SWANTON-HIGHGATE STP FPAV(77)

Location: Vermont
Posted: May 20, 2026
Due: Jun 12, 2026
Agency: State of Vermont - Agency of Transportation
Type of Government: State & Local
Category:
  • 66 - Instruments and Laboratory Equipment
Solicitation No: C03281
Publication URL: To access bid details, please log in.
CONSTRUCTION ADVERTISEMENTS QUESTIONS DUE PRIOR TO 4:30 PM ADDENDA BID OPENING

C03281

SWANTON-HIGHGATE STP FPAV(77)

PROPOSAL

TMP Checklist
APPROVED BIDDERS LIST

PLAN HOLDERS LIST

DOWNLOAD PLANS IN iCX

6/3/2026

6/12/2026

Attachment Preview

VTransMissionandVision
Throughexcellentcustomerservice,provideforthesafeandefficientmovementofpeopleandgoods.

VERMONT CA-96
Contract Number: C03281
Contract Name: SWANTON-HIGHGATE STP FPAV(77)
VERMONT
AGENCYOFTRANSPORTATION
PROPOSAL
STANDARDSPECIFICATIONSFORCONSTRUCTION
DATED2024SHALLAPPLYTOTHISCONTRACT
SPECIALPROVISIONS
SCHEDULEOFITEMS
ELECTRONICBIDBONDtobesubmittedintheamountof5%oftheContractor'sbid.
BIDDINGPROCEDURE
Bid Proposals will not be read unless accompanied by an electronic bid bond, and they may be rejected as
irregulariftheyarenotincompliancewithAgencyspecifications.
NOTE: All bid proposals shall be properly filled out and submitted electronically utilizing iCX Web
Systemservices.
VTransMissionandVision
Throughexcellentcustomerservice,provideforthesafeandefficientmovementofpeopleandgoods.
Asafe,reliable,andmultimodaltransportationsystemthatgrowstheeconomy,isaffordabletouseand
operate,andservesvulnerablepopulations.

Cover Page Proposal ____________________________________________________________ 1
Table of Contents _______________________________________________________________ 2
Project Special Provisions ________________________________________________________ 3
Required Contract Provisions for Federal Aid Construction Contracts FHWA 1273 ___________ 17
USDOL Davis Bacon Wage Rates 2026 - Franklin County ______________________________ 31
DBE Policy Required Contract Requirements CR110 - 2026 _____________________________ 36
Attachment C - Standard State Contract and Grant Provisions Rev 2-13-26 _________________ 41
USDOT Standard Title VI Nondiscrim Assurances Appendix A and E _____________________ 51
Standard Federal EEO Construction Contract Specifications _____________________________ 54
Contractor EEO Certification Form - CA109 _________________________________________ 61
Vermont AOT Certificate of Compliance - CA271 _____________________________________ 62
Vermont AOT Minimum Labor and Truck Rates - CA101 _______________________________ 66
Commodity Index Prices CA170 - Spec Book 2024 ____________________________________ 67
Proposal Schedule of Pay Items ____________________________________________________ 68

Swanton-Highgate STP FPAV(77)
PIN Number(s): 21V396 Advertised May 20, 2026
Special Provisions Part I - Notice to Bidders Page 1
SPECIAL PROVISIONS
1. NOTICE TO BIDDERS - CONTRACT COMPLETION DATE. This Contract shall be completed
on or before August 2, 2027.
2. NOTICE TO BIDDERS - WORK RESTRICTIONS. The Contractor is hereby notified that no
work on site or stockpile requests shall begin before June 17, 2026.
3. NOTICE TO BIDDERS - MOBILIZATION/DEMOBILIZATION. The Contractor is hereby
notified that Section 635.03(a) is hereby deleted in its entirety and replaced with: The first payment
of 50% of the lump sum price for Mobilization/Demobilization, or 10% of the adjusted Contract
price, whichever is less, will be made on the first bi-weekly estimate processed after July 1, 2026.
4. NOTICE TO BIDDERS - PROHIBITION OF RUSSIAN GOODS. The Contractor is hereby
notified that, pursuant to Vermont Executive Order No. 02-22, dated March 3rd, 2022, the
purchase of Russian-sourced goods and goods produced by Russian entities (defined as institutions
or companies that are headquartered in Russia or have their principal place of business in Russia)
is prohibited. The awarded Contractor must fill out and sign the Executive Order 02-22 Vendor
Certification as part of Contract awarding process.
5. NOTICE TO BIDDERS - ELECTRONIC DOCUMENT MANAGEMENT. The Contractor is
hereby notified that the Contractor, their subcontractors, and suppliers shall create both a Doc
Express and an iCXWeb account. The Contractor shall use these applications for collection and
management of electronic documents. Doc Express can be accessed at the following link:
https://docexpress.com. iCXWeb can be accessed at the following link:
vtrans.exevision.com/icx/Index.aspx.
All costs associated with the use of Doc Express and iCXWeb will be considered incidental to
Item 635.1100, Mobilization/Demobilization. The State will manage the applications including
Contract setup upon Contract execution.
To create an account and for more information regarding the use of Doc Express see the
information at the following link:
https://outside.vermont.gov/agency/vtrans/external/docs/construction/Contracting/DocExpressOv
erviewforContractors.docx.
To create an account and for more information regarding the use of iCXWeb see the information
at the following link: https://vtrans.vermont.gov/icx.

