing issue, Elevations 4 on A411 is supposed to
show the image of the signage. Please see below. The signage is to be provided
and installed by the GC.
12. The door schedule is calling for all office, IT and Storage doors to be hollow
metal. Is this correct?
Information on schedule is incorrect. Door 101, 102, 104, and 105 are supposed
to be a reinstalled of salvaged wood doors.
13. Verify if we are to replace the sprinkler pipe with the slip-fit fittings that is located
in the remodel area?
Sprinkler piping within the remodel area shall be modified or adjusted as needed
to provide compliant coverage for the new layout per NFPA 13. A full system
redesign is not anticipated. Existing branch lines and sprinkler heads may be
relocated, adjusted, or reconfigured to achieve the required coverage. Use of
slip-fit fittings or replacement of existing piping shall follow the delegated fire
protection design prepared, stamped, and sealed by the fire protection
subcontractor’s engineer of record.
14. The architectural drawings indicate that door 103 is in the owner furnished
demountable partition system. Please confirm whether Door 103 is to be
furnished by the contractor per the door schedule, or if it will be provided as part
of the owner-furnished demountable partition system.
Please see question 3.
15. Drawing E101 keynote #3 states that the contractor shall provide floor boxes for
the modular furniture. It was mentioned during discussions at the site visit that an
office cubicle pole system may be used instead of floor boxes to provide flexibility
for future modular furniture installation. Please confirm whether the cubicle pole
option is acceptable in lieu of floor boxes,
Please provide floor boxes as part of the bid. Once total costs are known, it is
possible these will be replaced with power poles for the cubicles.
Page 3 of 4
16. Could you please provide the location of the electrical panels and electrical
rooms?
Please see below for electrical room location.
17. Panel PP5-1 , keynote 8 on Sheet E101 says it is in the 5th. floor electrical room
but the electrical room is not shown.
See Map provided for Question #16.
18. Panel AC6 , keynote 9 on Sheet E101 says it is in the 6th. floor electrical room
but the electrical room is not shown.
The electrical rooms are stacked above each other on each floor. Therefore, the
6th floor electrical room is located directly above the 5th floor electrical room. See
Map provided for Question #16.
19. Panel L5C , no location information provided.
Panel L5C is located in the 5th or electrical room. See Map provided for Question
#16.
Page 4 of 4