Swanton-Highgate STP FPAV(77) Advertised May 20, 2026
Special Provisions Part I - Notice to Bidders Page 2
6. NOTICE TO BIDDERS - ELECTRONIC TICKETING VTRANS PORTAL. The Contractor
is hereby notified that the Contractor, their subcontractors, and suppliers shall connect to the
VTrans Portal and use the application for distribution and management of electronic tickets (e-
tickets). VTrans Portal is a state cloud-based e-ticket database, including a web-based user
interface and a jobsite mobile e-ticket application. VTrans Portal will interface with the
Contractor's supplier existing point of sales or e-ticketing platform and will allow VTrans to
manage bituminous material e-tickets.
All costs associated with the use of VTrans Portal will be considered incidental to the appropriate
Section 406 and Section 407 pay items. The Agency will manage the VTrans Portal application
including Contract setup upon Contract execution.
To create an account, connect to the VTrans Portal, and for more information regarding the use of
VTrans Portal see the information at the following link: https://www.haulhub.com/vermont-
agency-transport-22/
7. NOTICE TO BIDDERS - CONTACT WITH THE AGENCY. From the time of advertising until
the actual bid opening for this Contract, all prospective Contractors, subcontractors, and suppliers
shall direct all inquiries related to this Contract solely to the Agency's Contract Administration
Section at AOT.ConstructionContractingInquiry@vermont.gov.
The deadline for submitting inquiries related to this Contract is 4:30 p.m. Eastern Time on June 3,
2026. Inquiries received prior to this time will receive a response from the Agency. Inquiries
received after this time may receive a response at the Agency's discretion.
8. NOTICE TO BIDDERS - OTHER SPECIFICATIONS AND CONTRACT REQUIREMENTS.
FHWA 1273 - Required Contract Provisions for Federal Aid Construction Contracts
USDOL Davis Bacon Wage Rates by County
Disadvantaged Business Enterprise (DBE) Policy Contract Requirements - CR-110
Attachment C - Standard State Provisions for Contracts and Grants
USDOT Standard Title VI Nondiscrimination Assurances Appendices A, E
Standard Federal Equal Employee Opportunity (EEO) Construction Contract Specifications CA26
Contractor Equal Employment Opportunity (EEO) Certification Form - CA109
Vermont Agency of Transportation Certificate of Compliance - CA271
Vermont Agency of Transportation Minimum Labor and Truck Rates - CA101
Commodity Index Prices - CA170
Schedule of Pay Items

Swanton-Highgate STP FPAV(77) Advertised May 20, 2026
Special Provisions Part I - Notice to Bidders Page 3
9. NOTICE TO BIDDERS - WINTER MAINTENACE. The Contractor is hereby notified that, not
withstanding any provisions in the Division 100 General Provisions, Section 406 specifications,
or elsewhere in the Contract Documents that might otherwise be interpreted to allow a milled
surface to remain in place over the winter shutdown period as the travel surface, it is the explicit
intent of the Agency that all portions of the roadway milled during the 2026 construction season
must be fully completed through the placement of the permanent wearing course and application
of final pavement markings prior to the onset of winter maintenance operations.
(a) No milled surfaces shall be left exposed or protected only by a leveling course, temporary
or otherwise, through the winter period.
(b) In the event the Contractor is unable to complete the permanent wearing course and final
markings on any milled section due to scheduling, weather, or other factors before the
winter shutdown, the Contractor shall, at no additional cost to the Agency, install a suitable
temporary asphalt mix and temporary pavement markings, as approved by the Engineer to
provide a safe, drivable, and maintainable surface through winter. The temporary asphalt
mix shall be a minimum of 1.25 inches of Type IVS pavement, unless otherwise directed
by the Engineer.
(c) Removal of temporary asphalt mix will be done at no cost to the agency.
(d) The Engineer shall have full authority to direct the installation and removal of such
temporary measures and to withhold progress payments or enforce other remedies if the
Contractor fails to comply.
10. NOTICE TO BIDDERS - NEW PREQUALIFICATION FORM. The Contractor is hereby
notified that the Agency is required by the U.S. Department of Transportation to develop and
maintain a list of information about all firms that bid on federally funded Contracts in accordance
with 49 C.F.R. 26.11. The Agency has developed a new electronic form to collect this
information. The Contractor shall fill out this form as part of their project-specific prequalification
for every Contract that they bid on. A link to this form is provided in the prequalification form
available through iCX and the Agency's website.
11. NOTICE TO BIDDERS - DAVIS-BACON. U.S. Department of Labor Davis-Bacon wage rates
are applicable to this Contract. Copies of the applicable rates are included in this proposal.
12. NOTICE TO BIDDERS - STANDARD DRAWINGS. The Vermont Agency of Transportation
Standard Drawings listed on the Index of Sheets are not included in the plan set, but may be found
at the following address:
https://resources.vtrans.vermont.gov/resources/cadd/VAOTconSTD_Name.xml?_gl=1*6cpy62*
_ga*MTU5MTQ3NTcyNi4xNzIwMjM5NjI0*_ga_V9WQH77KLW*czE3NTI3NTYyMzQkbzE
3NCRnMSR0MTc1Mjc1NjkwMyRqNjAkbDAkaDA.

Swanton-Highgate STP FPAV(77) Advertised May 20, 2026
Special Provisions Part I - Notice to Bidders Page 4
13. NOTICE TO BIDDERS - INFORMATIONAL DOCUMENTS. The Contractor is hereby notified
that the following informational documents for this Contract are available on iCXWeb and the
VTrans Bid Opportunities website. These documents are being provided during the bid solicitation
period for informational purposes only.
(a) Traffic Management Plan (TMP) Checklist
14. NOTICE TO BIDDERS - SURFACE WATER WITHDRAWAL. The Contractor is hereby
notified that the Vermont state law, Act 135 of 2022, requires any person withdrawing surface
water (as defined in 10 V.S.A. 1002 (20)) to register with and report the water withdrawal and
usage to the Vermont Department of Environmental Conservation beginning January 1, 2023.
Guidance can be found here: https://dec.vermont.gov/watershed/rivers/streamflow-protection/act-
135-surface-water-withdrawal-registration-and-reporting
15. NOTICE TO BIDDERS - ENVIRONMENTAL COMMITMENTS.
(a) Threatened, Endangered, and Rare Species. The Contractor shall ensure all personnel
working on the project site are made aware of the potential presence and protected status
of the state and federal listed bats. No suitable bat habitat is present within the project
limits, and no Time-of-Year (TOY) restrictions are required.
The Contractor is hereby made aware of the potential for TOY restrictions related to
proposed off-site activities. Cutting trees 3" DBH inches in diameter outside of the
contract project limits shall require review under Section 105.25 Opening Off-Site Activity
Areas.
(b) Invasive Material. If invasive species are delineated on the Plans or found in the project
area and confirmed by the Engineer, the invasive species, and any soil excavated from
areas that contained the invasive species, will be termed invasive material.
The Contractor shall handle the invasive material in accordance with the VTrans State
Highway System Roadside Terrestrial Invasive Plants Best Management Practices
(BMPs). The Contractor shall stockpile the invasive material separately from other soil
stockpile areas. A ground barrier and perimeter containment system shall be in place
around the area intended for stockpiling the invasive material. Equipment shall be cleaned
of all soil and plant matter prior to arriving on site in accordance with Subsection 107.06.
The equipment used for excavation and transport of invasive material shall be cleaned of
all soil and plant matter before being used for work in other areas in accordance with the
BMPs.

Swanton-Highgate STP FPAV(77) Advertised May 20, 2026
Special Provisions Part I - Notice to Bidders Page 5
To the extent possible, invasive material shall be reused on site. Invasive material shall
only be reused on site in areas where the presence of the invasive species were clearly
evident. If there is an excess of invasive material, it shall be wasted in accordance with the
BMPs.
The cost of excavating invasive material will be paid for under the appropriate Contract
excavation items. When invasive species are delineated on the Plans, the additional cost
for handling invasive material, following the BMPs, cleaning equipment, and wasting
excess invasive material will be incidental to all other Contract items. When invasive
species are not delineated on the Plans, and compensation is not otherwise provided for in
the Contract, the work of handling invasive material, following the BMPs, cleaning
equipment, and wasting excess invasive material will be considered extra work in
accordance with Subsection 104.03 and will be paid for in accordance with Subsection
109.06.
16. NOTICE TO BIDDERS - UTILITIES. Existing aerial facilities owned by Comcast, Consolidated
Communications, and Swanton Electric will not require adjustment. The Contractor is cautioned
to protect these facilities from damage.
Existing underground facilities owned by Vermont Gas Systems will not require adjustment. The
Contractor is cautioned to protect these facilities from damage.
Contacts for the above listed companies are as follows:
Comcast Marc Descoteaux (802) 999-7504
Consolidated Communications Jason Lavery (802) 338-0793
Swanton Electric Duane Couture (802) 393-5959
Vermont Gas Systems Adam Gero (802) 376-9699
Employees or agents of the above listed companies are to be allowed free and full access within
the project limits with the tools, materials, and equipment necessary to install, operate, maintain,
place, replace, relocate, and remove their facilities.
There will be no extra compensation paid to the Contractor for any inconvenience caused by
working around and with the companies, or their facilities. Should the Contractor desire additional
adjustments of the utility facilities for his/her convenience, proper arrangements shall be made in
conformance with Subsection 105.09.

Project Contractor Anticipated Contract
Completion Date
Colchester-Swanton IM 089-3(85) Colchester-Swanton IM 089-3(86) TBD TBD October 15, 2027 October 15, 2027

Swanton-Highgate STP FPAV(77) Advertised May 20, 2026
Special Provisions Part I - Notice to Bidders Page 6
There are areas of underground utilities that may require additional locating beyond normal dig
safe measures The Contractor is hereby notified that exploratory excavation to locate existing
underground facilities may be necessary to protect these facilities from damage. Where approved
by the Engineer, these utilities shall be located and/or exposed by methods such as air/vacuum
excavation and/or hand digging to determine their exact location. This exploratory work shall be
classified as Trench Excavation of Earth, Exploratory and payment shall be through Pay Item
"204.2200, Trench Excavation of Earth, Exploratory, (N.A.B.I)."
Vermont Statutes Annotated, Title 30, Chapter 86 ("Dig Safe") requires notice to Dig Safe before
starting excavation activities. The Contractor must telephone Dig Safe at 811 at least 72 hours
(excluding Saturdays, Sundays and legal holidays) before, but not more than 30 days before,
starting excavation activities at any location. In addition, before excavation and/or pavement
grinding in or on the state highway right-of-way, the Contractor must contact the Agency's Traffic
Signal Superintendent, Dan Ertel, to obtain/verify the location of Agency's underground utility
facilities or to confirm the absence of such facilities. Dan can be reached at (802) 343-2188.
The Contractor is advised that many towns are not members of Dig Safe. It is the Contractor's
responsibility to check with towns prior to excavation and shall protect and restore utilities
damaged within the project and as set forth in Subsection 107.12.
All Contractors, subcontractors or material suppliers involved in any project-related activity shall
comply with all applicable codes and regulations related to working around live electrical lines;
including, but not limited to maintaining the required minimum clear distance from an electrical
utility facility. The Contractor's Competent Safety Officer shall be well versed in OSHA and
VOSHA regulations and shall be capable of implementing a plan to conform to these regulations
during prosecution of work.
17. NOTICE TO BIDDERS - CONCURRENT CONSTRUCTION. The Contractor is made aware of
the following VTrans construction project(s) which are expected to be in progress within the area
of this project during its construction.
TABLE 1 - CONCURRENT CONSTRUCTION PROJECTS
Anticipated Contract
Project Contractor
Completion Date
Colchester-Swanton IM 089-3(85) TBD October 15, 2027
Colchester-Swanton IM 089-3(86) TBD October 15, 2027
This list is not all-inclusive and it is possible there may be other VTrans, municipal, or private
construction projects within the area of this project during its construction.

Swanton-Highgate STP FPAV(77) Advertised May 20, 2026
Special Provisions Part I - Notice to Bidders Page 7
The Contractor shall coordinate construction schedules and traffic control with the work required
for these projects.
There will be no extra compensation paid to the Contractor for any inconvenience caused by
working around these or other projects.
18. NOTICE TO BIDDERS - SPECIAL CONSTRUCTION REQUIREMENTS.
(a) The Contractor shall maintain a safe access to all drives and intersecting side roads at all
times during the construction of this project.
(b) During construction it will be necessary for the Contractor to maintain one-lane traffic for
extended periods of time. In no case shall the paved width for this one-lane traffic,
including shoulders, be reduced to less than 11 feet. This paved width shall remain free of
obstructions and obstacles at all times.
(c) The Contractor shall position Portable Changeable Message Signs at locations determined
by the Engineer properly warning motorists of the roadway conditions ahead. As directed
by the Engineer, these locations may change during construction as needs arise based on
daily work activities. The message to be displayed shall be submitted to the Engineer in
advance for approval. The displayed message should accurately reflect what motorists can
expect to encounter through the project area. The cost of providing the Portable Changeable
Message Signs shall be paid for under Contract item 641.1500. The Contractor shall also
install and maintain appropriate construction signing warning the traveling public of the
expected roadway surface conditions.
(d) Prior to final acceptance of the project, all drop inlets and bridge joints within the project
limits shall be cleaned and all material within the drop inlets and bridge joints shall be
removed. All paved areas adjacent to curbs shall be swept and cleaned of all extraneous
material. Costs for this work will not be paid for directly but will be considered incidental
to all Contract items.
(e) There are special events throughout the year that may require close communication and
coordination between the Contractor and the municipality to reduce conflicts. The
municipality will advise the Engineer and Contractor of the specifics of each event and the
Engineer will direct the Contractor as to what actions, if any, will be necessary on the
Contractor's part to minimize impacts to the event. Special events that may conflict with
Contractor operations are not limited to those which may be listed in this Notice to Bidders.
There will be no extra compensation paid to the Contractor for any inconvenience caused
by working around any listed or unlisted special events.
For more information about area special events, contact the following:

Swanton-Highgate STP FPAV(77) Advertised May 20, 2026
Special Provisions Part I - Notice to Bidders Page 8
Swanton: Cathy Fournier, Town Clerk
P.O. Box 711
1 Academy Street
Swanton, VT 05488
(802) 868-4421
Highgate: Wendi Dusablon, Town Clerk
P.O. Box 189
2996 VT RT 78
Highgate, VT 05459
(802) 868-5002
19. NOTICE TO BIDDERS - AFAD. The Contractor is hereby notified that Automated Flagger
Assistance Devices (AFADs) are remotely operated devices that enable a certified flagger to be
positioned out of the lane of traffic and are used to control motorists through work zones.
AFADs shall only be used in situations where there is no more than one lane of approaching traffic
that needs to be controlled. Additionally, since AFADs are not traffic control signals, they shall
not be used to replace traffic signals or other continuously operating traffic control devices.
These devices may be used as a safety enhancement to flaggers on an hour-for-hour basis. AFADs
shall meet the following requirements:
(a) All AFAD applications shall meet the requirements of the applicable sections of the current
edition of the Manual on Uniform Traffic Control Devices (MUTCD).
(b) All AFAD applications shall be in accordance with NCHRP Report 350 or the MASH for
the applicable test level and device weight. Documentation of the crashworthiness of the
device shall be submitted to the Engineer for approval prior to use on the project.
(c) AFAD applications shall always be controlled by a flagger who has been trained in the
operation of the AFAD and who meets the requirements of Section 630. The flagger shall
not flag traffic and operate an AFAD at the same time.
(d) Should an AFAD malfunction or otherwise not function as intended they shall be replaced
by another AFAD or flagger(s) or work shall cease and the roadway shall be opened to
unrestricted traffic flow immediately.
(e) Each AFAD will be considered equivalent to one flagger and will be measured and paid
for on an hourly basis under Item 630.1500 Flaggers. One hour of AFAD use shall be paid
for as one hour of flagging.

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Roadway Line Striping and Markings Request Date: 7/24/2026 2:23:32 PM Open Date: Closing

State Government of Vermont

Bid Due: 8/19/2026

Bid Title: Roadway Line Stripings and Markings Category: RFPs, RFQs and Bids Status:

City of Winooski

Bid Due: 8/19/2026

SOS Next Generation Licensing Platform O&M Support Request Date: 7/27/2026 11:48:48 AM Open

State Government of Vermont

Bid Due: 8/28/2026

TITLE QUESTIONS DUE ANSWERS POSTED DUE DATE NO POSTING AFTER SOS Next Generation

State of Vermont

Bid Due: 8/28/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.